Prix de gros du concasseur à mâchoires certifié Jc5000
Cibler les goulots d’étranglement primaires du concassage: The HighCost of Compromise
Your primary crushing stage sets the tone for your entire downstream process. Inefficiency here cascades, eroding profitability. Are you grappling with the true costs of your current jaw crusher? Consider these operational challenges: Unplanned downtime due to premature wear part failure, coûtant des milliers de dollars par heure en perte de production. Inconsistent feed opening and uneven wear patterns leading to unpredictable product gradation and increased recirculating load. Excessive vibration and structural stress that accelerates fatigue on the chassis and foundation, demanding costly structural repairs. High energy consumption per ton of material processed, directly impacting your operating margin. The constant tradeoff between throughput capacity and final product quality.
Introducing the Certified Jc5000 Jaw Crusher: a heavyduty, singletoggle jaw crusher engineered for maximum throughput and longevity in the most demanding primary crushing applications. Designed for stationary plant installation or robust mobile setups, it processes quarried rock, béton de démolition, and runofmine ore up to 1200mm in size.
Flux de travail opérationnel:
1. Alimentation & Présélection: Oversize material is directed into the large feed hopper, with optional grizzly prescreening to bypass fines.
2. Coup d'écrasement agressif: The highinertia flywheels and an aggressive elliptical crushing motion ensure efficient nipangle breaking at the inlet.
3. Décharge contrôlée: The hydraulic toggle adjustment system allows operators to set the closedside setting (CSS) under load for precise product size control.
4. Material Ejection: Crushed material exits with minimal slabby or flaky product due to the optimized chamber geometry.
Champ d'application: Idéal pour la production de granulats à fort tonnage, hard rock mining primary stations, and largescale construction & demolition recycling plants.
Limites: Not designed for grinding or ultrafine reduction; maximum feed size and material abrasiveness are bounded by its design specifications.
Fonctionnalités principales: Engineering for Operational Superiority
Conception de cadre robuste | Base technique: Analyse par éléments finis (FEA) répartition optimisée des contraintes | Avantage opérationnel: Élimine les fissures de fatigue du cadre sous charge cyclique, ensures alignment integrity | Impact sur le retour sur investissement: Réduit le risque de défaillance structurelle catastrophique, extends service life beyond 20+ années
Système de réglage à bascule hydraulique | Base technique: Hydraulic ram replaces traditional mechanical shims | Avantage opérationnel: CSS adjustment in minutes versus hours, even while empty | Impact sur le retour sur investissement: Réduit les temps d'arrêt pour les changements de produits jusqu'à 80%, augmente la flexibilité de l'usine
Trempé & Tempered Jaw Dies | Base technique: ISO9001certified alloy steel with specialized heat treatment | Avantage opérationnel: Achieves optimal hardnesstoughness balance, resisting abrasive wear and fracture | Impact sur le retour sur investissement: Augmente la durée de vie de 3050% par rapport à l'acier au manganèse standard, réduire le coût du coût
Spherical Roller Bearing Assembly | Base technique: Largediameter bearings with automated lubrication ports | Avantage opérationnel: Supports high radial and axial loads, runs cooler under continuous duty | Impact sur le retour sur investissement: Proven bearing service intervals exceeding 24,000 heures, eliminating a common failure point
PLCIntegrated Protection System | Base technique: Continuous monitoring of power draw, bearing temperature, et pression hydraulique | Avantage opérationnel: Prevents tramp metal damage through automated clearing cycles and immediate shutdown on fault detection | Impact sur le retour sur investissement: Protects core components from irreversible damage, avoiding sixfigure repair bills
Competitive Advantages of the Certified Jc5000 Jaw Crusher
| Mesure de performances | Norme de l'industrie (Classe comparable) | Jc5000 Solution Documented Result | Avantage (% Amélioration) |
| : | : | : | : |
| Disponibilité (Temps de disponibilité)| 9294% | Les données de terrain sont cohérentes >96% disponibilité| +34% |
| Porter la vie (Roche Abrasive)| ~450,000 metric tons per set | Average documented life of 650,000 tonnes métriques| +44% |
| Efficacité énergétique| 0.85 kWh/metric ton processed| Verified average of 0.72 kWh/metric ton| +15% réduction |
| Temps d'ajustement CSS| 24 heures (mechanical shim) | <30 minutes (système hydraulique) |< 85% |
Based on aggregated field performance reports from installed units in granite and basalt quarries.
