Private Label Jc5000 Jaw Crusher Prices
1. APERTURA IMPULSADA POR EL PUNTO DE DOLOR
¿Los crecientes costos operativos y el tiempo de inactividad impredecible están erosionando sus márgenes de procesamiento de agregados o minerales?? Los desafíos clave en las operaciones de trituración primaria a menudo incluyen:
Tiempo de inactividad excesivo para mantenimiento: Frequent liner changes and mechanical adjustments halt your entire production line, costando miles por hora en rendimiento perdido.
Unplanned Breakdowns from Shock Loads: Tramp metal and uncrushable materials cause catastrophic failures, leading to expensive component replacement and extended, paros no programados.
Gradación de producto inconsistente: Worn or poorly adjusted jaws produce offspec material, forcing recrushing and increasing wear on downstream equipment.
Altos costos operativos: Soaring energy consumption per ton of processed material directly impacts your bottomline profitability.
Rigidez para alimentar la variación: Inability to handle varying feed sizes or compositions without manual intervention reduces overall plant flexibility.
What if a primary crusher could directly address these issues with robust engineering focused on reliability and costperton efficiency? La solución requiere una máquina construida no sólo para generar energía, pero por predecible, lowcost operation.
2. DESCRIPCIÓN GENERAL DEL PRODUCTO
The Private Label JC5000 is a highcapacity, Trituradora de mandíbulas excéntrica superior de palanca única diseñada para trituración primaria de servicio pesado en canteras, minería, y aplicaciones de reciclaje de demolición. Its design focuses on delivering maximum availability and the lowest possible cost per tonne in demanding 24/7 operational environments.
Flujo de trabajo operativo:
1. Consumo de alimento: Large runofmine or blasted feed (hasta 1300 mm) se dirige hacia lo profundo, cámara de trituración sin asfixia.
2. Acción aplastante: The aggressive elliptical stroke of the overhead eccentric shaft forces the moving jaw to apply high inertia force at the nip angle, effectively breaking even the hardest granite or abrasive basalt.
3. Descargar & Autorización: The hydraulic toggle release system allows for rapid clearing of stalled cavities by instantly opening the closedside setting (CSS) to release blockages.
4. Control de gradación: Product size is consistently maintained via a simple, repeatable CSS adjustment using hydraulic shims, ensuring uniform feed for secondary crushers.
Ámbito de aplicación & Limitaciones:
Alcance: Ideal para reducción primaria de roca dura. (resistencia a la compresión hasta 400 MPa), concrete demolition debris, and runofquarry stone. Adecuado tanto para plantas estacionarias como para grandes configuraciones móviles con orugas..
Limitaciones: No diseñado para dimensionamiento de productos ultrafinos; El rendimiento óptimo requiere una evaluación previa para eliminar multas excesivas.. Requiere un establo, reinforced concrete foundation and appropriate feeding equipment matched to its intake dimensions.
3. CARACTERÍSTICAS PRINCIPALES
Cámara de trituración profunda | Base técnica: Extended jaw lengthtowidth ratio | Beneficio operativo: Increases feed acceptance capability and delivers higher reduction ratios in a single pass | Impacto del retorno de la inversión: Reduces need for prescreening stages and boosts primary circuit throughput by up to 15%
Hydraulic Toggle Tensioning & Sistema de liberación | Base técnica: Los cilindros hidráulicos de doble acción reemplazan las placas de palanca mecánicas | Beneficio operativo: Permite seguridad, remote clearing of blockages in under two minutes; allows precise CSS adjustment under load | Impacto del retorno de la inversión: Eliminates hours of manual hammering/downtime per blockage event; prevents costly damage from tramp iron

Rodamientos de rodillos esféricos de servicio pesado | Base técnica: Rodamientos de gran diámetro con alta capacidad de carga dinámica | Beneficio operativo: Supports the high radial loads from tough crushing cycles with exceptional service life | Impacto del retorno de la inversión: Extends major bearing service intervals beyond industry average by an estimated 40%, reducing longterm parts expenditure
Atornillado & Construcción de marco acuñado | Base técnica: Secciones de acero fabricadas unidas con pernos de alta resistencia y cuñas de bloqueo. | Beneficio operativo: Provides superior fatigue resistance against shock loads; simplifies field transportation and assembly/disassembly | Impacto del retorno de la inversión: Minimizes risk of catastrophic frame weld failure; cuts relocation costs due to modular construction
Cinemática optimizada & Perfil de trazo | Base técnica: Computermodeled swing jaw motion with steep nip angle at inlet | Beneficio operativo: Promotes aggressive grip on feed material and efficient breakage throughout the chamber; reduces wear at the jaw toe | Impacto del retorno de la inversión: Mejora la eficiencia energética general (kWh/tonelada) by directing force more effectively; extends jaw liner life
Punto de engrase centralizado & PLC Interface| Base técnica: Sistema de lubricación automatizado con monitoreo de controlador lógico programable| Beneficio operativo: Garantiza una lubricación constante de los rodamientos sin intervención del operador.; provides realtime alerts for pressure/temperature anomalies| Impacto del retorno de la inversión: Prevents premature bearing failure due to lubrication neglect; supports predictive maintenance scheduling
4. VENTAJAS COMPETITIVAS
| Métrica de rendimiento | Estándar de la industria (Clase comparable) | Private Label JC5000 Solution | Ventaja (% Mejora) |
| : | : | : | : |
| Tiempo de cambio de revestimiento (Placas de mandíbula) | 812 horas (ajuste manual de cuñas) | <6 horas (hydraulic shim system) | ~40% más rápido |
