Adquisición de agente de abastecimiento de criba vibratoria de coque

Breve descripción:

1. PAINPOINT DRIVEN OPENING Is your coke handling and classification process a source of chronic downtime and cost overruns? Para gerentes de planta que supervisan el cribado de coque, common operational challenges include: Cegador & Continuar: Bien, Cubiertas de pantalla ciega de partículas de coque pegajosas, while oversized material carries over into finished product bins, compromising quality and forcing manual intervention. Excesivo…


Detalle del producto

Etiquetas de producto

1. APERTURA IMPULSADA POR EL PUNTO DE DOLOR

Is your coke handling and classification process a source of chronic downtime and cost overruns? Para gerentes de planta que supervisan el cribado de coque, common operational challenges include:
Cegador & Continuar: Bien, Cubiertas de pantalla ciega de partículas de coque pegajosas, while oversized material carries over into finished product bins, compromising quality and forcing manual intervention.
Ciclos de mantenimiento excesivos: The abrasive nature of coke accelerates wear on screen panels, aspectos, y excitadores, llevando a frecuentes, unplanned shutdowns for parts replacement.
Separación de multas ineficiente: Inconsistent vibration patterns fail to properly separate breeze from nut coke, resulting in product specification misses and lost revenue from misclassified material.
Fatiga estructural & Falla: Highcycle operations under heavy load lead to weld cracks and structural failures in the screen body, creating major capital repair events.

These issues translate directly into quantifiable losses: Horas de producción perdidas por mes., rising spare parts inventories, and inconsistent product quality affecting customer contracts. How do you achieve reliable separation with minimal maintenance? The answer lies in specifying a purposeengineered Criba vibratoria de coque.

2. DESCRIPCIÓN GENERAL DEL PRODUCTO

A Criba vibratoria de coque es una máquina de cribado industrial de alta resistencia diseñada para el descalzado, apresto, y desempolvado de coque metalúrgico y coque de petróleo. Its core function is to separate bulk coke into precise fractions (p.ej., blast furnace nut coke, coque de fundición, brisa) using controlled vibratory motion.

Flujo de trabajo operativo:
1. Alimentar & Distribución: Bulk coke is fed onto the screen’s robust feed box, which evenly distributes material across the full width of the first screening deck.
2. Estratificación & Separación: Highintensity vibration stratifies the material; fines pass through upper deck apertures while larger particles travel across the deck surface.
3. Apresto & Descargar: Multideck configurations allow for sequential sizing. Correctly sized fractions discharge from designated discharge spouts into separate conveyors or bins for downstream processing.

Ámbito de aplicación: Primary sizing of ovendischarged coke, scalpandscreen circuits in byproduct plants, final product grading before shipment, y aplicaciones de desempolvado.Adquisición de agente de abastecimiento de criba vibratoria de coque

Limitaciones: No diseñado para aplicaciones de cribado húmedo o lodo. Maximum lump size is constrained by feed chute and deck aperture design; typically handles feed sizes up to 300mm.

3. CARACTERÍSTICAS PRINCIPALES

Sistema de soporte de plataforma de servicio pesado | Base técnica: Reinforced crossmembers with bolted clamp rails | Beneficio operativo: Eliminates welded deck frame fatigue; allows for rapid panel changeout (bajo 4 horas frente a. 12+). | Impacto del retorno de la inversión: Reduces downtime for maintenance by over 65% and extends structural life beyond 10 años.

AntiBlinding Ball Deck System | Base técnica: Rubber balls trapped beneath screen panels provide continuous percussive cleaning | Beneficio operativo: Prevents aperture clogging from sticky fines, maintaining consistent throughput and screening efficiency above 95%. | Impacto del retorno de la inversión: Ensures onspec product yield, reducing qualityrelated rejections by an estimated 18%.

