Ecológico 500 Distribuidores De Plantas De Lavado De Minería De Oro Tph

Breve descripción:

H1: Alta capacidad, EcoFriendly 500 Planta de lavado de minería de oro TPH: Engineered for Profitability and Compliance 1. PAINPOINT DRIVEN OPENING Managing a highyield gold mining operation requires balancing throughput with environmental responsibility and operational cost. Common challenges with traditional washing and scrubbing plants include: Excessive Water Consumption & Gestión de relaves: Highvolume operations can consume millions of liters…


Detalle del producto

Etiquetas de producto

H1: Alta capacidad, EcoFriendly 500 Planta de lavado de minería de oro TPH: Engineered for Profitability and Compliance

1. APERTURA IMPULSADA POR EL PUNTO DE DOLOR

Managing a highyield gold mining operation requires balancing throughput with environmental responsibility and operational cost. Common challenges with traditional washing and scrubbing plants include:

Excessive Water Consumption & Gestión de relaves: Highvolume operations can consume millions of liters daily, creating costly water sourcing and contaminated tailings pond liabilities.
Inconsistent Recovery in ClayBound Deposits: Heavy clay content can cause blinding, reduce gold liberation, and create slurry viscosity issues, directly impacting recovery rates.
High Operational Downtime for Maintenance: Abrasive materials and constant wear on scrubber drums, pantallas, and pumps lead to frequent stoppages, crippling your 500 TPH production target.
Significant Energy Expenditure: Inefficient material handling, oversized motors, and poor process design inflate power costs, un gasto operativo primario.
Regulatory NonCompliance Risk: Failing to meet evolving environmental standards on water recycling and sediment control results in fines and project delays.

Are you seeking a solution that maintains your required 500 TPH throughput while systematically addressing these cost and compliance hurdles?Ecológico 500 Distribuidores De Plantas De Lavado De Minería De Oro Tph

2. DESCRIPCIÓN GENERAL DEL PRODUCTO

The EcoFriendly 500 La planta de lavado de minería de oro TPH es una planta modular, heavyduty scrubbing and classification system designed for alluvial and eluvial deposits. It effectively disintegrates cemented clays, removes contaminants, and classifies material to prepare paydirt for downstream gravity or leaching recovery.

Flujo de trabajo operativo:
1. Alimentación primaria & Pre-selección: Runofmine material is uniformly fed via apron feeder to a primary scalping screen, removing oversize rocks (+75milímetros).
2. Fregado intensivo & Liberación: The sub75mm material enters a largediameter, longlength rotary scrubber. Robust lifters cascade the material for maximum attrition, breaking down clay agglomerates and exposing gold particles.
3. Clasificación del tamaño de partículas: The scrubbed slurry is processed through a series of vibrating screens or hydrocyclones to separate the target fraction (p.ej., 10milímetros) for further processing.
4. Gestión del agua & Reciclaje: Effluent is channeled into a compact water treatment module where solids settle; el agua clarificada se recircula, minimizing fresh water demand by up to 80%.

Ámbito de aplicación & Limitaciones:
Ideal para: Alluvial/placer gold deposits, eluvial materials with high clay content, conglomerate cement breakdown, and preconcentration ore washing.
Limitaciones: Not designed for hard rock primary crushing. Feed size should be controlled below 200mm for optimal scrubber performance.

3. CARACTERÍSTICAS PRINCIPALES

Advanced Water Recirculation Module | Base técnica: Multistage settling tanks with flocculant dosing | Beneficio operativo: Dramatically reduces fresh water intake and tailings pond volume | Impacto del retorno de la inversión: Reduce los costos de adquisición de agua hasta en 80% and reduces environmental bonding liabilities

HeavyDuty Rotary Scrubber Drum | Base técnica: Highstress finite element analysis (FEA) design with replaceable Nihard liner segments | Beneficio operativo: Sustained performance in abrasive conditions with easy liner replacement | Impacto del retorno de la inversión: Increases mean time between maintenance (MTBM) por aproximadamente 40%, supporting consistent throughput

Unidad de frecuencia variable (VFD) Sistema de control | Base técnica: Precision motor control across feeders, scrubber, and pumps | Beneficio operativo: Operators can finetune processing parameters based on feed variability | Impacto del retorno de la inversión: Optimiza el consumo de energía., reducing energy use per ton by an estimated 1525%

Diseño modular BoltTogether | Base técnica: Preengineered structural subassemblies | Beneficio operativo: Enables rapid site deployment and future plant reconfiguration | Impacto del retorno de la inversión: Reduce el tiempo de instalación hasta en 30%, acelerando el tiempo de producción

Integrated Oversize Waste Conveyor System | Base técnica: Direct discharge from scalping screen to dedicated waste conveyor | Beneficio operativo: Removes barren oversize material early in the process | Impacto del retorno de la inversión: Lowers handling costs downstream and increases effective capacity of recovery circuits

Engrase centralizado & Puntos de Monitoreo | Base técnica: Manifolded lubrication lines to all major bearings | Beneficio operativo: Simplifies routine maintenance enhances component lifespan| Impacto del retorno de la inversión: Reduces daily service time by ~25% and prevents costly bearing failures

4. VENTAJAS COMPETITIVAS

| Métrica de rendimiento | Estándar de la industria (500 Planta TPH) | EcoFriendly 500 Solución TPH | Ventaja (% Mejora) |
| : | : | : | : |
| Consumo de agua dulce (m³/h) | 800 1,200 m³/h (oncethrough) | 70% Reducción |
| Eficiencia de desintegración de la arcilla| ~85% liberation in moderate clays |>95% liberation in heavy clays ~12% Improvement |
| promedio. Consumo de energía (kilovatios) @ Full Load| ~900 kW (fixed speed systems)| ~720 kW (with optimized VFDs)| ~20% de reducción |
| Intervalo de mantenimiento planificado(Revestimientos de fregado)| Cada 1,200 1 ,500 horas| Every2 ,000 horas| +33% Aumentar|
| Instalación & Tiempo de puesta en servicio|1620 semanas( field welding)|1214 semanas(atornillado modular)|~30% más rápido|

_Based on standardized field tests for defined clay plasticity index._Ecológico 500 Distribuidores De Plantas De Lavado De Minería De Oro Tph

5. ESPECIFICACIONES TÉCNICAS

Capacidad nominal: 500 toneladas métricas por hora (alimento seco).
Tamaño de alimentación máximo: 200milímetros.
Scrubber Drum Dimensions: Diameter x Length tailored for duty; typical configuration includes Ø3.6m x 9m drum.
Potencia motriz: Scrubber driven by twin motor/reducer assemblies totaling approximately400 kW(VFD controlled).
Potencia total conectada(Planta): Aprox. .850 kilovatios(highly dependent on optional modules).
Materiales de construcción: Abrasionresistant steel structures;scrubber lined with replaceable Nihard or manganese steel segments;paneles de pantalla de poliuretano .



















.
.
.
.
'
'
'
'
"
"
"
"
`
`
`
`
~
~
~
~

Deja tu mensaje

Escribe aquí tu mensaje y envíanoslo

Deja tu mensaje