500 Spécifications des fournisseurs d'installations de lavage d'or Tph

Brève description:

H1: 500 Usine de lavage d'extraction d'or TPH: Conçu pour les volumes élevés, HighRecovery Operations 1. PAINPOINT DRIVEN OPENING Scaling alluvial or placer gold operations to 500 TPH introduces distinct operational and financial challenges. Plant managers and engineering contractors face significant pressure to maintain profitability amidst variable feed material, rising operational costs, and stringent environmental regulations. Common pain…


Détail du produit

Mots clés du produit

H1: 500 Usine de lavage d'extraction d'or TPH: Conçu pour les volumes élevés, HighRecovery Operations

1. OUVERTURE ENTRAÎNÉE PAR POINT DE DOULEUR

Scaling alluvial or placer gold operations to 500 TPH introduces distinct operational and financial challenges. Plant managers and engineering contractors face significant pressure to maintain profitability amidst variable feed material, rising operational costs, and stringent environmental regulations. Les points douloureux courants incluent:

Taux de récupération incohérents: Variable clay content and particle size distribution can lead to gold losses in fines or to tailings, impactant directement les revenus. UN 2% loss in recovery at 500 TPH can equate to substantial annual revenue forfeiture.
Temps d'arrêt excessif & Entretien: Inadequate scrubbing, poor screen design, or underpowered components lead to frequent clogging, wearrelated failures, et arrêts imprévus, crippling your throughput targets.
Hautes eaux & Consommation d'énergie: Inefficient washing and screening processes consume excessive resources, escalating operational expenses and complicating water management in waterscarce regions.
Difficulty Handling Problematic Material: Sticky clay, graviers cimentés, and large oversize material can bring a conventional trommel or scrubber to a halt, creating bottlenecks before material even reaches the concentration stage.
Rapid Asset Depreciation: Equipment not built for 24/7 mining duty suffers from accelerated wear, leading to higher longterm capital replacement costs.

Are you seeking a washing plant solution that delivers consistent 500 TPH throughput while maximizing recovery and controlling the total cost of ownership?

2. APERÇU DU PRODUIT

UN 500 TPH Gold Mining Washing Plant is a complete modular processing system designed for the primary beneficiation of alluvial gold deposits. Its core function is to liberate gold from waste gravels and clays through rigorous scrubbing and efficient size classification, preparing a concentrated feed for downstream recovery units like sluices, gabarits, or centrifugal concentrators.

Flux de travail opérationnel:
1. Alimentation principale & Scalping: Runofmine (ROM) material is fed via dump truck or loader into a robust hopper with grizzly bars to remove extreme oversize (>200mm).
2. Gommage agressif & Clay Disintegration: Material enters a heavyduty rotary scrubber or trommel screen where highimpact lifters and continuous water spray break apart cemented aggregates and dissolve sticky clays.
3. Classification de taille primaire: The scrubbed ore reports to a vibrating screen deck (typically within the trommel or as a separate unit) to separate the target size fraction (par ex., 20mm +2mm) contenant de l'or libéré.
4. Lavage secondaire & Assèchement: The undersize slurry may pass through additional log washers or hydrocyclones for further cleaning before being directed to the recovery circuit. Screw classifiers or dewatering screens produce a manageable pulp density.
5. Waste Stream Management: Roches surdimensionnées (+75mm) are conveyed to waste stockpiles, while processed fines and silt are managed in settling ponds or tailings storage facilities.

Champ d'application & Limites:
This plant is optimal for largescale alluvial/placer deposits with significant clay content requiring intensive washing. It is not suitable for hard rock (filon) mining without prior crushing circuits. Performance is contingent on accurate feed characterization—particularly clay percentage, teneur en humidité, and abrasiveness—during the design phase.

3. CARACTÉRISTIQUES PRINCIPALES

Épurateur rotatif robuste | Base technique: Hightorque drive system with reinforced lifters | Avantage opérationnel: Ensures complete disintegration of cemented gravels and tough clay nodules without stalling | Impact sur le retour sur investissement: Eliminates precrushing stages for many deposits, reducing upfront CAPEX and ongoing energy costs.

Conception modulaire montée sur patins | Base technique: Preassembled structural steel skids with integrated walkways and piping | Avantage opérationnel: Réduit le temps d'installation sur site jusqu'à 40%, minimizes civil works foundation costs | Impact sur le retour sur investissement: Faster commissioning accelerates timetorevenue; simplifies relocation between mine sites.

Tier3/TierFinal DieselElectric Power Pack | Base technique: Centralized diesel generators powering individual electric motors on each module | Avantage opérationnel: Provides operational flexibility in remote locations; significantly lower fuel consumption compared to direct diesel hydraulic drives | Impact sur le retour sur investissement: Cuts fuel costs by an estimated 1525% tout au long du cycle de vie de la plante.

Système avancé de recyclage de l’eau | Base technique: Multistage settling ponds with optional thickener/clarifier integration | Avantage opérationnel: Reduces fresh water makeup requirements by over 70%, ensuring compliance with environmental discharge regulations | Impact sur le retour sur investissement: Lowers water sourcing costs and mitigates risk of regulatory shutdowns.

Intelligent Process Control Panel | Base technique: PLCbased monitoring of feed rate, motor amperage, pression de l'eau, and pump speeds | Avantage opérationnel: Allows operators to optimize performance in realtime based on feed changes; fournit un diagnostic précoce des pannes | Impact sur le retour sur investissement: Empêche les pannes catastrophiques; maintains consistent throughput and recovery through informed adjustments.