Dual CounterRotating Exciter Drive | Base técnica: Two synchronized eccentric shafts generating a linear vibratory motion | Beneficio operativo: Delivers powerful yet controllable material travel speed with minimal transmitted stress to the support structure. | Impacto del retorno de la inversión: Lowers structural maintenance costs and improves bearing life (typically L10 > 30,000 horas).

Modular Polyurethane Screen Panels | Base técnica: Highresilience PU with varied aperture design (square, slotted) | Beneficio operativo: Abrasion resistance is 810x that of steel wire cloth; significantly reduces noise levels (<85 dB(A)). | Impacto del retorno de la inversión: Cuts panel replacement frequency and inventory costs while improving workplace safety compliance.

Enclosed DustTight Body Design | Base técnica: Continuous gasketing between side plates and decks with multiple dust extraction ports | Beneficio operativo: Contains particulate matter at transfer points, supporting plantwide emission control targets. | Impacto del retorno de la inversión: Mitigates environmental compliance risks and reduces cleanup labor.

Monitoreo de condición integrado PLC | Base técnica: Vibration sensors and temperature probes on exciter bearings linked to plant DCS | Beneficio operativo: Provides realtime health data for predictive maintenance scheduling. | Impacto del retorno de la inversión: Previene fallas catastróficas en los rodamientos; enables planned shutdowns versus emergency stops.

4. VENTAJAS COMPETITIVAS

| Métrica de rendimiento | Estándar de la industria (Pantallas convencionales) | Nuestra solución de criba vibratoria de coque | Ventaja (% Mejora) |
| : | : | : | : |
| Eficiencia de detección (for 25mm fines) | 8892% sustained efficiency before blinding affects output. Field data shows our solution maintains >95% efficiency over longer campaigns due to antiblinding systems.| >95% sustained efficiency maintained over full panel life cycle.| +7% average improvement in yield accuracy |
| Annual Deck Panel Replacement Cost (for primary sizing) Based on abrasive wear rates in hightonnage applications.| Annual replacement required with standard steel panels.| Polyurethane panel lifespan averages 3x longer than highcarbon steel wire cloth.| ~67% reduction in annual panel cost |
| Tiempo medio entre fallos (MTBF) Major Components Structural integrity under full load conditions.| ~812 months before weld inspection/repair on deck supports is needed.| Design eliminates critical weld points in stress zones; MTBF exceeds 24 meses.| +100% improvement in structural reliability |
| Total Maintenance Hours Per Year Includes routine bearing checks,lubricación,and panel changes based on industry surveys.| Estimado 80120 hours/year for a single unit.| Monitoreo predictivo & quickchange decks reduce total to ~40 hours/year.| ~60% reduction in direct labor hours |

5. ESPECIFICACIONES TÉCNICAS

Capacidad / Clasificación: dependiente del modelo; rango estándar de 500 MTPH a 2,500 MTPH of bulk coke.
Requisitos de energía: Dual exciter drives from 2 incógnita 15 kW a 2 incógnita 55 motores kW (400/690V y), dependiendo del tamaño del modelo.
Especificaciones de materiales:
Placas laterales & Marcos de cubierta: Acero al carbono de alta resistencia (Q345B or equivalent).
Cubiertas de pantalla / Paneles: Modular polyurethane or rubberclad steel panels.
Revestimientos / Wear Protection: AR400 abrasionresistant steel at all feed points.
Dimensiones físicas (Typical Large Unit): Overall length ~7m; ancho ~3m; height ~2m; peso aproximado. 1218 montones.
Rango de operación ambiental: Diseñado para temperaturas ambiente de 20°C a +45°C. Dust protection rating standard at IP65 for electrical components.

