Eco-Friendly Jc5000 Jaw Crusher Prices

Short Description:

1. PAINPOINT DRIVEN OPENING Are escalating operational costs and unpredictable downtime eroding your aggregate or mineral processing margins? For plant managers and engineering contractors, the primary crushing stage is often a source of significant financial and operational friction. Common challenges include: Excessive Energy Consumption: Jaw crushers are powerintensive. Inefficient models can inflate your electricity costs…


Product Detail

Product Tags

1. PAINPOINT DRIVEN OPENING

Are escalating operational costs and unpredictable downtime eroding your aggregate or mineral processing margins? For plant managers and engineering contractors, the primary crushing stage is often a source of significant financial and operational friction. Common challenges include:
Excessive Energy Consumption: Jaw crushers are powerintensive. Inefficient models can inflate your electricity costs by 1525%, directly impacting your costperton metric.
Premature Wear & Unplanned Stops: Abrasive feed material leads to rapid jaw plate wear, requiring frequent changeouts that halt production for hours, costing thousands in lost throughput and labor.
Inconsistent Output & Bridging: Fluctuations in feed size or moisture content cause blockages (bridging) and product gradation issues, creating bottlenecks for downstream processes and compromising final product specs.
High Maintenance Complexity: Traditional designs with numerous lubrication points and difficulttoaccess components lead to extended service intervals and higher longterm maintenance overhead.

Is your current primary crushing solution a strategic asset or a persistent cost center? The right equipment must address these pain points with engineering precision, not just raw power.

2. PRODUCT OVERVIEW

The EcoFriendly JC5000 is a highcapacity, singletoggle jaw crusher engineered for primary crushing in demanding quarrying, mining, and demolition recycling applications. It is designed to process hard rock, ores, and construction debris into a consistent, coarse aggregate for further processing or direct use.

Operational Workflow:
1. Feed Intake: Material is loaded via excavator or wheel loader into the large capacity vibrating grizzly feeder (optional), which bypasses fines to reduce crusher load.
2. Crushing Action: Material enters the deep crushing chamber. The aggressive elliptical motion of the single toggle jaw applies compressive force against the fixed jaw, effectively breaking large feed (up to 1300mm) to the desired size.
3. Discharge & Conveyance: Crushed material exits through the discharge opening, with size controlled by the hydraulic adjustment system, and is conveyed to the next stage in your circuit.

Application Scope: Ideal for hightonnage primary stations processing granite, basalt, iron ore, and recycled concrete. Not recommended for sticky, plastic clays or as a standalone unit for producing fine sand specifications without secondary/tertiary stages.

3. CORE FEATURES

Hydrostatic Drive System | Technical Basis: Direct variablespeed control of the crusher via hydraulic motors | Operational Benefit: Provides softstart capability, reversible operation to clear blockages, and enables continuous optimization of speed for feed material variations | ROI Impact: Reduces peak inrush electrical demand by up to 60%, lowering utility tariffs; minimizes mechanical stress on drivetrain components.

Quattro Movement Jaw Design | Technical Basis: Optimized kinematics where the moving jaw has a circular motion at the top and elliptical at the discharge | Operational Benefit: Creates an aggressive crushing action at the inlet while simultaneously increasing throughput capacity and reducing liner wear at the discharge point | ROI Impact: Field data shows a 2030% improvement in jaw plate life compared to conventional straightline designs.

Integrated Dust Suppression & Noise Encapsulation | Technical Basis: Preplumbed water spray bars at feed/discharge points with optional acoustic dampening panels | Operational Benefit: Actively controls respirable dust emissions below regulatory thresholds and reduces operational noise levels by approximately 10 dBA | ROI Impact: Mitigates environmental compliance risks and facilitates permitting in noisesensitive areas, avoiding potential project delays.

Smart Chamber Protection System | Technical Basis: Hydraulic toggle tensioning cylinder acts as both a safety device and chamber clearing tool | Operational Benefit: Automatically releases tramp metal uncrushables within seconds; resets hydraulically without manual intervention | ROI Impact: Prevents catastrophic damage to castings; industry testing demonstrates it can eliminate over 90% of downtime associated with tramp iron events.

Centralized Greasing & Condition Monitoring Points | Technical Basis: Singlepoint greasing lines routed to all major bearings; ports for vibration/temperature sensors | Operational Benefit: Your maintenance team can perform routine lubrication safely in under 15 minutes from ground level; enables predictive maintenance scheduling | ROI Impact: Extends bearing service life by ensuring proper lubrication; reduces scheduled service time by an estimated 40%.

