Chinese Gold Ore Crushing Equipment Manufacturing
1. PAINPOINT DRIVEN OPENING
Are your gold processing operations constrained by inefficient primary crushing? The initial size reduction stage sets the tone for your entire recovery circuit. Common challenges with inadequate Chinese gold ore crushing equipment include:
High Operational Cost: Frequent liner changes and unplanned downtime for maintenance directly increase your cost per ton. A single major component failure can halt production for days.
Inconsistent Feed Size: Poorly calibrated or underpowered crushers produce erratic product sizes, overloading downstream grinding mills and reducing overall recovery efficiency by 515%.
Excessive Energy Consumption: Crushers operating outside their optimal design parameters consume significantly more power, a major fixed cost in mineral processing.
AbrasionRelated Downtime: Gold ores, particularly hard rock deposits with quartz, are highly abrasive. Equipment not manufactured with the correct metallurgy suffers rapid wear, compromising throughput.
Is your primary crusher a bottleneck or a reliable foundation? The right heavyduty jaw crusher is not an expense; it is an investment in plant stability and predictable output.
2. PRODUCT OVERVIEW
Our solution is a series of heavyduty, modular jaw crushers engineered specifically for the primary crushing of hard rock gold ores. This Chinese gold ore crushing equipment is designed for stationary and semimobile plant configurations.
Operational Workflow:
1. RunofMine (ROM) ore is fed via dump truck or grizzly into the crusher’s vibrating feeder.
2. Ore is gripped between a fixed and a mechanically actuated moving jaw plate, where compressive force breaks large rocks.
3. Crushed material discharges through an adjustable gap (closed side setting), determining the final product size for the next stage of processing.
Application Scope: Ideal for primary crushing of goldbearing quartz veins, sulphide ores, and alluvial deposit feed preparation. Capacities range from 50 to over 1,500 tonnes per hour.
Limitations: This equipment is designed for dry or naturally wet ore; it is not suitable for slurry feeding. For ores with high clay content, prescreening/scalping is recommended to prevent chamber packing.
3. CORE FEATURES
Deep Crushing Chamber & Optimized Kinematics | Technical Basis: Increased nip angle and longer crushing stroke | Operational Benefit: Higher reduction ratio per pass, allowing for greater size reduction in a single stage | ROI Impact: Reduces the need for secondary crushing in some flowsheets, lowering capital outlay and plant footprint.
HeavyDuty Frame Construction | Technical Basis: Fabricated from highstrength steel plate with reinforced stress points | Operational Benefit: Exceptional durability under continuous highload operation, resisting frame fatigue and deformation | ROI Impact: Extends structural life beyond 20 years under normal operation, protecting your longterm asset value.
Advanced Wear Part Metallurgy | Technical Basis: Jaw plates cast from modified manganese steel (Mn18Cr2) with controlled heat treatment | Operational Benefit: Workhardens upon impact, forming a durable wearresistant surface that extends service life in abrasive gold ore | ROI Impact: Field data shows a 3040% improvement in liner life over standard manganese steel, reducing part change frequency and inventory costs.
Centralized Automated Greasing System | Technical Basis: Programmable lubrication unit servicing all key bearing points | Operational Benefit: Ensures consistent bearing protection without manual intervention, preventing failures due to under or overgreasing | ROI Impact: Minimizes bearingrelated downtime; industry testing demonstrates a >90% reduction in premature bearing failures.

QuickAdjust Shim Setting System | Technical Basis: Mechanical shim adjustment for the closed side setting (CSS) rather than outdated wedge systems | Operational Benefit: Operators can adjust product size accurately and safely in minutes without stopping the crusher feed | ROI Impact: Increases plant uptime by facilitating rapid adjustments to meet changing ore characteristics or downstream requirements.
Integrated Motor Base & VBelt Drive | Technical Basis: Crusher motor mounted on a common base with automatic belt tensioning | Operational Benefit: Simplifies installation, ensures proper drive alignment, and reduces maintenance time during belt changes | ROI Impact: Lowers installation costs by up to 15% and reduces routine drive maintenance labor.
4. COMPETITIVE ADVANTAGES
| Performance Metric | Industry Standard Benchmark | Our Gold Ore Jaw Crusher Solution | Documented Advantage |
| : | : | : | : |
| Availability (Uptime) | 9294% | >96% (excluding planned maintenance) | +24% throughput increase |
| Liner Life (Abrasive Ore) | ~120,000 tonnes per set (Mn14) | ~165,000 tonnes per set (Mn18Cr2)| +37% longer operational cycles |
| Energy Efficiency (kWh/tonne) Varies by rock type| Baseline = 100%| Measured at ~9295% of baseline| 58% direct power savings |
| CSS Adjustment Time| 6090 minutes (manual wedge)| <20 minutes (shim system)| ~75% faster adjustment |
5. TECHNICAL SPECIFICATIONS
Model Range Capacity: 50 1,500 TPH (dependent on feed size and material density)
Feed Opening Sizes: From 750mm x 500mm up to 1500mm x 1200mm
Power Requirements: Electric motor drive from 75 kW to 315 kW; voltage adaptable to mine site specifications (380V/415V/660V/6kV/10kV).
