Gold Ore Crushing Equipment Oem Factory Minimum Order

Short Description:

1. PAINPOINT DRIVEN OPENING Are your gold ore processing operations constrained by unreliable primary crushing? Inconsistent feed size, excessive liner wear, and unplanned maintenance directly impact your mill throughput and recovery rates. Consider these common challenges: Unscheduled Downtime: Catastrophic failure of a critical crusher component can halt your entire processing line for days, costing thousands…


Product Detail

Product Tags

1. PAINPOINT DRIVEN OPENING

Are your gold ore processing operations constrained by unreliable primary crushing? Inconsistent feed size, excessive liner wear, and unplanned maintenance directly impact your mill throughput and recovery rates. Consider these common challenges:
Unscheduled Downtime: Catastrophic failure of a critical crusher component can halt your entire processing line for days, costing thousands per hour in lost production.
High Operating Costs: Premature wear on manganese liners and frequent part replacements under abrasive gold ore conditions create a significant and recurring expense.
Bottlenecked Throughput: An undersized or inefficient primary crusher limits feed to your SAG/Ball mill circuit, capping your plant’s overall gold production capacity.
Product Inconsistency: Poorly controlled discharge sizing leads to inefficiencies downstream, affecting grinding circuit performance and ultimately, recovery.

Is your current gold ore crushing equipment a source of cost and complexity rather than a foundation for reliability? The solution requires machinery engineered not just to crush, but to endure.Gold Ore Crushing Equipment Oem Factory Minimum Order

2. PRODUCT OVERVIEW

Our OEM factory specializes in the design and manufacture of heavyduty primary jaw crushers specifically configured for gold ore crushing applications. This equipment serves as the first critical stage in mineral liberation, reducing runofmine (ROM) ore to a consistent, manageable size for secondary processing.

Operational Workflow:
1. ROM gold ore is fed into the vibrating grizzly feeder (optional), which bypasses subsize material and directs oversize to the crusher.
2. Ore enters the robust crushing chamber of the jaw crusher, where a highpressure mechanical force is applied between a fixed and a moving jaw plate.
3. The compressive action breaks the ore along natural fissures and weaknesses.
4. Crushed material discharges through an adjustable gap at the bottom, determining the final product size.
5. The crushed product is conveyed to the next stage of your beneficiation circuit.

Application Scope & Limitations:
Scope: Ideal for primary crushing of hard and abrasive gold ores (quartz, sulphides), including runofmine material with large feed sizes. Suited for both stationary plant installations and modular plant designs.
Limitations: Not designed as a fine reduction or grinding machine. Maximum feed size is constrained by the specific model’s inlet dimensions. Performance is optimal with proper feed control to prevent choking.

3. CORE FEATURES

HeavyDuty Frame & Kinematics | Technical Basis: Finite Element Analysis (FEA) optimized stress distribution | Operational Benefit: Eliminates frame fatigue cracking under cyclical loading from hard rock; provides stability for consistent crushing geometry | ROI Impact: Extends structural life beyond 20+ years, reducing capital replacement risk.

AbrasionResistant Liners & Alloy Selection | Technical Basis: Proprietary manganese steel chemistry with workhardening properties | Operational Benefit: Liners develop a hardened surface layer during operation, dramatically increasing wear life in silicarich gold ores | ROI Impact: Reduces liner changeout frequency by 3050%, lowering parts inventory costs and labor hours.

Hydraulic Adjustment & Clearing | Technical Basis: Integrated hydraulic cylinders for toggle tension and chamber clearing | Operational Benefit: Allows operators to adjust CSS (Closed Side Setting) for product size control or clear blockages in minutes without manual intervention | ROI Impact: Minimizes downtime for routine adjustments by over 70% compared to manual shim systems.

Spherical Roller Bearings & Labyrinth Seals | Technical Basis: Oversized bearings rated for heavy radial and thrust loads; multistage sealing | Operational Benefit: Handles peak loads from uncrushable material; effectively excludes dust and contaminants from bearing housing | ROI Impact: Bearing service intervals exceed 10,000 hours, preventing costly bearing failures—a leading cause of crusher downtime.

Optimized Crushing Chamber Design | Technical Basis: Computermodeled nip angle and stroke profile for specific gold ore characteristics | Operational Benefit: Promotes interparticle crushing for improved reduction ratios and more consistent product gradation | ROI Impact: Increases effective throughput capacity by ensuring efficient breakage per cycle.

Centralized Greasing System | Technical Basis: Automated lubrication points routed to a single station | Operational Benefit: Ensures critical wear points receive proper lubrication consistently, simplifying daily maintenance checks | ROI Impact: Prevents premature failure due to lubrication neglect; reduces daily service time required by operators.

