OEM 250 300planta trituradora de piedra tph
1. APERTURA IMPULSADA POR EL PUNTO DE DOLOR
¿Está administrando una operación de agregados de mediana a gran escala y enfrenta cuellos de botella constantes en su circuito de trituración principal?? The challenges of sourcing and integrating a 250300tph stone crushing plant are wellknown: unpredictable project delays from mismatched component shipping, costly onsite assembly labor, and the operational risk of untested system integration. These factors directly impact your bottom line through extended timetorevenue and budget overruns.
Complejidad logística & Costo: Coordinating multiple shipments for individual crushers, pantallas, and conveyors from various suppliers leads to heightened freight costs, customs complexities, and increased risk of lost or damaged components.
Extended OnSite Commissioning: Piecemeal assembly requires significant skilled labor hours on location, exposing your schedule to weather delays and tying up critical project management resources.
Performance Uncertainty: Plants assembled from disparate OEMs often suffer from integration issues—underrated conveyors, control system incompatibilities, or capacity mismatches—that become apparent only during operation, causing immediate downtime.
Bloqueo de capital: Every day spent in lengthy assembly and tuning is a day your capital investment is not producing saleable material.
What if your 250300tph plant could be shipped as integrated modules, preassembled and factorytested to reduce onsite work by weeks? What if a single point of technical accountability could eliminate compatibility guesswork?
2. DESCRIPCIÓN GENERAL DEL PRODUCTO
La planta trituradora de piedra OEM 250300tph es una completa, Solución estacionaria de trituración y cribado diseñada para la producción de gran volumen de agregados para la construcción., base de la carretera, y lastre ferroviario. It is engineered, fabricado, preassembled into modular sections, tested as a system, and shipped as consolidated loads to significantly reduce field installation time.
Flujo de trabajo operativo:
1. Reducción Primaria: Dump feed into a robust primary jaw crusher for initial size reduction.
2. Secundario & Trituración Terciaria: Material is conveyed to a secondary cone crusher for further reduction; a tertiary cone crusher or impactor can be included for precise shaping and final sizing.
3. Apresto & Clasificación: El material triturado se criba mediante cribas vibratorias de varios pisos.. Onspec product is routed to stockpile conveyors.
4. Recirculación: Oversize material is automatically recirculated back through the appropriate crusher in a closedcircuit loop.
5. Almacenamiento: Los agregados del tamaño correcto se transportan a las pilas de almacenamiento designadas..
Ámbito de aplicación: Ideal para granito, basalto, caliza, y otros abrasivos de dureza media. Suited for greenfield site development or expansion projects requiring reliable output between 250 y 300 toneladas métricas por hora.
Limitaciones: Not designed as portable/mobile equipment; requires stable foundation preparation at the installation site. Maximum feed size and final product specifications are determined by the selected crusher chamber configurations.
3. CARACTERÍSTICAS PRINCIPALES
Diseño de patín modular | Base técnica: Structural steel skids with integrated walkways, guardias, and prerouted cabling | Beneficio operativo: Reduces onsite civil work by up to 30%; modules bolt together with precision alignment points | Impacto del retorno de la inversión: Cuts installation labor costs by an average of 25% versus traditional piecebypiece erection.
Sistema de control PLC unificado | Base técnica: Centralized programmable logic controller with humanmachine interface (HMI) panels at key points | Beneficio operativo: Operators monitor and adjust the entire plant flow from primary feed to final product discharge | Impacto del retorno de la inversión: Optimizes power consumption per ton crushed; reduces troubleshooting time by providing clear system diagnostics.
PreInstalled Belt Conveyor Systems | Base técnica: Conveyors mounted, alineado, and tensioned on their modular skids at the factory | Beneficio operativo: Eliminates weeks of field alignment work; ensures proper belt tracking from initial startup | Impacto del retorno de la inversión: Prevents costly premature belt wear and spillagerelated cleanup/repair downtime.
Alimentador Grizzly Vibrante de Servicio Pesado | Base técnica: Robust feeder with adjustable grizzly bars for scalp removal | Beneficio operativo: Protects the primary crusher from fines overload and removes noncrushable material at the source | Impacto del retorno de la inversión: Extends jaw die life and reduces unscheduled stoppages for cavity clearing.
HighCapacity Cone Crushers with Automation | Base técnica: Secondary/Tertiary crushers equipped with hydraulic setting adjustment and tramp release systems | Beneficio operativo: Maintains consistent product gradation with realtime CSS adjustment; protects machinery from uncrushable material | Impacto del retorno de la inversión: Maximiza el rendimiento del producto inspeccionado.; avoids catastrophic damage leading to sixfigure repair bills.
Sistema integrado de supresión de polvo | Base técnica: Strategically placed spray nozzles fed by a central pump unit | Beneficio operativo: Significantly reduces airborne particulate at transfer points in compliance with environmental standards | Impacto del retorno de la inversión: Minimizes water usage versus manual spraying; avoids potential regulatory fines or work stoppages.
