Ce Marked Sand Gravel Mining Makers
1. PAINPOINT DRIVEN OPENING
Are escalating operational costs and unpredictable downtime eroding your aggregate production margins? For plant managers overseeing sand and gravel extraction, key challenges persist: inconsistent feed material degrading final product specification, excessive wear on components from abrasive particulates leading to unplanned maintenance stops, and inefficient water or dust management creating environmental compliance risks. Each hour of unscheduled downtime can cost thousands in lost production and contract penalties. How do you increase throughput while controlling the total cost of ownership? Is your current processing line flexible enough to handle variable deposit geology without sacrificing yield? The solution requires equipment engineered not just for capacity, but for durability, precision, and operational stability in the most demanding pit and quarry conditions.
2. PRODUCT OVERVIEW
This product line comprises CE Marked stationary and mobile sand gravel mining makers—comprehensive processing plants designed for the primary crushing, screening, washing, and stockpiling of aggregate materials. The operational workflow is engineered for continuous, highvolume output: (1) Feed material is uniformly introduced via vibrating grizzly feeders to a robust primary crusher. (2) Crushed aggregate is then conveyed to a multideck screening unit for precise classification into specified grades. (3) Where required, sand fractions are routed through integrated cyclones or screw classifiers for washing and dewatering to meet strict cleanliness standards. (4) Sized and washed product is conveyed to designated stockpiles. (5) Integrated control systems monitor the entire process. These systems are suited for greenfield sites, existing plant upgrades, or temporary contract mining projects. Limitations include a requirement for competent site planning for stationary plants and defined feed size parameters as per model specification.
3. CORE FEATURES
Modular Plant Design | Technical Basis: Preengineered, bolttogether substructures with standardized interfaces | Operational Benefit: Rapid onsite assembly and future reconfiguration or expansion with minimal fabrication work | ROI Impact: Reduces installation time by up to 30%, lowering project capital deployment and accelerating timetorevenue.
AbrasionResistant Liner Package | Technical Basis: Highchrome white iron or AR steel liners in critical wear zones based on impact/abrasion analysis | Operational Benefit: Extends service life of hoppers, chutes, and crusher cavities in highsilica content applications | ROI Impact: Documented reduction in liner replacement costs by 1525% annually versus standard materials.
Tier 4 Final / Stage V Compliant Power Unit | Technical Basis: Advanced diesel engines or electric motor drives with integrated emission control systems | Operational Benefit: Ensures full compliance for operation within the EU and other regulated regions without performance loss | ROI Impact: Eliminates risk of project delays or fines due to noncompliant equipment.
Intelligent Process Control System | Technical Basis: Centralized PLC with touchscreen HMI providing realtime monitoring of tonnage, power draw, and screen loads | Operational Benefit: Allows operators to optimize feed rates and identify bottlenecks instantly, maintaining peak efficiency | ROI Impact: Field data shows a 510% improvement in overall throughput efficiency through consistent load management.
Integrated Water Management Circuit | Technical Basis: Closedloop water recycling system with settling ponds or thickener integration | Operational Benefit: Dramatically reduces freshwater consumption and minimizes slurry runoff for simplified site water permitting | ROI Impact: Can cut water procurement and treatment costs by over 60%, a critical factor in waterscarce regions.
4. COMPETITIVE ADVANTAGES
| Performance Metric | Industry Standard | CE Marked Sand Gravel Mining Maker Solution | Advantage (% Improvement) |
| : | : | : | : |
| Mean Time Between Failure (Critical Wear Parts) | ~8001,200 Hours | 1,500+ Hours (with abrasion package) | +25% to +40% |
| OnSite Commissioning Time (MidSize Plant) | 46 Weeks | 34 Weeks (modular design) | 25% to 33% |
| Fuel Consumption per Tonne Processed (Mobile Plant)| Baseline 100%| Optimized hydraulics & engine management reduces consumption to ~92%| 8% |
| Fines Recovery & Yield (Sand Washing Applications)| ~8590% Recovery| Highefficiency cyclones achieve 9295% Recovery| +5% to +7% Yield Increase |
5. TECHNICAL SPECIFICATIONS
Capacity Range: Models available from 150 tonnes per hour (TPH) to over 600 TPH peak output.
