500 Tph Gold Mining Washing Plant Contract Manufacturer Moq
1. PAINPOINT DRIVEN OPENING
Scaling gold recovery operations to 500 Tph presents distinct challenges that directly impact profitability. Plant managers and engineering contractors often face:
High Operational Downtime: Frequent clogging in scrubbers and screens from sticky clay or oversize material halts entire processing lines, costing thousands per hour in lost production.
Inconsistent Recovery Rates: Variable feed material can overwhelm static washing systems, leading to goldbearing fines bypassing recovery circuits and reporting to tailings.
Excessive Water & Power Consumption: Inefficient pump systems and material handling in highcapacity plants create unsustainable utility costs, eroding project margins.
Rapid Component Wear: Abrasive feed at this volume degrades standard liners, screens, and piping, resulting in high maintenance costs and unpredictable replacement schedules.
Complex Commissioning & Integration: Sourcing a plant from multiple vendors leads to coordination failures, design gaps, and prolonged timetooperation.
Are you managing these risks? The solution lies in a singlecontract, engineered system designed for reliability at scale.
2. PRODUCT OVERVIEW
This product is a complete, skidmounted or modular 500 Tph Gold Mining Washing Plant. It is engineered as a turnkey solution for alluvial and eluvial deposits, designed to process raw feed material into concentrated ore ready for final gold recovery (e.g., via gravity concentrators or direct cyanidation).
Operational Workflow:
1. Primary Feed & Scrubbing: Runofmine (ROM) material is fed into a robust trommel or scrubber for disaggregation and initial washing.
2. Sizing & Waste Removal: Oversize rocks (+75mm) are ejected via conveyors. Midsize gravels are typically routed to secondary crushing or waste stockpiles.
3. Critical Clay & Fines Processing: The sub75mm fraction passes through vibrating screens with highpressure spray bars to break down clay matrices.
4. Primary Concentration: The liberated sand and gold fraction reports to primary concentration units (e.g., jigs, spirals) for initial upgrade.
5. Tailings Management & Water Handling: Waste streams are managed via slurry pumps; process water is recirculated through a compact clarification system.
Application Scope & Limitations:
Scope: Ideal for alluvial/placer deposits, weathered eluvial materials, and old tailings reprocessing with moderate clay content.
Limitations: Not suitable for hard rock (lode) ore without prior crushing. Feed material size distribution must be evaluated; excessive boulders (>500mm) may require a prescalping circuit.
3. CORE FEATURES
HeavyDuty Scrubber Module | Technical Basis: Hightorque hydraulic drive system with reinforced lifters | Operational Benefit: Processes highclay feed without bogging down; maintains consistent throughput even with variable material | ROI Impact: Reduces downtime due to clogging by an estimated 70%, safeguarding fullshift production targets.
Modular Interlocking Design | Technical Basis: Bolttogether skids with prealigned flanges and integrated walkways | Operational Benefit: Reduces onsite installation time by up to 60% versus componentbased builds | ROI Impact: Lowers contractor erection costs and accelerates revenue generation by weeks.
Advanced Water Management Circuit | Technical Basis: Highcapacity hydrocyclones paired with a compact thickener for closedloop water recycling | Operational Benefit: Cuts fresh water makeup requirements by over 80% and minimizes settling pond footprint | ROI Impact: Drastically reduces water licensing costs and environmental management expenses.
Linatex®Lined Abrasion Zones | Technical Basis: Critical wear areas lined with natural rubber offering superior abrasion resistance | Operational Benefit: Extends service life of launders, pump casings, and screen decks in highly abrasive silica sands | ROI Impact: Lowers annual component replacement costs by approximately 40% based on field data.
Centralized PLC Control & Monitoring | Technical Basis: Industrial programmable logic controller with HMI touchscreen displaying motor loads, feed rates, and pump pressures | Operational Benefit: Enables oneoperator oversight of the entire washing circuit for optimized efficiency | ROI Impact: Reduces operational labor requirements while providing data for preventive maintenance scheduling.
HighG Force Vibrating Screens | Technical Basis: Dual eccentric shaft drives generating optimal screen deck acceleration for sticky materials | Operational Benefit: Prevents blinding of screen meshes, ensuring consistent sizing classification throughout the shift | ROI Impact: Maintains design recovery efficiency by ensuring proper sizing prior to concentration stages.
Integrated Safety Access Systems | Technical Basis: Guardrails, safety grating platforms, and ladders designed per ISO 14122 standards integral to the module structure | Operational Benefit: Provides safe operator access for inspection and routine maintenance tasks| ROI Impact Mitigates risk of workplace incidents, supporting compliance and reducing potential operational liabilities.
