1. PAINPOINT DRIVEN OPENING
Are escalating operational costs and unpredictable downtime eroding your aggregate or mineral processing margins? For plant managers and engineering contractors, the primary crushing stage is often a source of significant financial and operational friction. Common challenges include:
Excessive Energy Consumption: Jaw crushers are powerintensive. Inefficient models can inflate your electricity costs by 1525%, directly impacting your costperton metric.
Premature Wear & Unplanned Stops: Abrasive feed material leads to rapid jaw plate wear, requiring frequent changeouts that halt production for hours, costing thousands in lost throughput and labor.
Inconsistent Output & Bridging: Fluctuations in feed size or moisture content cause blockages (bridging) and product gradation issues, creating bottlenecks for downstream processes and compromising final product specs.
High Maintenance Complexity: Traditional designs with numerous lubrication points and difficulttoaccess components lead to extended service intervals and higher longterm maintenance overhead.
Is your current primary crushing solution a strategic asset or a persistent cost center? The right equipment must address these pain points with engineering precision, not just raw power.
2. PRODUCT OVERVIEW
The EcoFriendly JC5000 is a highcapacity, singletoggle jaw crusher engineered for primary crushing in demanding quarrying, mining, and demolition recycling applications. It is designed to process hard rock, ores, and construction debris into a consistent, coarse aggregate for further processing or direct use.
Operational Workflow:
1. Feed Intake: Material is loaded via excavator or wheel loader into the large capacity vibrating grizzly feeder (optional), which bypasses fines to reduce crusher load.
2. Crushing Action: Material enters the deep crushing chamber. The aggressive elliptical motion of the single toggle jaw applies compressive force against the fixed jaw, effectively breaking large feed (up to 1300mm) to the desired size.
3. Discharge & Conveyance: Crushed material exits through the discharge opening, with size controlled by the hydraulic adjustment system, and is conveyed to the next stage in your circuit.
Application Scope: Ideal for hightonnage primary stations processing granite, basalt, iron ore, and recycled concrete. Not recommended for sticky, plastic clays or as a standalone unit for producing fine sand specifications without secondary/tertiary stages.
3. CORE FEATURES
Hydrostatic Drive System | Technical Basis: Direct variablespeed control of the crusher via hydraulic motors | Operational Benefit: Provides softstart capability, reversible operation to clear blockages, and enables continuous optimization of speed for feed material variations | ROI Impact: Reduces peak inrush electrical demand by up to 60%, lowering utility tariffs; minimizes mechanical stress on drivetrain components.
Quattro Movement Jaw Design | Technical Basis: Optimized kinematics where the moving jaw has a circular motion at the top and elliptical at the discharge | Operational Benefit: Creates an aggressive crushing action at the inlet while simultaneously increasing throughput capacity and reducing liner wear at the discharge point | ROI Impact: Field data shows a 2030% improvement in jaw plate life compared to conventional straightline designs.
Integrated Dust Suppression & Noise Encapsulation | Technical Basis: Preplumbed water spray bars at feed/discharge points with optional acoustic dampening panels | Operational Benefit: Actively controls respirable dust emissions below regulatory thresholds and reduces operational noise levels by approximately 10 dBA | ROI Impact: Mitigates environmental compliance risks and facilitates permitting in noisesensitive areas, avoiding potential project delays.
Smart Chamber Protection System | Technical Basis: Hydraulic toggle tensioning cylinder acts as both a safety device and chamber clearing tool | Operational Benefit: Automatically releases tramp metal uncrushables within seconds; resets hydraulically without manual intervention | ROI Impact: Prevents catastrophic damage to castings; industry testing demonstrates it can eliminate over 90% of downtime associated with tramp iron events.
Centralized Greasing & Condition Monitoring Points | Technical Basis: Singlepoint greasing lines routed to all major bearings; ports for vibration/temperature sensors | Operational Benefit: Your maintenance team can perform routine lubrication safely in under 15 minutes from ground level; enables predictive maintenance scheduling | ROI Impact: Extends bearing service life by ensuring proper lubrication; reduces scheduled service time by an estimated 40%.
4. COMPETITIVE ADVANTAGES
| Performance Metric | Industry Standard (Conventional Jaw Crusher) | EcoFriendly JC5000 Solution | Advantage (% Improvement) |
| : | : | : | : |
| Avg. Energy Consumption (kWh/ton)| 0.8 1.2 kWh/ton | 0.65 0.75 kWh/ton| ~25% Reduction |
| Jaw Plate Life (Abrasive Granite)| ~120,000 tons per set| ~150,000 tons per set| 25% Longer Life |
| Tramp Iron Recovery Time| Manual removal: 24 hours average| Automatic release & reset: <5 minutes| ~95% Faster |
| Routine Lubrication Service Time| Multipoint manual greasing: ~45 minutes| Centralized singlepoint system: <15 minutes| 67% Less Time |
| Peak Sound Power Level| Typically >115 dBA|<110 dBA with encapsulation|<5 dBA Reduction |
5. TECHNICAL SPECIFICATIONS
Feed Opening: 1300mm x 1000mm (51" x 40")
Maximum Feed Size: Up to 1050mm (41")
Closed Side Setting (CSS) Range: 125 250mm (5" 10")
Capacity Range (Varies with CSS & Material): Up to750 tonnes per hour
Drive Power Requirement:132 kW Electric Motor (Standard); Hydrostatic drive compatible.
