Chino 500 Tph Gold Mining Washing Plant Private Label Manufacturer
H1: 500 Planta de lavado de minería de oro TPH: Engineered for Maximum Recovery and Uptime
1. Apertura impulsada por PainPoint
Managing a highcapacity gold mining operation presents distinct challenges that directly impact profitability. Para gerentes de planta y contratistas de ingeniería, the pressure to maintain a 500tonperhour throughput often collides with persistent operational hurdles:
Tasas de recuperación inconsistentes: Are fluctuating feed grades and claybound materials causing significant gold losses in your fines, leading to millions in potential revenue left in tailings annually?
Tiempo de inactividad excesivo & Mantenimiento: Does your current scrubbing and screening process suffer from frequent component wear, unscheduled stoppages for cleaning blockages, and high spare parts consumption, costando más 15% in annual operating time?
Agua alta & Consumo de energía: Are your water recycling systems inefficient, and does your plant's power draw per ton processed erode your operational margin, especialmente en sitios remotos?
Escalabilidad & Flexibility Limitations: Can your existing setup adapt to variable ore hardness and feed size without major reconfiguration, or does it force a "onesizefitsall" processing compromise?
LaborIntensive Oversight: Does the plant require constant manual adjustment and monitoring to prevent losses, increasing labor costs and operator error risk?
La pregunta central es: ¿Cómo puedes lograr confiabilidad? 500 TPH throughput while maximizing recovery yield and controlling the total cost of ownership?
2. Descripción general del producto
Este 500 La planta de lavado de minería de oro TPH es una completa, modular processing system designed for alluvial and eluvial gold deposits. Integra un fregado robusto, clasificación precisa, and efficient gravity concentration to liberate and recover fine gold.
Flujo de trabajo operativo:
1. Fregado primario & Disaggregation: Feed material is aggressively scrubbed in a log washer or trommel to break down clay matrices and cemented gravels.
2. Clasificación de tamaño: A vibrating screen deck separates oversized waste rock (+10mm to +75mm, dependiendo de la configuración) from the valuable fine material slurry.
3. Secondary Washing & Concentración: The undersize slurry is routed through a series of sluices, plantillas, or centrifugal concentrators to separate heavy minerals and free gold.
4. Gestión de relaves & Manejo de agua: Waste streams are managed efficiently, with process water clarified in a compact recycling system to minimize fresh water demand.
Ámbito de aplicación: Ideal for largescale alluvial/placer mining operations, river dredging projects, and weathered eluvial deposits. It is engineered for continuous operation in demanding environments.
Limitaciones: This plant is not designed for hard rock (veta) ore processing requiring crushing and chemical leaching circuits. Optimal performance assumes appropriate feed size distribution as per design parameters.
3. Características principales
Modular HeavyDuty Scrubbing Unit | Base técnica: Hightorque shaft with Nihard alloy log paddles | Beneficio operativo: Consistently breaks apart tough clay agglomerates without clogging; reduces feed preparation time by up to 30% | Impacto del retorno de la inversión: Higher availability and consistent feed to recovery units directly boosts overall gold yield.
Tiered Vibrating Screen with Spray Bars | Base técnica: Multideck, highGforce screening with targeted highpressure water injection | Beneficio operativo: Achieves nearcomplete separation of +2mm oversize material with high efficiency; spray bars prevent blinding in sticky conditions | Impacto del retorno de la inversión: Protects downstream concentrators from damage and ensures optimal processing of goldbearing fines.
Integrated Gravity Concentration Circuit | Base técnica: Cascading sluice boxes with optimized riffle design followed by enhanced centrifugal concentrators | Beneficio operativo: Captures fine gold down to 100 malla; allows for staged recovery tuning based on realtime feed grade | Impacto del retorno de la inversión: Field data shows recovery rate improvements of 38% over conventional singlestage setups on comparable ore bodies.
ClosedLoop Water Management System | Base técnica: Compact cyclone units and settling ponds designed for rapid clarification | Beneficio operativo: Recicla hasta 85% de agua de proceso; significantly reduces fresh water intake requirements | Impacto del retorno de la inversión: Lowers water sourcing costs by approximately 70% y minimiza la complejidad de las licencias ambientales.
Control PLC centralizado & Cabina de monitoreo | Base técnica: Industrial programmable logic controller with touchscreen HMI displaying motor loads, tasas de alimentación, and pump statuses | Beneficio operativo: Your operators can monitor the entire plant from one location, permitiendo una respuesta rápida a las anomalías | Impacto del retorno de la inversión: Reduces required walkaround personnel by up to 50% and standardizes operational procedures for less downtime.
AbrasionResistant Material Specification | Base técnica: Critical wear zones lined with AR400 steel or polyurethane composites; slurry pumps fitted with highchrome alloys | Beneficio operativo: Extends service life of components in constant contact with abrasive slurries by a factor of 23x | Impacto del retorno de la inversión: Lowers annual spare parts inventory cost by an estimated 25% y extiende los intervalos de revisión mayores.
