Luxury Top Ten Stone Crusher Machine Quote
1. PAINPOINT DRIVEN OPENING
Are escalating operational costs and unpredictable downtime eroding your aggregate production margins? For plant managers and engineering contractors, the core challenges in primary crushing often center on three critical areas: excessive wear part consumption driving up costperton, unplanned stoppages for maintenance that disrupt entire downstream processes, and inconsistent output gradation that fails to meet stringent project specifications. The financial impact is measurable: every hour of crusher downtime can result in thousands in lost production and labor costs, while premature liner changes add significant material expense. Are you currently evaluating how to achieve higher throughput without a proportional increase in energy consumption? Is reducing the frequency of highrisk, manual interventions in the crushing chamber a priority for your safety goals? The selection of your primary stone crusher machine is not merely an equipment purchase; it is a decisive factor in your site's longterm profitability and operational stability.
2. PRODUCT OVERVIEW
This document details our flagship Jaw Crusher, engineered as a heavyduty primary stone crusher machine for the initial reduction of hard, abrasive materials like granite, basalt, and river rock. Its operational workflow is designed for reliability: (1) Material is fed into the vibrating grizzly feeder, which bypasses fines to optimize chamber loading. (2) Oversize material enters the deep crushing chamber where a highstrength moving jaw compresses it against a fixed jaw. (3) The crushed material discharges at the bottom with a consistent, adjustable output size. (4) The hydraulic toggle system provides automatic overload protection. (5) The process repeats in a continuous cycle with reverse crushing action to minimize clogging.
Application Scope: Ideal for stationary quarry plants, largescale mining operations, and major infrastructure projects requiring primary crushing of materials with compressive strength up to 400 MPa.
Key Limitations: Not suitable for recycling mixed demolition waste with high rebar content without prescreening. For highly abrasive silicarich ores, specific liner metallurgy is recommended.
3. CORE FEATURES
Deep Crushing Chamber & Optimized Kinematics | Technical Basis: Enhanced nip angle and longer stroke profile | Operational Benefit: Increases capacity by up to 15% compared to conventional designs and produces a more uniform product shape | ROI Impact: Higher yield of inspec product reduces recirculation load, directly lowering costperton.

HeavyDuty Fabricated Frame | Technical Basis: Stressrelieved steel plate construction with reinforced ribs | Operational Benefit: Provides exceptional durability against shock loads and fatigue, extending structural life beyond 20 years in severe service | ROI Impact: Eliminates risk of catastrophic frame failure and associated production losses, protecting capital investment.
Hydraulic Toggle Adjustment System | Technical Basis: Replaceable hydraulic cylinder for setting adjustment and tramp iron release | Operational Benefit: Allows operators to adjust CSS quickly under load and automatically reset after an uncrushable event, reducing downtime from hours to minutes | ROI Impact: Minimizes nonproductive time and prevents damage to other components, ensuring higher plant availability.
Premium Bearing Assembly | Technical Basis: Spherical selfaligning roller bearings on both pitman and main frame | Operational Benefit: Supports higher load capacities and compensates for minor misalignments, running cooler than standard bushings | ROI Impact: Extends bearing service life by an average of 30%, reducing spare part inventory costs and associated maintenance labor.
Bolted & Wedged Liner Design | Technical Basis: Modular liner fastening system without traditional backing material | Operational Benefit: Enables faster, safer liner changes; individual segments can be replaced without removing entire jaw sets | ROI Impact: Reduces liner changeout time by approximately 40%, increasing crusher utilization rates.
Integrated Motor Base & Belt Guard | Technical Basis: Unified baseplate design with OSHAcompliant guarding | Operational Benefit: Simplifies installation alignment, enhances drive belt safety, and reduces footprint requirements | ROI Impact: Lowers installation costs by an estimated 15% and ensures compliance from commissioning.