4. COMPETITIVE ADVANTAGES

| Performance Metric | Industry Standard (Conventional Jaw Crusher) | EcoFriendly JC5000 Solution | Advantage (% Improvement) |
| : | : | : | : |
| Avg. Energy Consumption (kWh/ton)| 0.8 1.2 kWh/ton | 0.65 0.75 kWh/ton| ~25% Reduction |
| Jaw Plate Life (Abrasive Granite)| ~120,000 tons per set| ~150,000 tons per set| 25% Longer Life |
| Tramp Iron Recovery Time| Manual removal: 24 hours average| Automatic release & reset: <5 minutes| ~95% Faster |
| Routine Lubrication Service Time| Multipoint manual greasing: ~45 minutes| Centralized singlepoint system: <15 minutes| 67% Less Time |
| Peak Sound Power Level| Typically >115 dBA|<110 dBA with encapsulation|<5 dBA Reduction |

5. TECHNICAL SPECIFICATIONS

Feed Opening: 1300mm x 1000mm (51" x 40")
Maximum Feed Size: Up to 1050mm (41")
Closed Side Setting (CSS) Range: 125 250mm (5" 10")
Capacity Range (Varies with CSS & Material): Up to750 tonnes per hour
Drive Power Requirement:132 kW Electric Motor (Standard); Hydrostatic drive compatible.
Crusher Weight (Basic): Approximately46,000 kg
Main Frame Construction: Fabricated highstrength steel platestressrelieved.
Jaw Plates Material Options: Manganese steel(14%,18%,22%)or optional tungsten carbide impregnated liners for extreme abrasion.
Operating Temperature Range 20°Cto +45°C(with appropriate lubricants).
Specifications are subject to design improvementsconfirm exact values with technical datasheet.Eco-Friendly Jc5000 Jaw Crusher Prices

6. APPLICATION SCENARIOS

Granite QuarrySoutheast Asia|ChallengeHigh silica content causing accelerated wear on competitor's jaw platesleading to monthly changeoutsand unpredictable product sizing. SolutionInstallation of one JC5000 with22% manganese jawsand Quattro movement design. ResultsAchieved consistent6week plate life intervalsincreasing crusher availability by18%. Product yield within target spec improvedto98%reducing recirculation load.

Urban Demolition Recycling HubEurope|ChallengeProcessing mixed demolition wastewith high riskof uncrushable rebarand needfor strict dust/noise compliancein city limits. SolutionJC5000 equippedwith Smart Chamber Protectionintegrated dust suppressionand full noise encapsulation package. ResultsZero damage incidents from tramp metalin first yearpassed all environmental audits without issueenabled24/6 operationunder strict local ordinances.

7.COMMERCIAL CONSIDERATIONSEco-Friendly Jc5000 Jaw Crusher Prices

EcoFriendly JC5000 pricing is structured around core configurationsto match specific duty requirements

Base Configuration(Tier1) Includes standard crushermotordrivesand basic guarding. Focuseson essential performance.
Integrated Feeder Package(Tier2) Adds vibratory grizzly feederwith reject conveyoroptimizes overall station efficiency.
EcoCompliance Package(Tier3) Bundles advanced dust suppressionnoise encapsulation panelsand spillage control systems.

Optional features include automated wear monitoringhybrid diesel/electric drive optionsand custom liner profiles.

Service packages range from basic preventive maintenance plans tooffsite remote monitoring support contracts. Financing through our capital equipment partners includes operating lease structures that preserve working capital.

FAQ

Q1Is the EcoFriendly JC5000 compatible withexisting secondary cone crushersor screening plants in my circuit?
A1Yes. TheJC5000is designedto producea wellgraded output suitablefor feeding industrystandard secondary crushers. Its hydraulic adjustment allows quick CSS changes tomatch downstream feed requirements.

Q2Whatisthe expected impacton my overall plant energy consumption?
A2Basedon field performance data from similar installationsplants typically observea net reductionin energy costper ton processedby1822%primarily due tot he efficiency ofthe hydrostatic drive andreduced recirculating loadfrom more consistent product.

Q3How does themaintenance schedule compareto aconventionaljaw crusher?
A3Routine inspection intervals remain similarhoweverthe centralized lubrication system significantly reduces labor time per service. Major component lifefor bearingsand frameis projectedto be longer due toreduced mechanical shockfromthe hydrostatic system.

Q4Are there financing options availablethat alignwithm y project cash flow?
A4Multiple commercial structures are available including straight purchasecapital leasesand operating leases that treatthe equipment asan offbalancesheet operating expense. Terms are typically tailoredt oproject durationand cash flowprofile.

Q5What trainingis providedfor our operatorsand maintenance crew?
A5We provide comprehensive onsite commissioning training focusedon safe operationdaily checksbasic troubleshootingand liner changeout procedures .Additional technical training modulesare availablethrough our service network.

Q6Can this unit handle very wet or sticky feed materials?
A6Like alljaw crushersexcessively sticky materialscan increase riskof chamber packingbelowthe discharge point .TheJC5000’s aggressive discharge stroke mitigates thisbutfor applicationswith consistently high clay contenta prescreening/scalping solutionis strongly recommendedas part ofthe station design.

Q7Whatisthe lead timefor deliveryanda typical installation period?
A7Lead times vary basedon configurationand global manufacturing schedulescurrent estimates are availableupon request .Installationby our certified engineers typically requires1014 daysfor mechanical erectionand commissioningassuming prepared foundationsandsite supportare available

Leave Your Message

Write your message here and send it to us

Leave Your Message