ODM 500 planta de lavado de oro tph
Titular: HighCapacity Alluvial Gold Recovery: The ODM 500 TPH Washing Plant for IndustrialScale Operations
Subtítulo: Engineered for continuous throughput, tiempo de inactividad mínimo, and maximum gold liberation in highclay, highgravel deposits.
Is Your Current Gold Recovery System Costing You 1520% of Your Yield?
You are managing a highvolume alluvial operation. You face the daily challenge of processing material with high clay content that clogs screens and reduces trommel efficiency. You see your recovery rates drop when dealing with cemented gravels, and you calculate the cost of unscheduled downtime for cleaning—often exceeding $2,500 por hora en pérdida de producción y mano de obra.
You need a system that can handle 500 toneladas por hora of runofmine feed without constant operator intervention. You require a plant that liberates gold at the first stage of washing, not after the material has passed through multiple, inefficient stages. El caso es: can your current washing plant maintain 95%+ availability on a 500 TPH feed with 30% contenido de arcilla?
The ODM 500 TPH Gold Mining Washing Plant is designed to answer that question with a specific engineering focus on highenergy scrubbing and efficient screening.
Descripción general del producto: The ODM 500 TPH Washing Plant
Este es un mobile or semimobile, modular washing and screening plant rated for a nominal feed capacity of 500 toneladas métricas por hora. It is a primary recovery solution for alluvial gold, depósitos de placer, and eluvial material.
Flujo de trabajo operativo:
1. Alimentar & Oso pardo: Runofmine material is fed via excavator or loader into a heavyduty vibrating grizzly feeder. Demasiado grande (+150milímetros) is scalped and rejected.
2. HighEnergy Scrubbing: The 150mm material enters a dualdrive, fregadora rotativa de servicio pesado. High water pressure and internal lifters create a turbulent slurry, breaking down clay balls and dispersing conglomerates.
3. Apresto & Cribado: The slurry passes through a multideck vibrating screen system (typically 20mm and 6mm apertures). This separates the +6mm gravel (desperdiciar) from the 6mm fines (concentrarse).
4. Concentración: The 6mm slurry is directed to a downstream recovery circuit (p.ej., plantillas, espirales, o concentradores centrífugos) which is integrated into the plant's design.
Ámbito de aplicación:
- Primario: Alluvial gold, eluvial gold, and weathered hardrock deposits.
- Secundario: Diamond recovery, tin/tantalum processing, and aggregate washing.
- Limitaciones: Not designed for dry processing or hardrock crushing. Requiere un suministro constante de agua. (aprox. 8001200 m³/hora).
- Configuración estándar (Móvil): $1,200,000 $1,500,000 (includes feeder, depurador, pantalla, transportadores, and control panel).
- Integrated Recovery Package: $1,800,000 $2,200,000 (includes jigs, concentradores centrífugos, and tailings management system).
- Solución llave en mano: $2,500,000 $3,000,000 (includes all above, plus piping, eléctrico, y soporte de puesta en marcha).
- ColdWeather Package: Heated bearings, insulated water lines, and synthetic lubricants (+$85,000).
- Sistema de monitoreo remoto: Datos en tiempo real sobre el consumo de energía., flujo de agua, y vibración de la pantalla (+$45,000).
- Wear Part Upgrade: Full ceramiclined scrubber and screen decks (+$120,000).
- Garantía estándar: 12 meses o 2,000 horas de funcionamiento.
- Garantía extendida: 24 months with scheduled maintenance visits (annual cost: $35,000).
- Garantía de rendimiento: Contractual guarantee of 92% tiempo de actividad y 95% clay breakdown efficiency (subject to feed conditions).
- Direct Purchase: 30% depósito, 70% en la entrega.
- ArrendamientoPropio: 3660 términos mensuales con 10% opción de compra.
- Operating Lease: Monthly payments based on throughput (p.ej., $0.50 por tonelada procesada).
Características principales: Engineering for Uptime and Recovery
HighEnergy DualDrive Scrubber | Base técnica: Counterrotating drum with highlift, wearresistant liners | Beneficio operativo: Reduces clay retention time by 40% compared to singledrive units, ensuring complete particle liberation | Impacto del retorno de la inversión: Eliminates secondary scrubbing passes, ahorro $0.15 $0.25 per ton in energy and water costs

Alimentador Grizzly Vibrante de Servicio Pesado | Base técnica: Variable speed drive with stepped grizzly bars (150mm gap) | Beneficio operativo: Prevents oversize rock from entering the scrubber, protecting internal liners and reducing wear | Impacto del retorno de la inversión: Extends scrubber liner life by 3050%, reduciendo los costos de mantenimiento anual en un estimado $18,000 $25,000
Sistema de cubierta de pantalla modular | Base técnica: Polyurethane screen panels with a quickchange tensioning system | Beneficio operativo: Screen deck changeover in under 2 horas frente a. 68 hours for bolted steel systems | Impacto del retorno de la inversión: Reduces downtime for product specification changes, increasing annual operating hours by 150200 horas
Integrated Slurry Distribution Box | Base técnica: Adjustable weir and splitter gates | Beneficio operativo: Allows the operator to divert slurry to different recovery circuits (jigs vs. espirales) without stopping the plant | Impacto del retorno de la inversión: Enables realtime optimization of recovery based on feed grade, improving recovery by 25% in variable deposits
HighPressure Water Injection System | Base técnica: 12bar rated nozzles with a selfcleaning filter manifold | Beneficio operativo: Maintains consistent water pressure at the scrubber inlet, even with variable pump output | Impacto del retorno de la inversión: Reduce el consumo de agua en 15% through optimized jet placement, reduciendo los costos de bombeo