Gold Ore Crushing Equipment Oem Factory Minimum Order

4. COMPETITIVE ADVANTAGES

| Performance Metric | Industry Standard Benchmark | Our Gold Ore Crushing Solution Documented Advantage |
| : | : | : |
| Liner Wear Life (Abrasive Ore) | Baseline (100%)| Up to 150180% improvement |
| Mean Time Between Failures (MTBF) Mechanical| ~68 months| >12 months |
| Throughput Capacity (tph same CSS) Baseline (100%)| Up to 115120% improvement |
| Downtime per Liner Change| 2436 hours| <16 hours |
| Power Consumption per Tonne Crushed Baseline (100%)| Approx. 9095% |

5. TECHNICAL SPECIFICATIONS

Model Range Capacity: From 150 TPH to over 1,200 TPH (dependent on ore characteristics).
Feed Opening: From 900mm x 600mm up to 1500mm x 1300mm.
Power Requirement: Electric motor drives from 75 kW up to 300 kW; configured for highaltitude or variable voltage operation as required.
Key Material Specifications: Main frame fabricated highstrength steel plate; Jaw plates proprietary ARMn steel; Shaft forged alloy steel; Cheek plates ARMn steel.
Physical Dimensions: Varies by model; designs account for transport constraints and facilitate placement on common plant foundations.
Environmental Operating Range: Designed for ambient temperatures from 20°C to +45°C; dustproofing standard for arid environments; corrosionresistant coatings available for humid/saline atmospheres.

6. APPLICATION SCENARIOS

Hard Rock Gold Mine – West Africa

Challenge: A major operation faced excessive downtime every 810 weeks due to rapid liner wear in their primary jaw crusher processing highly abrasive quartz vein ore. This created a persistent bottleneck.
Solution: Implementation of our specifically configured jaw crusher with workhardening liner alloy and optimized chamber geometry.
Results: Liner life extended to an average of 1416 weeks. Combined with hydraulic adjustment, this change contributed to an estimated 17% increase in annual crusher availability, directly supporting higher mill feed rates.

MidTier Gold Producer – North America

Challenge: The existing crusher produced an inconsistent product size distribution when processing variablegrade ore with clay content, leading to packing issues in secondary crushing stages.
Solution: Replacement with our model featuring aggressive kinematics and hydraulic clearing system capable of handling sticky feed without choking.
Results: Achieved a more consistent product curve with >90% passing target size. Blockagerelated stoppages were reduced by over 80%, smoothing overall plant flow.

7. COMMERCIAL CONSIDERATIONS

Our OEM factory provides transparent commercial terms tailored for capital project planning:

Pricing Tiers: Based on model size/capacity range:
Tier I (600 TPH): Customengineered solutions

Optional Features & Packages:
Motor & Drive Package
Integrated Feed Hopper & Grizzly
360° Maintenance Platform Kit
2Year Extended Wear Parts Warranty

Service Packages Available PostPurchase:

1.Full spare parts kit tailored based on your projected annual tonnage
2.Onsite commissioning supervision & operator training
3.Preventive maintenance inspection schedules

We offer flexible financing options through partner institutions suitable for greenfield projects or fleet expansion programs

FAQ

1.Q What is your minimum order quantity?
A As an OEM factory our MOQ is typically one unit However we encourage clients ordering multiple units or complete modular crushing sections as this allows us optimize production scheduling offer more favorable commercial terms

2.Q Are these machines compatible with my existing secondary cone crushers conveyors?
A Yes Our engineers can review your plant layout specifications ensure interface compatibility regarding discharge height product gradation conveyor loading We provide all necessary technical drawings integration support

3.Q How does this equipment handle wet sticky ore which common during rainy seasons?
A We offer optional design modifications such specialized liner profiles chamber geometry hydraulic clearing systems mitigate packing risk Additionally we can advise on feeder modifications manage moisture content effectively

4.Q What typical lead time delivery?
A For standard models lead time ranges from weeks depending configuration complexity order volume Custom engineered solutions require longer detailed engineering phase We provide firm schedule upon order confirmation include regular progress updates

5.Q Do you provide wear parts ongoing basis what their expected consumption rate?
A Yes As OEM we guarantee supply perfectly matched wear parts spare components Based historical field data similar applications we will provide detailed consumption forecast help you plan inventory budget accurately

6.Q What key factors determine correct model selection my deposit?
A Selection based comprehensive analysis your ROM top size required throughput tonnage desired product P80 size abrasion index Bond Work Index We have questionnaire guide data collection perform selection calculations you

Leave Your Message

Write your message here and send it to us

Leave Your Message