Ensemble de doublure résistante à l'abrasion | Base technique: Highchrome iron liners in scrubber barrel; AR400 steel on chutes and hoppers; panneaux d'écran en polyuréthane | Avantage opérationnel: Extends service intervals for critical wear components in highabrasion environments | Impact sur le retour sur investissement: Reduces annual spare parts expenditure by approximately 30% versus standard manganese steel.

Integrated Sampling System | Base technique: Automated crossstream cutter sampler on final tailings line | Avantage opérationnel: Provides continuous metallurgical accounting data to track plant performance and recovery efficiency | Impact sur le retour sur investissement: Enables datadriven optimization decisions that can improve overall recovery by measurable percentages.

4. AVANTAGES CONCURRENTIELS

| Mesure de performances | Norme industrielle pour 500 Usines TPH | Notre 500 Solution pour usine de lavage TPH | Avantage (% Amélioration) |
| : | : | : | : |
| Efficacité de désintégration de l'argile (for medium plasticity clay) ~85% scrubbing efficiency ~95%+ scrubbing efficiency +1012% |
| Fresh Water Consumption ~4500 m³/day ~1350 m³/day 70% |
| Temps moyen entre les pannes (Critical Scrubber Bearings) ~2,000 operating hours ~3,200 operating hours +60% |
| Installation sur site & Commissioning Time ~68 weeks ~45 weeks 33% |
| Efficacité globale de récupération (Au libéré >100 micron) Varie considérablement; often unoptimized Consistently >98% capture in controlled feed Up to 8% amélioration |

Field data shows overall site recovery is dependent on correct downstream concentration equipment selection.

5. SPÉCIFICATIONS TECHNIQUES

Nominal Throughput Capacity: 500 tonnes métriques par heure (base d'alimentation sèche).
Taille du matériau d'alimentation: Jusqu'à 200 mm (subject to grizzly spacing).
Exigences d'alimentation: Total installed power ~750 kW. Typically supplied by dual 500 kVA diesel generator sets or grid connection.
Besoins en eau: System makeup water requirement approximately 1,800 – 2,200 US GPM depending on clay content; heavily reduced with closedcircuit recycling.
Spécifications des matériaux clés:
Coque de tambour d'épurateur: 16mm mild steel with bolton highchrome liner segments.
Plateformes d'écran: Polyurethane modular panels on primary sizing deck.
Charpente métallique: ASTM A36 peint avec un apprêt époxy industriel.
Pompes à lisier : Heavyduty rubberlined centrifugal pumps.
Dimensions physiques (Modulaire): Approximate footprint of main processing modules is 35m L x .20m W x .15m H.
Plage de fonctionnement environnementale: Conçu pour des températures ambiantes de 20°C à +50°C. Dust suppression sprays are standard at transfer points.

6. SCÉNARIOS D'APPLICATION

Projet d'or alluvial en Afrique de l'Ouest

Challenge A new concession with high lateritic clay content was causing severe blinding in competitor's screening equipment,
leading to daily downtime for manual cleaning
and estimated gold losses of
15%
in the fine fraction due
to poor liberation
Solution Implementation of our
500 TPH washing plant featuring an extended residence time scrubber
and specialized screen media spray bars Results Achieved sustained design throughput within three days of commissioning Claybound agglomerates were fully broken down resulting in a measured liberation efficiency increase that contributed directly
to an overall site recovery improvement from
82%
à
89%500 Spécifications des fournisseurs d'installations de lavage d'or Tph

LargeScale Placer Mine Relocation North America Challenge A contractor needed

to relocate their entire processing operation between two distant sections of a river valley within a single seasonal shutdown period minimizing lost production Solution Procurement of our skidmounted modular washing plant designed for rapid demobilization transport,
and reassembly Results The plant was disassembled transported over
300 miles,
and recommissioned at the new site in under seven weeks compared
to an estimated fourteen weeks required for their previous fixedstructure plant

7 CONSIDÉRATIONS COMMERCIALES

Les niveaux de tarification des équipements sont structurés autour de la configuration de base:500 Spécifications des fournisseurs d'installations de lavage d'or Tph

Base Configuration Tier Includes primary scalping heavyduty scrubber trommel screen vibrating sizing deck basic walkways,
and control panel Starting investment aligns with industry standards for engineered equipment of this scale

Optional Features Upgrade packages include:
Advanced Water Management Module automated thickener polymer dosing system)
Premium Wear Liner Package extended life ceramic composite options)
Onboard Laboratory Sampling Station)
Spare Parts Starter Kit)

Forfaits de services:
Commissioning Supervision field technician support during startup)
Annual Preventive Maintenance Inspection scheduled inspections parts inventory planning)
Remote Monitoring Support subscriptionbased access

Financing Options We work with international export credit agencies project finance specialists,
and equipment leasing companies

8 FAQ

What upstream equipment is required To achieve consistent feeding we recommend frontend loaders minimum bucket capacity

Is this plant compatible Can be configured discharge slurry directly into sluice boxes jigs centrifugal concentrators pulp density optimized

What are typical operating labor requirements For steadystate operation one control room operator two field inspectors conducting rounds per shift

How do you guarantee performance Our process engineering team conducts comprehensive analysis prior finalizing design Performance expectations based testwork outlined detailed process guarantee document prior contract execution

What delivery timeline Delivery exworks months from order confirmation subject final engineering approval Shipping logistics managed through partners

Do you provide training Yes comprehensive classroom practical training provided commissioning covering operation maintenance troubleshooting safety procedures

Laissez votre message

Écrivez votre message ici et envoyez-le-nous

Laissez votre message