4. COMPETITIVE ADVANTAGES
| Performance Metric | Industry Standard Benchmark | Our Jaw Crusher Solution | Documented Advantage |
| : | : | : | : |
| Liner Life (Abrasive Granite) | 450,000 550,000 tons per set| 650,000 750,000 tons per set| +25% improvement |
| Throughput Capacity (tph) @ CSS 6"| 550 600 tph| 680 720 tph| +18% improvement |
| Average Downtime per Liner Change| 24 36 hours| 14 18 hours| 50% reduction |
| Specific Energy Consumption (kWh/ton)| ~0.85 kWh/ton| ~0.72 kWh/ton| 15% improvement |
| Tramp Iron Recovery Time| Manual reset (~24 hrs)| Hydraulic reset (~1015 min)| 90% reduction |
5. TECHNICAL SPECIFICATIONS
Model: JC1408
Feed Opening: 56” x 80” (1400mm x 2000mm)
Maximum Feed Size: 48” (1200mm) edge length
Closed Side Setting (CSS) Range: 6” – 12” (150mm – 300mm)
Capacity Range: Up to 1 ,200 Short Tons per Hour (~1 ,090 metric tph), dependent on feed material and CSS.
Drive Power Requirement: 400 HP / 300 kW electric motor (VFD compatible).
Total Weight (Crusher Only): ~250 ,000 lbs (~113 ,400 kg).
Key Material Specifications: Main frame – ASTM A36 steel; Jaw dies – Manganese steel alloy (14%18%); Shaft – Forged 42CrMo4 steel.
Operating Ambient Temperature Range: 20°C to +45°C (4°F to +113°F).
Dust Emission Control: Compatible with dry fog or baghouse systems; preengineered mounting points provided.
6. APPLICATION SCENARIOS
Granite Quarry Expansion Project
Challenge A quarry operator needed to increase primary circuit throughput by 25% to fulfill a new highway contract but was constrained by space limitations preventing simple plant duplication.
Solution Two highcapacity JC1408 jaw crushers were installed in parallel with existing units but featured deeper chambers for higher volumetric throughput within a similar footprint.
Results Plant throughput increased by 32%. The improved energy efficiency resulted in a net power saving of 11% per ton crushed against projections. The contract was completed 18 days ahead of schedule due to consistent output gradation.
HighAbrasion Iron Ore Processing
Challenge An iron ore mine faced unsustainable wear costs on their primary crusher jaws due to highly abrasive silica content (58% improvement—directly reducing annual liner expenditure by over $120 ,000 USD while improving annual availability by approximately 180 hours.
7. COMMERCIAL CONSIDERATIONS
Our stone crusher machines are offered under three primary commercial structures:
1. Equipment Purchase:
Tier A Base Machine includes crusher assembly motor drives motor bases guards
Tier B Premium Package adds hydraulic setting adjustment automated lubrication system wear monitoring sensors
Tier C Turnkey Skid includes preassembled unit on structural skid with feeders walkways starter panels
2 Optional Features:
Dust suppression ring integrated into feed hopper
Remote monitoring telematics package for predictive maintenance
Special alloy liners for specific abrasion/corrosion profiles
3 Service Support Packages:
Standard Warranty includes parts labor for months or operating hours whichever comes first
Extended Protection Plan covers major components bearings shafts etc up to months or hours including scheduled inspections
Full Maintenance Contract provides fixedcost coverage for all wear parts inspections labor
Financing Options available through our partners include capital lease operating lease longterm rentaltoown structures tailored typically from months
8 FAQ
What are the foundation requirements for this jaw crusher?
A reinforced concrete foundation designed for dynamic loads exceeding times the static weight of the crusher assembly is required Detailed geotechnicalrated drawings are provided
Can this machine process recycled concrete or asphalt?
While capable it requires prescreening via grizzly or scalper to remove reinforcing bar tramp metal Preinstallation consultation is recommended as alternative liner configurations may be advised
How does the hydraulic toggle system improve safety?
It eliminates the need for manual adjustment using dangerous tension rod assemblies Operators adjust closed side settings from a control panel located away from moving parts significantly reducing exposure risk
What is your lead time from order placement?
For standard configuration lead times average weeks Custom configurations such as special liners or skid mounting may extend delivery by weeks depending on scope
Do you provide performance guarantees?
Yes we offer guaranteed minimum capacity based on agreed feed material analysis as well as guaranteed maximum power consumption under defined operating conditions These are formalized within the sales contract
What training do you provide for operations maintenance staff?
We include comprehensive onsite training during commissioning covering safe operation routine maintenance procedures troubleshooting guidelines Wear part changeout procedures are demonstrated practically
Are your machines compatible with existing automation systems?
The control system features standard Modbus TCP/IP protocols allowing integration into most modern PLCbased plant SCADA systems Interface documentation is supplied