Material Specifications: Main frame: Q345B steel; Jaw plates: Mn18Cr2 alloy; Eccentric shaft: Forged 42CrMo steel.
Physical Dimensions: Modular design; largest model footprint approximately L8m x W3.5m x H4m.
Environmental Operating Range: Designed for ambient temperatures from 20°C to +45°C. Dust sealing kits are standard for operation in environments with particulate matter regulations.
6. APPLICATION SCENARIOS
Hard Rock Underground Mine Portal Application
Challenge A midtier underground gold mine needed to reduce ROM ore (600mm) to 150mm at the portal before conveyor transport to the mill. Space was limited and reliability was critical due to constrained access for major repairs.
Solution Installation of a single heavyduty jaw crusher with a compact feeder module directly at the ore pass discharge.
Results The setup achieved consistent 125mm product at 180 TPH. Availability exceeded 96% over the first year, eliminating truck haulage from the portal and reducing transport costs by an estimated $12/tonne.
Alluvial/Eluvial Deposit Processing Plant
Challenge A West African operation processing weathered oxide ore faced issues with variable clay content causing occasional chamber packing in their old crusher, leading to frequent stoppages.
Solution Implementation of our jaw crusher paired with a robust grizzly feeder to scalp fines ahead of crushing. The deep chamber design provided better handling of sticky feed.
Results Throughput stabilized at design capacity of 220 TPH. Chamber packing incidents were eliminated, reducing daily operational delays by an average of 45 minutes and increasing monthly processed tonnage by over 15%.
7. COMMERCIAL CONSIDERATIONS
Our Chinese gold ore crushing equipment is offered in transparent pricing tiers based on size and capability:
Standard Duty Series: For lowercapacity plants (<200 TPH). Includes core features with standard motor options.
Heavy Duty Series: For mainstream operations (200800 TPH). Includes all listed features as standard.
Ultra Duty Series: For largescale mines (>800 TPH). Features enhanced components like dualacting hydraulic adjustment cylinders as optional upgrades.
Optional features include automated wear monitoring systems, special alloy upgrades for extreme abrasion zones (keyword: Chinese gold ore crushing equipment), dust suppression spray systems integrated into the inlet chute (keyword: Chinese gold ore crushing equipment), and skidmounted or semimobile configurations (keyword: Chinese gold ore crushing equipment).
We offer tiered service packages from basic commissioning support up to comprehensive annual inspection & parts supply agreements (keyword: Chinese gold ore crushing equipment). Financing options through partner institutions can structure payments aligned with project cash flow timelines (keyword: Chinese gold ore crushing equipment).
8. FAQ
Q1 What are my options if my existing plant uses different brand secondary crushers?
A1 Our jaw crushers are engineered to produce consistent product gradation curves that are compatible with any downstream cone crusher or grinding mill circuit (keyword: Chinese gold ore crushing equipment). We provide detailed product size distribution charts based on your target closedside setting (keyword: Chinese gold ore crushing equipment).
Q2 How significant is the installation downtime during replacement?
A2 The modular design simplifies foundation requirements compared to older monolithic units (keyword: Chinese gold ore crushing equipment). With proper planning using our predelivery layout kits (keyword: Chinese gold ore crushing equipment), typical changeover can be completed within a scheduled oneweek shutdown period (keyword: Chinese gold ore crushing equipment).
Q3 What does "optimized kinematics" mean in practical terms?
A3 It refers to the mathematical design of the jaw's motion path (keyword: Chinese gold ore crushing equipment). Our design prioritizes material flow down through the chamber without excessive vertical movement (keyword: Chinese gold ore crushing equipment), which reduces recirculation within the chamber by approximately 18%, directly increasing throughput capacity per unit of installed power (keyword: Chinese gold ore crushed).
Q4 Are wear parts readily available?
A4 Yes We maintain strategic global inventory hubs Our Mn18Cr2 jaw plates are stocked as finished items not raw castings ensuring fast shipment times typically within 7 10 working days after order confirmation
Q5 Can this handle runofmine feed directly from an excavator?
A5 While robust we strongly recommend using a grizzly feeder or apron feeder ahead of any primary jaw crusher This ensures even distribution removes subfines that consume chamber space protects against direct impact damage from large rocks extending component life significantly
Q6 Is there data supporting energy efficiency claims?
A6 Yes Thirdparty performance audits conducted at three separate mine sites show measured power draw averaging 7 lower than comparable sized units when processing similar UCS rated quartzgold ores Detailed reports are available under NDA
Q7 What commercial terms support project budgeting?
A7 We provide firm fixedprice quotations valid for 90 days Standard payment terms involve progress payments tied to key milestones like shop inspection shipping documents arrival at port Delivery Incoterms EXW FOB CIF can be arranged based on buyer preference