Quarry Sites In Lagos Exporter Quotation
1. فتحة مدفوعة بنقطة الألم
Managing a quarry site in Lagos presents distinct operational hurdles that directly impact profitability and project timelines. Are you contending with the high cost and logistical complexity of transporting crushed aggregates across the metropolis? Is inconsistent feed material from your face shovel causing crusher jams and excessive wear on your liners? Are you losing valuable production time to manual sorting and prescreening, while fuel costs for mobile equipment continue to erode your margins? These challenges—escalating transport logistics, unpredictable feed quality, and inefficient material handling—are common constraints on Lagos quarry operations. الحل لا يكمن فقط في المعدات, but in strategic site planning and optimized primary processing. This content addresses how a wellengineered primary quarry plant setup can mitigate these specific issues.
2. نظرة عامة على المنتج
A stationary primary quarry crushing and screening plant is an integrated processing system designed for the initial size reduction and classification of blasted rock at the extraction site. For operations in Lagos, this setup is engineered to handle local granite, الحجر الجيري, and laterite, transforming runofquarry (ROQ) rock into specified aggregate fractions.
سير العمل التشغيلي:
1. التغذية الأولية & الفحص المسبق: Dump trucks deposit ROQ material into a vibrating grizzly feeder (فجفف فجفف), الذي يزيل الغرامات الطبيعية ويتجاوز المواد الفرعية.
2. سحق الابتدائي: Oversize material is conveyed to a robust primary jaw crusher for initial compression breaking.
3. سحق الثانوية & الفحص: Crushed output is routed to a secondary cone crusher for further reduction, then to a multideck vibrating screen for precise classification.
4. التخزين: Sized aggregates (على سبيل المثال, ¾", ½", تراب) are conveyed to designated stockpiles for direct loading or further processing.
نطاق التطبيق & القيود:
نِطَاق: Ideal for mediumtolarge scale quarry operations targeting consistent production of construction aggregates (الجرانيت, الحجر الجيري). Suitable for integration with asphalt or concrete batching plants onsite.
القيود: يتطلب مستقرة, الأرض المعدة للتثبيت. Initial capital investment is significant compared to purely mobile setups. Optimal efficiency is achieved with consistent feed over extended periods, making it less suitable for very small or frequently relocated sites.
3. الميزات الأساسية
وحدة تغذية أشيب اهتزازية شديدة التحمل (فجفف فجفف) | الأساس الفني: آلية اهتزازية عالية القصور الذاتي مع قضبان رمادية قابلة للتعديل | المنفعة التشغيلية: يزيل الغرامات قبل سحق, يقلل من حمل الكسارة وارتداءها, prevents hopper bridging | تأثير عائد الاستثمار: يطيل عمر بطانة الكسارة بنسبة تصل إلى 30%, reduces fuel consumption by optimizing crusher workload
Primary Jaw Crusher with Wedge System | الأساس الفني: Manganese steel jaws with hydraulic adjustment and toggle tensioning | المنفعة التشغيلية: مقابض كبيرة, irregular slabs of Lagos granite without clogging; allows quick CSS adjustment for product size changes | تأثير عائد الاستثمار: يقلل من وقت التوقف عن تغيير الحجم; high reduction ratio decreases load on downstream circuits

التشحيم المركزي & نظام التحكم PLC | الأساس الفني: Automated lubrication points linked to a programmable logic controller with fault diagnostics | المنفعة التشغيلية: Ensures critical bearings receive timely lubrication in dusty conditions; provides operators with realtime monitoring of plant functions | تأثير عائد الاستثمار: يمنع فشل تحمل الكارثية; reduces manual maintenance time by an estimated 15 ساعات في الأسبوع

Modular Conveyor System with Chevron Belting | الأساس الفني: Interlocked conveyor modules with highgrip belting for steep inclines | المنفعة التشغيلية: Efficiently moves material between stages with minimal spillage, even in wet conditions common during Lagos rainy seasons | تأثير عائد الاستثمار: Lowers rehandling costs and preserves site cleanliness; belt design reduces rollback, improving throughput
SoundAttenuated Enclosures & قمع الغبار | الأساس الفني: Canopy panels with acoustic insulation and strategically placed water spray nozzles | المنفعة التشغيلية: Significantly reduces operational noise and dust emissions at transfer points | تأثير عائد الاستثمار: Facilitates compliance with local environmental guidelines, minimizing risk of operational delays due to complaints.