Centralized Hydraulic Drive System | Base técnica: Single hydraulic power pack driving scrubber, alimentador, y transportadores | Beneficio operativo: Eliminates multiple electric motors and gearboxes, reducing electrical failure points by 60% | Impacto del retorno de la inversión: Lower spare parts inventory and simplified troubleshooting, reduciendo el tiempo medio de reparación (MTTR) por 35%
Ventajas competitivas: Performance Metrics
| Métrica de rendimiento | Estándar de la industria (500 Planta TPH) | ODM 500 Solución TPH | Ventaja (% Mejora) |
| : | : | : | : |
| Clay Breakdown Efficiency | 8590% (single pass) | 9799% (single pass) | 815% liberación superior |
| Screen Deck Changeover Time | 68 horas | 1.52 horas | 7075% más rápido |
| Consumo de agua (por tonelada) | 2.5 3.0 m³/tonelada | 1.8 2.2 m³/tonelada | 2027% lower water usage |
| tiempo de actividad (mantenimiento programado) | 8588% | 9295% | 58% mayor disponibilidad |
| Desgaste parte de la vida (Revestimientos de fregado) | 3,000 4,000 horas | 5,000 6,500 horas | 4060% vida útil más larga |
| Consumo de energía (por tonelada) | 0.8 1.0 kWh/tonelada | 0.6 0.75 kWh/tonelada | 2025% menor costo de energía |
Especificaciones técnicas (ODM 500 Modelo TPH)
| Parámetro | Especificación |
| : | : |
| Nominal Feed Capacity | 500 TPH (based on 1.6 t/m³ bulk density) |
| Tamaño máximo de alimentación | 600 milímetros (with grizzly) |
| Scrubber Dimensions | 3.0m diameter x 12.0m length |
| Screen Deck Area | 18 m² (two decks) |
| Requisito de energía | 350 450 kilovatios (dependiendo del contenido de arcilla) |
| Requerimiento de agua | 800 1,200 m³/hour at 46 bar |
| Peso operativo | 85,000 95,000 kilos |
| Dimensiones de transporte | 18metro (l) x 3,5m (W.) x 4.2m (h) (por módulo) |
| Temperatura de funcionamiento | 10°C a 45°C (with optional coldweather package) |
| Material de construcción | Marco principal: Acero estructural S355; Piezas de desgaste: AR400/AR500, Poliuretano |
Escenarios de aplicación: Field Results
Guión 1: HighClay Alluvial Deposit in West Africa | Desafío: A client was processing material with 3540% contenido de arcilla. Their existing plant required a 2hour shutdown every 8 hours to clear clay buildup in the scrubber and screens. | Solución: Installation of the ODM 500 TPH plant with the highenergy dualdrive scrubber and selfcleaning screen system. | Resultados: Clay buildup eliminated. Plant achieved 93% uptime in the first month. Recovery of fine gold (0.3milímetros) increased by 12% debido a una mejor liberación.
Guión 2: Remote River Terrace Operation in South America | Desafío: The site had limited water availability and a high cost for dieselgenerated power. The existing plant consumed 3.2 m³/ton of water and 1.1 kWh/tonelada. | Solución: The ODM 500 TPH plant with the highpressure injection system and hydraulic drive. | Resultados: Water consumption reduced to 2.0 m³/tonelada, ahorro 1.2 million m³ of water annually. Power consumption dropped to 0.7 kWh/tonelada, reducing fuel costs by $180,000 por año.
Guión 3: Contract Mining for a Major Gold Producer | Desafío: The contractor needed a plant that could be mobilized to three different sites within a 12month period. The plant had to handle both gravel and cemented laterite. | Solución: The modular ODM 500 Planta TPH, designed for containerized transport and rapid reassembly. | Resultados: Sitetosite relocation completed in 14 días (including disassembly, transporte, y reensamblaje). The plant processed 1.2 million tons over 10 meses con 91% disponibilidad mecánica.
Consideraciones comerciales
Niveles de precios de equipos:
Características opcionales:
Paquetes de servicios:
Opciones de financiación:
Preguntas frecuentes
Q1: Can the ODM 500 TPH plant handle material with high clay content (encima 40%)?
Sí. The dualdrive scrubber is specifically engineered for highclay environments. Los datos de campo muestran 97% breakdown efficiency in material with up to 45% contenido de arcilla. For extreme clays (50%+), we recommend a prewetting conveyor or a longer retention time scrubber.
Q2: ¿Cuál es el tiempo de entrega típico??
Configuración estándar: 1620 semanas desde la confirmación del pedido. Custom configurations with the integrated recovery package: 2428 semanas.
Q3: Does the plant require a concrete foundation?
No. The plant is designed for a compacted gravel pad. For semimobile applications, a steel skid base is provided. For permanent installations, a concrete foundation is recommended but not mandatory.
Q4: ¿Cuál es la vida útil esperada de las piezas de desgaste??
Scrubber liners (AR500): 5,0006,500 horas. Paneles de pantalla (poliuretano): 3,0004,000 horas. Grizzly bars: 8,00010,000 horas. Actual lifespan depends on feed abrasiveness and clay content.
Q5: Can the plant be integrated with an existing recovery circuit?
Sí. The plant is designed with a standard slurry discharge point (typically a 12inch flanged outlet). We provide a technical integration guide for connecting to jigs, espirales, o concentradores centrífugos.
Q6: What are the power and water requirements for installation?
Fuerza: 350450 kilovatios, 3fase, 380480V, 50/60 Hz. Agua: 8001,200 m³/hour at 46 bar. We recommend a dedicated water supply line with a minimum 10inch diameter.
P7: ¿Está incluida la formación del operador??
Sí. We provide a 3day onsite training program for up to 4 operators and 2 tecnicos de mantenimiento. This covers startup, cerrar, mantenimiento de rutina, y solución de problemas.