Spécifications techniques
Ouverture d'alimentation: 1500mm x 1200 mm (59" x 47")
Taille maximale d'alimentation: Jusqu'à 1200 mm (47") longueur du bord
Réglage du côté fermé (CSS) Gamme: 150mm 300mm (6" 12")
Plage de capacité: Jusqu'à 1,750 tonnes métriques par heure (dépend du matériel d'alimentation et du CSS)
Exigence de puissance d'entraînement: Dual drive configuration requiring a total connected power of up to kW/HP.
Poids du concasseur (Unité de base): Approximately XX metric tons.
Construction du cadre principal: Fabricated from heavyduty steel plate with reinforced ribbing; stressrelieved before machining.
Swing Jaw Construction: Forged from a single piece of highstrength steel.
Plage de température de fonctionnement: 20°C à +40°C (4°F à +104°F) with standard lubricants.
Scénarios d'application
Granite Aggregate Quarrying Challenge:
A largescale quarry faced excessive downtime every two weeks for manual jaw gap adjustment using shims. Product consistency drifted between adjustments.
Solution:
Implementation of a Certified Jc5000 Jaw Crusher as the primary unit.
Résultats:
CSS adjustments reduced from biweekly fourhour tasks to tenminute procedures. Plant managers reported a measurable improvement in gradation consistency (+/5% variance), enabling more efficient downstream screening.
Iron Ore Primary Crushing Challenge:
An iron ore processing plant struggled with premature bearing failures in their primary crusher every ~18 months due to extreme dust ingress and high cyclic loads.
Solution:
Installation of a Certified Jc5000 with its sealed spherical roller bearing labyrinth system connected to an automated grease injection system.
Résultats:
Bearing inspection after two years showed no signs of contamination or spalling. Projected service life now exceeds five years based on condition monitoring data.
Considérations commerciales
The Certified Jc5000 is positioned as a capital investment focused on total cost of ownership reduction over a minimum tenyear horizon.
Niveaux de tarification: Base equipment pricing is structured around drive motor configuration options (par ex., standard efficiency vs. premium efficiency motors). Export packaging standards also affect base price.
Fonctionnalités facultatives & Trousses: Key options include an integrated automatic lubrication system for bearings and toggle area; various jaw die profiles for different applications; different liner materials for feed hopper; motor starter package; advanced condition monitoring sensors tied directly into plant SCADA systems.
Forfaits de services: Threetiered plans are available:
Bronze – Extended warranty coverage on major components.
Silver – Bronze benefits plus annual inspection by factorycertified technicians.
Gold – Allinclusive coverage including scheduled wear part replacement at prenegotiated rates.
Options de financement: Available through partnered financial institutions include standard equipment leasing structures or project financing tailored for greenfield installations.
Foire aux questions
1. Is the Certified Jc5000 compatible with our existing secondary/tertiary crushing circuit?
Oui. Its precisely controllable CSS allows you to tune its output gradation as optimal feed stock for your cone crushers or further processing stages.
2. Quel est l’impact attendu sur la consommation énergétique globale de notre usine?
Industry testing demonstrates that its higher throughput per kWh can reduce primary crushing energy costs by approximately . This impact is most significant in operations running multiple shifts.
3. How does the hydraulic toggle system handle tramp metal events?
The system includes an automatic release function that allows the moving jaw to yield under extreme pressure from uncrushable material before resetting itself—minimizing downtime without manual intervention.
4.What are typical lead times for delivery?
For standard configuration units built against forecast orders lead time is typically XX months exworks Confirmed orders will receive firm scheduling upon deposit receipt
5.Are there financing options available that separate equipment cost from installation services?
Yes project financing can be structured such that site preparation electrical work installation commissioning services are bundled into a single agreement providing clear budget control
6.Quelle formation est dispensée à notre équipe de maintenance?
A comprehensive twoday onsite training program covering operation daily checks routine maintenance procedures troubleshooting guides is included with every unit purchase
7.Can we source compatible wear parts locally or must they be OEM?
While dimensional drawings are available allowing local fabrication we strongly recommend genuine OEM parts Their metallurgical specifications directly influence documented performance metrics like throughput wear life


