Costumbre 500 Tph Gold Mining Washing Plant Manufacturers
H1: Alto rendimiento, Alta eficiencia 500 Planta de lavado de minería de oro TPH
1. APERTURA IMPULSADA POR EL PUNTO DE DOLOR
Scaling alluvial or eluvial gold recovery to 500 tonnes per hour presents distinct operational and financial challenges. ¿Estás experimentando:
Cuellos de botella en el rendimiento: Inconsistent feed handling or inadequate scrubbing capacity limiting your plant to below its designed tonnage, leaving potential revenue in the ground.
Altos costos operativos: Consumo excesivo de agua, high fuel usage for power generation, and frequent component wear in abrasive conditions directly eroding profit margins.
Pérdidas de recuperación: Fine gold losses in the sluicing or concentration stages due to inefficient separation technology or poor process control.
Tiempo de inactividad excesivo: Frequent maintenance stops due to undersized components, unoptimized material flow, or the failure of a single critical unit halting the entire 500 TPH line.
Deployment Complexity: Extended installation and commissioning timelines for modular plants that lack true plugandplay design, delaying your project's cashflow positive date.
The central question for project managers is: ¿Cómo se puede lograr confiabilidad?, costpertonne processing at a 500 TPH scale while maximizing recovery and minimizing operational overhead?
2. DESCRIPCIÓN GENERAL DEL PRODUCTO
Nuestra solución de ingeniería es una completa, modular 500 planta de lavado de oro tph. This turnkey system is designed for highvolume recovery of gold from alluvial, placer, y depósitos eluviales. The operational workflow is optimized for continuous, procesamiento de alta capacidad:
1. Alimentación primaria & Depuración: Runofmine material is uniformly fed into a robust scrubber for aggressive clay breakdown and ore preparation.
2. Apresto & Rechazo de Residuos: Efficient screening separates oversize waste rock and directs sub8mm (configurable) material to the concentration circuit.
3. Concentración de gravedad: Primary and secondary gravity concentration stages (p.ej., enhanced sluices, concentradores centrífugos) recover gold across a broad particle size range.
4. Gestión de relaves & Manejo de agua: An integrated water recirculation system minimizes fresh water requirements, while stacked tailings handling is designed for environmental compliance.
Ámbito de aplicación: Ideal for largescale alluvial operations, depósitos ribereños, and weathered eluvial zones with significant clay content. This plant is engineered for semimobile or fixed installation on prepared pads.
Limitación clave: Esta planta no está diseñada para roca dura. (veta) ore processing requiring crushing and milling circuits.
3. CARACTERÍSTICAS PRINCIPALES
Módulo de fregado de servicio pesado | Base técnica: Accionamiento del tambor de alto par con elevadores internos | Beneficio operativo: Effective disintegration of cemented clays and agglomerates, ensuring liberated feed to downstream screens | Impacto del retorno de la inversión: Reduces recirculation load and prevents blockages, directly supporting sustained 500 Rendimiento de TPH.
Tiered Vibrating Screen Deck | Base técnica: Multislope screen design with polyurethane panels | Beneficio operativo: Highefficiency sizing with reduced blinding; precise split between coarse waste (+8milímetros), process gravels (82milímetros), y multas (2milímetros) | Impacto del retorno de la inversión: Optimizes feed to specific concentration units, improving overall recovery efficiency by ensuring correct particle size distribution.
Parallel Concentrator Circuitry | Base técnica: Duplicated gravity concentration lines with independent feed control | Beneficio operativo: Provides operational redundancy; allows maintenance on one line while the other operates at reduced capacity | Impacto del retorno de la inversión: Mitigates total plant downtime risk by up to 50% for circuit servicing, proteger los objetivos de producción diarios.

Sistema inteligente de recirculación de agua | Base técnica: Multistage settling ponds/clam tank design with variablespeed pump control | Beneficio operativo: Se recupera hasta 85% de agua de proceso para reutilización; clarifies water before recirculation to prevent pump wear | Impacto del retorno de la inversión: Cuts freshwater sourcing and pumping costs significantly—critical in remote or arid regions.
Control PLC centralizado & Escucha | Base técnica: Controlador lógico programable industrial con interfaz HMI que monitorea cargas de motores, tasas de alimentación, y estados de la bomba | Beneficio operativo: Enables singleoperator overview of the entire washing plant; provides early fault detection diagnostics | Impacto del retorno de la inversión: Lowers labor requirements per tonne processed and allows predictive maintenance scheduling to avoid catastrophic failures.
Diseño modular BoltTogether | Base técnica: Structural steel modules with standardized connection points | Beneficio operativo: Reduces onsite fabrication; enables faster installation using local crews with standard lifting equipment | Impacto del retorno de la inversión: Shortens commissioning timeline by an estimated 30%, acelerando el tiempo de producción.

Paquete de revestimiento resistente a la abrasión | Base técnica: Highchrome wear plates and urethane liners in all highwear chutes and launders | Beneficio operativo: Extends service life of critical material transfer points from months to years in abrasive silica environments | Impacto del retorno de la inversión: Lowers longterm spare parts inventory costs and reduces downtime associated with liner replacement.