Crusher Weight (Basic): Approximately46,000 kg
Main Frame Construction: Fabricated highstrength steel plate,stressrelieved.
Jaw Plates Material Options: Manganese steel(14%,18%,22%)or optional tungsten carbide impregnated liners for extreme abrasion.
Operating Temperature Range: 20°Cto +45°C(with appropriate lubricants).
Specifications are subject to design improvements; confirm exact values with technical datasheet.
6. APPLICATION SCENARIOS
Granite Quarry, Southeast Asia|Challenge: High silica content causing accelerated wear on competitor's jaw plates, leading to monthly changeoutsand unpredictable product sizing. Solution: Installation of one JC5000 with22% manganese jawsand Quattro movement design. Results: Achieved consistent6week plate life intervals, increasing crusher availability by18%. Product yield within target spec improvedto98%, reducing recirculation load.
Urban Demolition Recycling Hub, Europe|Challenge: Processing mixed demolition wastewith high riskof uncrushable rebarand needfor strict dust/noise compliancein city limits. Solution: JC5000 equippedwith Smart Chamber Protection, integrated dust suppression,and full noise encapsulation package. Results: Zero damage incidents from tramp metalin first year; passed all environmental audits without issue; enabled24/6 operationunder strict local ordinances.
7.COMMERCIAL CONSIDERATIONS
EcoFriendly JC5000 pricing is structured around core configurationsto match specific duty requirements:
Base Configuration(Tier1): Includes standard crusher, motor, drives,and basic guarding. Focuseson essential performance.
Integrated Feeder Package(Tier2): Adds vibratory grizzly feederwith reject conveyor; optimizes overall station efficiency.
EcoCompliance Package(Tier3): Bundles advanced dust suppression, noise encapsulation panels,and spillage control systems.
Optional features include automated wear monitoring, hybrid diesel/electric drive options,and custom liner profiles.
Service packages range from basic preventive maintenance plans tooffsite remote monitoring support contracts. Financing through our capital equipment partners includes operating lease structures that preserve working capital.
FAQ
Q1: Is the EcoFriendly JC5000 compatible withexisting secondary cone crushersor screening plants in my circuit?
A1: Yes. TheJC5000is designedto producea wellgraded output suitablefor feeding industrystandard secondary crushers. Its hydraulic adjustment allows quick CSS changes tomatch downstream feed requirements.
Q2: Whatisthe expected impacton my overall plant energy consumption?
A2: Basedon field performance data from similar installations, plants typically observea net reductionin energy costper ton processedby1822%, primarily due tot he efficiency ofthe hydrostatic drive andreduced recirculating loadfrom more consistent product.
Q3: How does themaintenance schedule compareto aconventionaljaw crusher?
A3: Routine inspection intervals remain similar; howeverthe centralized lubrication system significantly reduces labor time per service. Major component lifefor bearingsand frameis projectedto be longer due toreduced mechanical shockfromthe hydrostatic system.
Q4: Are there financing options availablethat alignwithm y project cash flow?
A4: Multiple commercial structures are available including straight purchase ,capital leases ,and operating leases that treatthe equipment asan offbalancesheet operating expense. Terms are typically tailoredt oproject durationand cash flowprofile.
Q5: What trainingis providedfor our operatorsand maintenance crew?
A5: We provide comprehensive onsite commissioning training focusedon safe operation ,daily checks ,basic troubleshooting ,and liner changeout procedures .Additional technical training modulesare availablethrough our service network.
Q6 :Can this unit handle very wet or sticky feed materials?
A6 :Like alljaw crushers ,excessively sticky materialscan increase riskof chamber packingbelowthe discharge point .TheJC5000’s aggressive discharge stroke mitigates this ,butfor applicationswith consistently high clay content ,a prescreening/scalping solutionis strongly recommendedas part ofthe station design.
Q7 :Whatisthe lead timefor deliveryanda typical installation period?
A7 :Lead times vary basedon configurationand global manufacturing schedules ;current estimates are availableupon request .Installationby our certified engineers typically requires1014 daysfor mechanical erectionand commissioning ,assuming prepared foundationsandsite supportare available