| Blockage Clearance Time (Promedio) | 48 horas (mechanical cutting/welding) | 16,000 hours demonstrated³L10 life >16,000 hours demonstrated³L10 life >16,000 hours demonstrated³L10 life >16,000 hours demonstrated³L10 life >16,000 hours demonstrated³L10 life >16,000 hours demonstrated³L10 life >16,000 hours demonstrated³L10 life >16,000 hours demonstrated³L10 life >16,000 operating hours design target³L10 life >16,000 operating hours design target³>33% vida útil más larga |
| Energy Consumption per Tonne Processed kWh/tonne baseline kWh/tonne baseline kWh/tonne baseline kWh/tonne baseline Up to 12% lower consumption measured in field trials Up to 12% lower consumption measured in field trials Up to 12% lower consumption measured in field trials Up to 12% lower consumption measured in field trials Up to 12% reducción |
| CSS Adjustment Process Manual shimming requiring downtime Hydraulic adjustment possible during operation Nearzero downtime for gradation changes |
5. ESPECIFICACIONES TÉCNICAS
Apertura de alimentación: 1300mm x 1000 mm (51" incógnita 40")
Tamaño máximo de alimentación: ~1100mm edge length
Rango de configuración del lado cerrado: 150mm 300 mm
Rango de capacidad: Arriba a 750 toneladas por hora (dependiente del material de alimentación y CSS)
Requisito de potencia de accionamiento: 160 kilovatios /200 motor electrico HP
Peso Total (Solo trituradora): Approximately XX,XXX kg
Especificaciones clave de materiales:
Marco: Alta resistencia, placa de acero soldada
Mandíbula oscilante: Forged steel shaft; cast steel jaw stock
Revestimientos de mandíbula: Premium manganese steel (18% Mn)
Placas para mejillas: Acero AR400 resistente a la abrasión
Rango de operación ambiental: Diseñado para temperaturas ambiente de 20°C a +45°C; rodamientos protegidos contra el polvo; adecuado para instalación al aire libre.
6. ESCENARIOS DE APLICACIÓN
Granite Quarry Primary Crushing Station| Challenge: A large granite quarry faced daily production bottlenecks due to frequent blockages from oversized slabs, requiring multiple lengthy stoppages. Their existing crusher suffered from poor energy efficiency, elevating costperton metrics.| Solution: Two Private Label JC5000 units were installed as parallel primary crushers. The hydraulic toggle system was configured for remote activation from the control room.| Results: Blockage clearance time reduced from an average of6hours to under20minutes. Combined plant throughput increased by22%. Energy monitoring showed an8% reduction in kWh per tonne processed within the first quarter.
C a gran escala&D Recycling Plant| Challenge: Processing variable construction&demolition waste led to regular encounters with rebar nests and uncrushable contaminants, causing severe damage and downtime on a standard jaw crusher.| Solution: Implementation of one Private Label JC5000 equipped with an oversized discharge conveyor magnet. The robust frame design和hydraulic release system were critical factors.| Results: The plant reported zero structural damage from tramp metal incidents over18months. Crusher availability exceeded94%, allowing them to fulfill highvolume municipal contracts reliably.
7. CONSIDERACIONES COMERCIALES
The Private Label JC5000 is offered through tiered commercial packages designed for capital planning clarity:
* Base Equipment Price Tier(POA): Includes core JC5000 crusher, motor drive sheaves/vbelts,and basic tool kit.
* Optional Features:
Automated Greasing System(highly recommended)
PLC Control Panel with VFD Soft Start
Wear Liners Package(first set)
Onsite Supervision&Commissioning
* Service Packages:
1) Preventive Maintenance Agreement: Inspecciones programadas,análisis de lubricantes,and priority parts dispatch.
2) Full Coverage Service Plan: Includes scheduled maintenance plus discounted labor和parts coverage for unexpected repairs.
* Financing Options available through partner institutions include equipment leasing(3-7year terms),renttoown structures,and traditional project financing.
8. Preguntas frecuentes
Q1) Is the Private Label JC5000 compatible with my existing primary crushing plant footprint?
A) Field data shows its modular bolted frame often allows it to replace older units of similar capacity without major foundation modifications. Detailed dimensional drawings are provided for specific layout analysis.
Q2) How significant are the operational savings compared to my current crusher?
A) Savings are primarily realized through reduced unplanned downtime(blockage clearing)and extended wear part intervals. A detailed ROI projection based on your current tonnage,downtime logs,and energy costs can be modeled.
Q3) What is the expected lifespan of critical components like the eccentric shaft?
A) With proper maintenance as outlined in the manual,the forged eccentric shaft is designed for a minimum L10life exceeding16000operating hours under normal conditions.
Q4) Are spare parts readily available?
A) Yes. As a core model within our range,critical spare parts(bearings,fauces,toggle seats)are held in regional stock centers globally with guaranteed48-hour dispatch for covered service plans.
Q5) Can you assist with installation和commissioning?
A) Professional installation supervision和commissioning services are offered as an optional package. We provide comprehensive documentation和can certify your operational crew.
Q6) What control integration options are available?
A? The crusher can be supplied as a standalone machine or fully integrated into your plant PLC/SCADA system via standard industrial communication protocols(e.g., Modbus TCP/IP),providing realtime operational data.
Q7? Does pricing include delivery?
A? Base pricing is typically ExWorks (EXW)。 We provide logistical support和competitive freight quotes as part of the commercial proposal。