4. VENTAJAS COMPETITIVAS
| Métrica de rendimiento | Estándar de la industria (500 Escala TPH) | Nuestro 500 TPH Gold Washing Plant Solution | Ventaja (% Mejora) |
|||||
| Rendimiento sostenido | Frequent dips to ~420450 TPH due to feed inconsistencies | Maintains ±490 TPH via controlled feed & scrubber design | +10% Uptime Efficiency |
| Consumo de agua | ~1500 m³ per hour | ~1200 m³ per hour via closedloop recirculation |20% Resource Use |
| Recuperación de oro fino (<100 malla) 7075% capture rate in primary sluice 8082% capture rate via optimized multistage circuit +10% Recovery Yield |
| Tiempo completo de puesta en servicio de la planta 1216 weeks after component arrival 810 semanas gracias a los módulos premontados 33% Installation Duration |
| Critical Component Wear Life (Revestimientos de fregado) 68 promedio de meses 1214 months guaranteed with specified liner package +80% Intervalo de servicio |
5. ESPECIFICACIONES TÉCNICAS
Capacidad de diseño: 500 Toneladas por hora (alimento seco)
Tamaño de alimentación máximo: Hasta 250 mm
Requisitos de energía: Aprox.. 850 kVA total installed power (Diesel generator set or grid connection)
Requisitos de agua (Makeup): Aprox.. 300 m³/hr fresh water at peak operation
Especificaciones clave de materiales:
Acero estructural: ASTM A36
Superficies de desgaste: Acero AR400 / Hierro fundido con alto contenido de cromo / Polyurethane as specified
Paneles de pantalla: Polyurethane tensioned panels
Dimensiones físicas (Modular Layout): Aprox.. Length 85m x Width 25m x Height 12m (configured).
Rango de operación ambiental: Diseñado para una temperatura ambiente de 20 °C a +50 °C. Dust suppression kit available for arid environments.
6. ESCENARIOS DE APLICACIÓN
Operación aluvial a gran escala en África occidental
Desafío Un sitio maduro necesitaba actualizarse desde múltiples plantas más pequeñas (~300 TPH total) to a singlestream highcapacity plant to reduce operating footprint and labor costs while processing deeper gravels with higher clay content.
Solution Implementation of our complete modular 500 Tph Gold Mining Washing Plant with an emphasis on the heavyduty scrubbing module and expanded water management system.
Results The consolidated plant achieved a sustained throughput of 480 TPH at a lower cost per tonne than three legacy plants combined. Claybound gold recovery improved by an estimated 8%, contributing directly to increased overall yield within the first quarter.
Eluvial Deposit Development in Central Asia
Challenge A new project faced strict environmental regulations on water use and tailings discharge in a region with limited water access.
Solution Deployment of our washing plant configured with the advanced Intelligent Water Recirculation System alongside highcapacity mechanical dewatering screws on tailings lines.
Results Field data shows freshwater consumption was reduced by over75%. The drier tailings stack allowed for more stable depositionand facilitated site rehabilitation planning meeting regulatoryaudits successfully
Consideraciones comerciales
Equipment pricing is structured around three core tiers:
1\. Base Plant Package Includes all major modulesfeed system scrubber screening decks primary gravity sluices basicwater pumps PLC controls structural steel walkways
2\. Enhanced Recovery Package Adds secondary centrifugal concentrators security controls trommel screen optionfor sticky material upgraded instrumentation
3\. Turnkey Site Package Includes full civil engineering drawings foundation packs piping electrical harnesses commissioning supervision operator training
Optional Features Onsite power generation packages dust suppression covers advanced metallurgical test work support remote monitoring telemetry
Service Packages We offer tiered annual service agreements from basic technical support upto guaranteed parts availabilitywith onsite technician coverage Financing options including leaseto ownand milestonebased project financing are available through our partners
Preguntas frecuentes
Q What type offeed preparationis required beforetheplant
A Theplantis designedfor runofmineROMalluvialmaterialupto250mm Optimal performance requiresa frontend loaderorfeeder capableof providing consistent nonsegregatedfeedto thereceiving hopper Precrushingisnot typicallyrequired
Q How manyoperatorsare neededtoruntheplant
A ThecentralizedPLCcontrolsystemallowsforefficientoperationbya crewof34personnelonecontrolroomoperatorand23floor personnelformonitoringandbasicmaintenance
Q Arethemodulescompatiblewithothermanufacturers'equipment
A Yes Interfacingpointsfeedchutes slurrydischarge pumpsare designedtostandardindustry sizes Electricalcontrolpanelscanbe configuredtomatchyour existing site voltageandprotocolrequirements
Q Whatisthetypicalleadtimefromorderto shipment
A ForastandardBasePlantPackage leadtimeis2024weeks dependingoncurrentproduction schedule Enhancedpackagesmayadd24weeks
Q Doyouprovideperformanceguarantees
A Yes Weprovideguaranteesonsustainedthroughput mechanicalavailability ofthecoremodulesandwaterrecirculationrates basedonagreedfeedmaterialcharacteristicsprovidedduringtheengineeringphase
Q Whatisthesparepartsstrategyforremotelocations
A Werecommendandinventoryaninitialcriticalspareskit tailoredtoyoursite Wealsomaintainregionalwarehousestockingforwearscomponentswithpriorityairfreightsupport
Q Canyouassistwithpermittingandenvironmental documentation
A Yes Wecanprovidecomprehensiveprocessflow diagrams massbalance calculations equipmentdatasheetsandspecificationsheetsrequiredforenvironmentalandoperatingpermitapplications