4. Ventajas competitivas
| Métrica de rendimiento | Estándar de la industria (500 Planta TPH) | Nuestro 500 Solución de planta de lavado de minería de oro TPH | Ventaja (% Mejora) |
| : | : | : | : |
| Overall Recovery Rate (Oro gratis) | 88% 92% range depending on clay content| Coherente >95% a través de feeds variables| +3% a +7% (Direct revenue increase) |
| Disponibilidad Anual (Tiempo de ejecución programado) | ~8285% (high downtime for maintenance)| >92% (engineered for reliability)| +8% a +10% (More tons processed) |
| Consumo de agua (Cubic Meters per Ton) | ~3.5 4 m³/ton in openloop systems| ~1.0 1.5 m³/ton with closedloop| Arriba a 70% (Reduced sourcing/cost) |
| Tiempo medio entre fallos (Critical Scrubber)| ~1200 horas| >2,500 horas| +108% (Lower maintenance burden) |
| Montaje en sitio & Tiempo de puesta en servicio| 68 weeks with standard modules| <4 weeks with preassembled skids| 33% (Faster timetoproduction) |
5. Especificaciones técnicas
Capacidad de diseño: Nominal 500 toneladas métricas por hora (based on material density of ~1.6 t/m³).
Requisitos de energía: Carga total conectada aproximadamente 850950 kilovatios. Configured for mains grid or heavyduty diesel genset supply.
Especificaciones de materiales: Primary structure carbon steel ST37; critical wear components AR400 steel liners; polyurethane screen panels; highchrome alloy pump volutes.
Dimensiones físicas (Modular):
Scrubbing Module L12m x W4m x H5m
Cribado & Concentration Module L18m x W6m x H7m
Water Recycling Module L10m x W8m x H3m
Control Cabin L6m x W3m x H3m
Rango de operación ambiental: Diseñado para temperaturas ambiente de 20°C a +50°C; componentes eléctricos a prueba de polvo; corrosionresistant coatings standard.
6. Escenarios de aplicación
West African Alluvial Gold Project
Challenge A project faced highly variable clay content causing severe blinding in trommel screens and rapid loss of fine gold (100 malla). Manual cleaning caused daily downtime exceeding two hours.
Solution Implementation of our washing plant featuring the aggressive log washer scrubber tiered screen combination preceded by a grizzly feeder Results Clay disaggregation efficiency reached over % eliminating blinding Scheduled throughput was maintained at TPH consistently Fine gold recovery improved by % as measured against previous production data
Southeast Asian LargeScale River Dredging Operation
Challenge The operator needed scalable mobile processing capacity but struggled with inefficient water usage due local regulations limiting intake High sediment load also damaged pump impellers weekly
Solution Deployment of our modular skidmounted TPH plant including the integrated closedloop water management system Results Freshwater consumption reduced by meeting permit requirements Pump wear life extended from days average Impeller replacement costs fell
South American Eluvial Deposit Processing
Challenge Weathered oxide ore contained fragile gold that was being overground into slimes traditional scrubbers leading significant losses power consumption was excessive older rotary scrubber design
Solution Installation washing plant configured lower RPM attrition scrubber gentler liberation followed enhanced gravity circuit specifically tuned fine flaky gold Results Gold recovery particle size fraction micron increased Power consumption per ton processed dropped due optimized drive systems
Consideraciones comerciales
Pricing tiers are structured based on configuration complexity:
Tier Basic Includes core scrubbing screening primary sluice concentration starting point turnkey installation Tier Advanced Adds centrifugal concentrators enhanced control system closedloop water recycling most common package Tier Premium Fully automated system dual concentration circuits advanced instrumentation remote monitoring capabilities Optional features include mobile skidding frames diesel power generation packages specific tailings thickeners modular crew accommodations Service packages offered Annual Preventive Maintenance Plan includes inspections parts discount Extended Warranty Coverage years critical components Onsite Operator Training Program Financing options available through partner institutions covering equipment leasing project finance structures buildoperatetransfer BOT models tailored largescale developments
Preguntas frecuentes
What is the typical particle size range this plant designed handle The system optimally processes feed material up mm diameter effectively recovers liberated gold particles down microns mesh Is this plant compatible existing crushing circuit Yes can be integrated following primary secondary crushing stage accept crushed ore feed however core design strength lies processing natural alluvial gravels How quickly can product grade concentrate produced The gravity circuit produces upgrade concentrate continuously typically ranging from ratio allowing direct smelting onsite What are key site preparation requirements Level compacted pad adequate drainage provision fresh water source initial fill power supply connection points Total area required approximately square meters What aftersales technical support provided Support includes detailed commissioning supervision comprehensive documentation spare parts recommendation list access hour technical hotline optional longterm service agreements What lead time from order commissioning Standard lead time months exworks expedited options available confirmed order