Power Requirements: Configurable with electric drive (400V/50Hz or customerspecified) or dieselhydraulic power packs with Tier 4 Final / Stage V engines.
Material Specifications: Primary structural components fabricated from S355 grade steel; critical wear components available in Hardox®, AR400/500, or highchrome cast iron.
Physical Dimensions: Mobile plants designed for transport width compliance (<3m). Stationary plant footprints are customized but designed for compact layout.
Environmental Operating Range: Designed for ambient temperatures from 20°C to +45°C. Dust suppression systems maintain particulate emissions below local regulatory thresholds.
6. APPLICATION SCENARIOS
Aggregate Producer – Glacial Deposit Site |
Challenge: Highly variable feed material containing clay lenses causing frequent screen blinding and outofspec sand products.
Solution: Implementation of a CE marked sand gravel mining maker featuring an aggressive log washer module integrated before the screening deck.
Results: Clay contamination was reduced from >8% to under 2%, eliminating daily screen cleaning downtime. Product met EN 12620 standards consistently, allowing a premium price point.
Civil Engineering Contractor – Temporary Riverbed Extraction |
Challenge: Need for a highyield processing setup on a remote 18month infrastructure project with strict environmental discharge limits.
Solution: Deployment of a mobile tracked sand gravel mining maker with a fully closedcircuit water recycling system.
Results: The plant was operational within 48 hours of arrival on site. Zero wastewater discharge simplified permitting; the project achieved all aggregate production targets onsite, eliminating costly imported material.
7. COMMERCIAL CONSIDERATIONS
Equipment is offered in three primary tiers:
1. Standard Configuration: Base model plant covering core crushing and screening functions.
2. Wash Plant Configuration: Includes sizing screens, sand screw(s), cyclones, and slurry pumps.
3. Custom HighCapacity Configuration: Engineered solutions with larger crushers, additional screening decks,and advanced automation.
Optional features include magnet separators,telescopic stockpiling conveyors,dust encapsulation kits,and remote telemetry packages.Service packages range from basic commissioning support to comprehensive annual maintenance contracts with guaranteed parts availability.Financing options include operating leases,tailored rentalpurchase agreements,and projectbased financing through accredited partners.
8. FAQ
Q1: What does the CE Mark specifically guarantee about this equipment?
A1: The CE Mark confirms the machinery meets all applicable EU health,safety,and environmental protection directives.It verifies compliance with the Machinery Directive(2006/42/EC),Electromagnetic Compatibility Directive(2014/30/EU),and often the Pressure Equipment Directive(2014/68/EU),ensuring it can be legally placed on the market within the European Economic Area.
Q2: How does this plant handle particularly hard or abrasive rock types like granite or quartzite?
A2: For such applications,a specific "Hard Rock" configuration is recommended.This includes jaw crushers with optimized kinematics,a heavierduty cone crusher liner profile,increased wear liner thickness at transfer points,and upgraded screen mesh fastening systems.All specifications are reviewed during project engineering.
Q3: What is the typical lead time from order to delivery?
A3: For standard configured models,the lead time is typically between 1216 weeks.Customengineered solutions require detailed specification review,but our modular approach often allows delivery within1822 weeks.Delivery schedules are confirmed upon order finalization.
Q4: Can we integrate this new plant with our existing legacy conveyors and screens?
A4: Yes.The control system can be specified as a master unit designed to interface with peripheral equipment.Plant layout engineering will account for integration points regarding height,infeed,and discharge compatibility during the design phase.
Q5:What training is provided for our operations team?
A5:A comprehensive training program is included.It covers safe startup/shutdown procedures,daily maintenance checks,basic troubleshooting via the HMI,and liner changeout protocols.Training occurs both at commissioning on your siteand through provided digital manuals.
Q6:What are the key factors that determine whether we need an electric or dieselpowered unit?
A6:The decision primarily hinges on site infrastructure,mobility requirements,and longterm operating cost.Electric drives offer significantly lower perhour operating costs where grid power is available.Dieselhydraulic units provide complete mobility but have higher fuel costs;they are essentialfor sites without established power supply.
Q7:What warranty coverage is provided?
A7:The standard warranty covers defects in materialsand workmanship fora period of12 monthsfrom commissioningor18 monthsfrom shipment.The warranty includes parts but not labor.For critical components like crusher main frames,a separate structural warranty applies.Extended warranty packages are available