4. COMPETITIVE ADVANTAGES
| Performance Metric | Industry Standard (500 Tph Plant) | Our 500 Tph Gold Mining Washing Plant Solution | Advantage (% Improvement) |
|||||
| Average Availability | 8285% | 92%+ | +8% |
| Water Consumption per Ton | 3.5 m³/Ton | <0.7 m³/Ton | 80% |
| Installation & Commissioning Time (from delivery) | 1620 weeks |1012 weeks |35% |
| Liner Life in Primary Scrubber | ~1,200 hours | ~2,000 hours | +67% |
| Power Draw per Processed Ton | ~2.1 kWh/Ton | ~1.8 kWh/Ton |14% |
5. TECHNICAL SPECIFICATIONS
Design Capacity: 500 metric tons per hour (Tph) of 150mm feed material, bulk density ~1.6 t/m³.
Power Requirements: Total connected load approximately 850 kW。 Primary supply: 400V/50Hz or 480V/60Hz,3phase。 Dedicated MCC included。
Material Specifications:
Structural Steel: ASTM A36, primed and painted。
Abrasion Linings: Linatex® or equivalent on all highwear surfaces。
Screen Decks: Polyurethane modular panels on primary sizing decks。
Pump Wetted Parts: Highchrome alloy for slurry duties。
Physical Dimensions (Modular): Configured across 68 interlocking skids。 Max skid dimensions:12m (L) x 3。5m (W) x 4。5m (H)。 Approximate total plant footprint:45m x 25m。
Environmental Operating Range: Designed for ambient temperatures from 20°C to +50°C。 Dust suppression spray system standard。
6. APPLICATION SCENARIOS
West African Alluvial Gold Project
Challenge: A new greenfield site with highly variable clay content(1540%) causing severe blockages in competitor equipment, limiting throughput to under 300 Tph consistently。
Solution: Implementation of our heavyduty scrubber module within the complete 500 Tph Gold Mining Washing Plant, featuring highpressure clay busting spray bars。
Results: Achieved sustained throughput of +480 Tph; plant availability reached 93。2% over the first quarter; clayrelated downtime was eliminated。
Southeast Asian Tailings Reprocessing Operation
Challenge: An existing operation sought to reprocess old tailings dams but faced space constraints for a large water settling pond system。
Solution: Deployment of our 500 Tph Gold Mining Washing Plant with the advanced closedloop water circuit, including highcapacity hydrocyclones。
Results: Fresh water consumption reduced by 85%; plant installed within the confined site; zero discharge license obtained due to efficient water recycling。
7. COMMERCIAL CONSIDERATIONS
Our contract manufacturing model provides clarity from quotation through commissioning。
Pricing Tiers
Tier A – Basic Plant Package
Includes core modules(feed hopper, scrubber, screens, primary concentrator), basic PLC controls, structural steel walkways。
Tier B – Optimized Plant Package (Most Common)
Includes Tier A plus full abrasion lining package, advanced water recycling circuit (thickener), enhanced instrumentation, enclosed electrical MCC。
Tier C – Full Turnkey Solution
Includes Tier B plus onsite supervision of installation & commissioning, operator training package, firstyear critical spares kit。
Optional Features:
Onboard diesel power generation module,
Automated sampling system,
Remote telemetry monitoring package,
Customized conveyor lengths。
Service Packages:
Annual inspection & optimization,
Predictive maintenance program,
Guaranteed spare parts availability (e.g., , nextbusinessday dispatch)。
Financing Options:
Equipment leasing through partner institutions,
Progressbased milestone payment plans,
Rentaltoown structures available。
8.FAQ
Q1 Is this 500 Tph Gold Mining Washing Plant compatible with our existing primary crusher or final gold room?
A1 Yes。 The plant is designed with standardized interface points。 We conduct a full review of your upstream feed conveyor specs和 downstream product requirements to ensure seamless integration into your current flow sheet。
Q2 What is the typical rampup time to achieve full 500 Tph capacity after commissioning?
A2 Field data shows most operations reach 9095% of design capacity within the first 710 days of continuous operation。 Full capacity is typically sustained by week three as operators finetune feed rates。
Q3 How many operators are required per shift to run the plant?
A3 The centralized control system allows efficient operation with 2 personnel per shift—one controlling from the PLC cabin和 one conducting perimeter inspections—reducing labor costs versus legacy systems。
Q4 What are your payment terms?
A4 Standard commercial terms involve a 30% deposit upon contract signing, 40% upon completion of factory acceptance testing(FAT), 25% upon shipment FOB,和 the final 5% upon successful site commissioning。
Q5 What is your Minimum Order Quantity (MOQ) as a contract manufacturer?
A5 Our MOQ is one complete plant system。 We do not typically manufacture individual component modules outside of a full plant contract due to engineering integration requirements。
Q6 Can you provide performance guarantees?
A6 Yes。 Our contract includes guaranteed throughput (±5% of rated 500 Tph) on specified feed material、 final product moisture content、和 overall plant availability during the warranty period subject to agreed feed parameters。
Q7 Do you handle international shipping和 customs clearance?
A7 We manage EXW/FOB/CIF shipping logistics through established partners based on your Incoterms preference。 We provide all necessary technical documentation for customs but do not act as a customs broker within the destination country