6. ESCENARIOS DE APLICACIÓNAdquisición de agente de abastecimiento de criba vibratoria de coque

Integrated Steel Plant – Blast Furnace Feed Circuit

Challenge A major steel producer faced persistent blinding on their primary coke screens during humid months.This caused nut coke contamination with excessive fines (6milímetros), risking blast furnace permeability,and required biweekly manual cleaning halting the line.Their existing screens' welded decks were prone to cracking,causing further unplanned downtime.Solution Implementation of two new heavyduty Coke Vibration Screens featuring sealed balltray antiblinding systems,a bolted modular deck structure,and polyurethane panels.The installation was timed with a scheduled furnace reline.The Results Screening efficiency for 6mm material stabilized at ≥96%.Manual cleaning was eliminated.Product consistency improved,directly contributing to stable furnace operation.Maintenance downtime related to screening was reduced by an estimated75%,and no structural repairs have been required in three years of operation.

Petroleum Coke Processing Terminal

Challenge At a bulk export terminal handling calcined petroleum coke,vibrationinduced fatigue was causing catastrophic failures in screen support structures every1418 months.Dust emission at transfer points also exceeded new local regulations,due to poor sealing on old equipment.Solution Procurement of customengineered Coke Vibration Screens with reinforced,twinbeam base frames designed for higher Gforces,and fully enclosed,dusttight bodies integrated with the plant's extraction system.The Results Structural integrity has been maintained beyond36 months with no signs of stress fatigue.Dust emissions at the screening station measured below permitted levels,satisfying compliance audits.The terminal reported a22% reduction in total costofownership per ton screened over two years due to lower repair costs

7.CONSIDERACIONES COMERCIALES

Equipment pricing tiers are primarily determined by size(capacidad),especificaciones de materiales,and optional features.Base models are offered as complete units ready for installation onto existing support structures.Pricing follows an industrial capital goods model rather than light commercial equipment pricing.Optional features that affect cost include:
Paquetes avanzados de monitoreo de condición(vs.basic local gauges)
Specialized wear liners(ceramic composite vsstandard AR steel)
Explosionproof motor specifications(for certain environments)
Custom discharge spout configurations

Los paquetes de servicios están disponibles por separado.,ranging from basic commissioning supervision up through comprehensive multiyear performance contracts that include scheduled inspections,predictive monitoring analysis,and guaranteed spare parts availability.Financing options through partner institutions can structure payments as operating leases or term loans aligned with project finance timelines,making capital appropriation easier

8.Preguntas frecuentes

Q1.Are your Coke Vibration Screens compatible with our existing feedand discharge conveyor heights?
A1.Dimensional drawings are provided during the quotation phase.Customizable leg heights,support pedestal designs,and feed box configurations ensure interface compatibility with your current layout

Q2.What is the expected impact on our overall plant vibration levels?
A2.When properly installed on supplied isolation springs or rubber buffers,the transmitted dynamic force to the building structure is minimal.Field measurements typically show no measurable increase in adjacent structural vibration

Q3.How does this equipment handle variationsin feed rate or lump size?
A3.The linear motion drive provides consistent conveying velocity even under variable load conditions.For significant feedstock changes,a simple adjustmentof exciter weights can modify stroke amplitude.Optional variable frequency drives(VFD)allow operators totune performance without mechanical changes

Q4.What are typical lead timesfor procurementand delivery?
A4.For standard models within our catalog,fabrication lead time ranges from14to20weeks exworks.Custom engineered solutions may require22to28weeks.Detailed schedules are confirmed upon order placement

Q5.What commercial termsare standard?
A5.Terms are typically FOB manufacturing facilityor CIFto major port.Payment commonly followsa30/70structure(30%with order70%against shipping documents).Extended terms may be available subjectto credit approval

Q6.Is onsite technical support provided during installationand commissioning?
A6.Commissioning supervisionby a factory engineeris includedwith all purchases.This ensures proper mechanical setup electrical connection vibration tuningand operator training Documentation including detailed maintenance manualsand parts listsis provided digitallyandin hardcopy format

Deja tu mensaje

Escribe aquí tu mensaje y envíanoslo

Deja tu mensaje