4. المزايا التنافسية
| مقياس الأداء | معيار الصناعة (الوحدات المتنقلة) | Stationary Quarry Plant Solution | ميزة (% تحسين) |
| : | : | : | : |
| Tonnage Processed per Litre of Fuel| ~5060 tonnes/litre (multiple unit movements) | ~90110 tonnes/litre (conveyorbased transfer) | +80% كفاءة |
| اتساق المنتج (تدرج)| Varies due to frequent relocation/ setup changes| Consistent ±5% tolerance on spec aggregates| +70% تناسق |
| Liner Wear Life in Primary Stage| Subject to more direct impact from unscreened fines| Extended life due to effective grizzly prescreening| +30% طول العمر |
| وقت الإعداد/النقل| 12 days per major move| 710 days for initial installation (semipermanent)| 75% mobility but +95% استقرار |
5. المواصفات الفنية
القدرة التصميمية: 150 350 طن في الساعة (configurable based on crusher model).
متطلبات الطاقة الأساسية: 200 400 kVA grid connection or equivalent diesel generator set.
مواصفات المواد: مصنوعة من الفولاذ الهيكلي S355JR; abrasionresistant steel liners at highwear points; Grade III manganese steel crusher jaws.
الأبعاد المادية الرئيسية: Typical footprint of 40m (ل) × 18 م (دبليو). Feed hopper height: 4.5م.
نطاق التشغيل البيئي: مصممة لدرجات الحرارة المحيطة من 20 درجة مئوية إلى 45 درجة مئوية; الرطوبة حتى 90%; تصنيف الحماية من الغبار IP55 على المكونات الكهربائية.
6. سيناريوهات التطبيق
Granite Aggregate Production for Lagos Road Projects | تحدي: A quarry supplying base materials for a major highway experienced trucking bottlenecks and inconsistent product gradation using standalone mobile crushers, leading to rejected loads.| حل: Implementation of a fixed primary quarry plant near the extraction face with integrated screening.| نتائج: Onsite stockpiling eliminated truck queues at the face. Consistent product quality reduced rejection rate from ~12% to under 2%. Projected payback period from transport savings alone was under 24 شهور.
Integrated Concrete Block Making Operation | تحدي: A block manufacturer sourcing crushed stone faced volatile pricing and quality from thirdparty suppliers, disrupting batching formulas.| حل: Establishment of a captive quarry using a compact primary jawandscreen plant dedicated to producing specific aggregate sizes for block mixes.| نتائج: Secured control over raw material cost and supply continuity. حقق أ 25% reduction in aggregate input costs while improving block compressive strength consistency by 15%.
7. الاعتبارات التجارية
طبقات التسعير: Solutions are typically configured projectbyproject.
EntryLevel Setup: Primary jaw crusher with basic screen and conveyors (~$250,000 $400,000).
مصنع الإنتاج القياسي: As described in overview with secondary crusher (~$500,000 $850,000).
HighCapacity/Tertiary Configuration: Includes additional crushing stage for manufactured sand (~$1M+).
الميزات الاختيارية: كبائن تغليف الغبار, automated metal detection/removal systems, advanced rock breaker systems at feed hopper, المراقبة عن بعد عن بعد.
حزم الخدمة: تتوفر عقود صيانة سنوية متدرجة تغطي عمليات الفحص المجدولة, تغييرات الخطوط الملاحية المنتظمة, والدعم الفني ذو الأولوية.
خيارات التمويل: Equipment leasing structures through partnered financial institutions or milestonebased project financing can be explored to align capital expenditure with cash flow from project contracts.
8. التعليمات
س1: Is this plant compatible with our existing excavators and haul trucks?
نعم. The receiving hopper and feeder are engineered to accommodate standard quarry haul truck discharge heights and volumes used in Lagos operations.
Q2: What is the expected impact on our daily operational manpower?
Field data shows that an automated stationary plant typically requires one dedicated loader operator for the feed hopper and one control room operator overseeing the entire circuit—often resulting in a net reduction or redeployment of labor compared to managing multiple mobile units.
س3: How do we handle power instability common in some areas?
Plants can be supplied either for direct grid connection or can be paired with a suitably sized diesel generator package designed for continuous industrial duty cycles.
س 4: What are the commercial terms regarding delivery and commissioning?
Supply terms are typically CIF Apapa Port Incoterms® 2020. Comprehensive commissioning supervision by our engineers is included in the purchase price, encompassing assembly supervision, mechanical alignment checks, test running training your operators.
س5:What is the lead time from order placement until operational commissioning at our Lagos site?
Lead times vary by configuration complexity but generally range between 1422 weeks exworks factory inspection followed by approximately shipping transit time plus two weeks minimum site erection period supervised by our engineers who will remain until final performance tests have been completed successfully together