4. VENTAJAS COMPETITIVAS
| Métrica de rendimiento | Estándar de la industria (MultiVendor Sourced) | OEM 250300tph Plant Solution | Ventaja (% Mejora) |
| : | : | : | : |
| Tiempo de instalación en el sitio | 812 semanas (base + asamblea) | 46 semanas (base + module connection) | Arriba a 50% reducción |
| Factory Integration Testing Scope| Individual component runin only (motor direction) | Full closedloop system performance test under load simulation| De 0% a 100% functional verification |
| PostStartup Performance Issues| Common due to interface mismatches (p.ej., conveyor capacity) Rare due to singleOEM design responsibility| Field data shows ~80% reduction in firstmonth mechanical/control issues |
| Transporte & Gestión Logística| Buyer manages multiple shipments & suppliers Single commercial invoice & coordinated shipment schedule| Reduces administrative overhead by ~70%; lowers risk of shipping delays |
5. ESPECIFICACIONES TÉCNICAS
Capacidad de rendimiento diseñada: 250 300 toneladas métricas por hora (varía según la densidad del material & dureza).
trituradora primaria: Cursor de mandíbula (p.ej., Apertura de alimentación: 1200x900mm).
Trituradora secundaria: Trituradora de cono hidráulica de un solo cilindro o de varios cilindros.
Trituradora terciaria (Opcional): Cone Crusher or Vertical Shaft Impactor (TODOS) para dar forma.
Pantalla: Criba vibratoria de tres pisos para trabajo pesado (p.ej., Tamaño: 2400x6000mm).
Potencia Total Instalada: Aproximadamente 550 650 kilovatios.
Power Supply Requirement: Designed for industrial threephase supply; specific voltage configuration available per region.
Estructura del marco principal: Heavyduty welded steel profiles with corrosionresistant primer.
Huella vegetal (Aproximado): Longitud: ~85m x Width: ~35 millones (varía con el diseño).
Rango de operación ambiental: Diseñado para temperaturas ambiente de 20°C a +45°C; dust suppression rated for relative humidity up to 80%.
6. ESCENARIOS DE APLICACIÓN
Quarry Expansion Project – Southeast Asia
Challenge A quarry operator needed to increase output from 180tph to over 280tph within a strict ninemonth window to fulfill a major infrastructure contract. Sourcing equipment separately posed unacceptable timeline risks.
Solution Implementation of a predesigned OEM 250300tph stone crushing plant shipped in six major prewired modules.
Results The plant was commissioned in under five months from order placement. Full production rates were achieved within two weeks of mechanical completion due to comprehensive factory testing.
Greenfield Aggregate Plant – North America
Challenge A new aggregate producer faced high local skilled labor costs and sought to minimize variable expenses during plant construction while ensuring reliability.
Solution Selection of this OEM solution focused on reduced field labor requirements via modularity and included an extended service package for the first year of operation.
Results Onsite construction labor costs were reduced by an estimated $150k USD. The plant achieved its guaranteed production tonnage within the first month of operation with <2% tiempo de inactividad no programado.
7. CONSIDERACIONES COMERCIALES
The capital investment for an OEM stone crushing plant includes engineering design services tailored specifically towards achieving either optimal yield or specific product shape requirements depending upon market demands
Financing options include direct leasing arrangements through partner institutions which may allow payments structured against projected cash flow rather than upfront capital expenditure outlays
Service packages range across three tiers:
1 Basic Warranty Coverage covering parts replacement against manufacturing defects
2 Comprehensive Support Plan including scheduled preventive maintenance inspections remote monitoring access
3 FullService Contract providing guaranteed uptime percentages with dedicated oncall technical support
Optional features that enhance operational flexibility include:
Automated metal detection systems
Advanced process control software linking production data directly into management reporting tools
Additional sound attenuation enclosures suitable near residential areas
Pricing tiers correspond directly toward selected configurations such as inclusion/exclusion tertiary stage type secondary crushing unit optional onboard power generation packages
All commercial proposals include detailed shipping logistics plans port handling recommendations customs clearance assistance documentation required destination country
8.Preguntas frecuentes
Q What level foundation preparation required prior arrival?
A Detailed civil engineering drawings are provided upon order including all anchor bolt locations load bearing requirements minimal concrete volume specifications typically involving reinforced concrete footings key anchor bolts set precisely according plan
Q How does this plant integrate existing equipment like frontend loaders screening units?
A The control system can incorporate input/output signals existing machinery while belt conveyor lengths positions can be adjusted during design phase accommodate specific site layout material flow requirements
P ¿Cuál es el plazo típico de entrega y puesta en servicio??
A Standard lead time engineering manufacturing testing ranges between months depending complexity configuration Shipping transit times vary destination Final commissioning supervised our engineers typically requires two three weeks following module installation
Q Are spare parts packages available?
A Yes recommended initial spare parts kits offered based critical wear components expected consumption rates first months operation ensuring minimal delay obtaining common replacement items
Q Can production capacity upgraded future beyond ?
A Core structural design allows certain upgrades such higher capacity cone crushers wider conveyors additional screen decks however major throughput increases may require reassessment primary crushing unit overall electrical supply infrastructure early consultation recommended planning future expansion