Industrial Crushing And Screening Equipment Best Price
1. فتحة مدفوعة بنقطة الألم
تؤدي تكاليف التشغيل المتصاعدة وفترات التوقف غير المتوقعة إلى تآكل ربحية مصنعك? In industrial crushing and screening, common challenges directly impact your bottom line. Excessive wear part consumption leads to frequent, costly replacements and unplanned maintenance windows. Inconsistent feed material causes fluctuating product gradation, resulting in outofspec material and rejected loads. Energyintensive processes consume disproportionate power without corresponding output gains. بالإضافة إلى, frequent clogging and bridging in the circuit halt entire production lines, while complex maintenance procedures keep skilled technicians occupied for hours instead of optimizing throughput.
How do you transition from reactive repairs to predictive, costcontrolled operations? The solution lies in selecting industrial crushing and screening equipment engineered to convert these pain points into measurable efficiency gains.
2. نظرة عامة على المنتج
This product line encompasses heavyduty stationary and semimobile crushing plants and screens designed for hightonnage mineral processing, الإنتاج الكلي, وإعادة تدوير مواد البناء. The operational workflow is engineered for continuous, closedcircuit operation: (1) Primary feed is reduced by a jaw or gyratory crusher. (2) Material is conveyed to a secondary cone or impact crusher for further reduction. (3) Sized material is routed via conveyor to a multideck vibrating screen for classification. (4) Onspec product is diverted to stockpile, while oversize material is recirculated back into the secondary or tertiary crusher.
This equipment is applicable for processing hard rock (الجرانيت, البازلت), الخامات الكاشطة, الحجر الجيري, والخرسانة/الأسفلت المعاد تدويرها. It is not designed for lowvolume, batch processing or for materials with high plasticity or clay content without specific preprocessing.
3. الميزات الأساسية
Modular Chamber Design | الأساس الفني: Interchangeable crushing chamber profiles and eccentric throws. | المنفعة التشغيلية: Enables quick reconfiguration from secondary to tertiary application or between different product shapes without major component changeouts. | تأثير عائد الاستثمار: Reduces capital expenditure for a dedicated tertiary crusher by up to 40% in flexible plant designs.
تعديل Hydroset CSS | الأساس الفني: Hydraulic system for Closed Side Setting (CSS) adjustment under load.| المنفعة التشغيلية: Allows operators to finetune product size in under 60 seconds without stopping production, adapting to changing feed conditions in realtime.| تأثير عائد الاستثمار: Eliminates production stoppages for manual shim adjustments, preserving an estimated 2030 hours of annual uptime per crusher.

Patented Screenbox Motion | الأساس الفني: HighGforce linear or elliptical vibration drive technology tailored to material type.| المنفعة التشغيلية: Prevents blinding and pegging of screen meshes while maintaining high stratification efficiency for accurate sizing.| تأثير عائد الاستثمار: Increases screening efficiency by up to 15%, reducing recirculating load on crushers and lowering energy cost per ton.
Wear Part Monitoring System | الأساس الفني: Embedded sensor technology paired with IoTenabled wear tracking software.| المنفعة التشغيلية: Provides realtime data on liner thickness and predicts optimal changeout times based on actual wear rates, not just hours operated.| تأثير عائد الاستثمار: Maximizes usable wear part life by 1218% on average and allows maintenance scheduling during planned outages, avoiding catastrophic failure.
Direct Drive Crusher Transmission | الأساس الفني: Elimination of Vbelts via direct coupling of motor to crusher drive.| المنفعة التشغيلية: Increases power transmission efficiency by approximately 5%, يقلل من نقاط الصيانة (no belt tensioning), and lowers overall installed footprint.| تأثير عائد الاستثمار: Direct energy savings coupled with reduced spare parts inventory (أحزمة, sheaves) yield a typical payback period under 24 شهور.
4. المزايا التنافسية
| مقياس الأداء | معيار الصناعة | سحق لدينا & حل الفرز | ميزة (% تحسين) |
| : | : | : | : |
| طن لكل كيلوواط ساعة (كفاءة الطاقة) | Measured baseline from legacy equipment surveys. | هندسة الغرفة الأمثل & direct drive systems reduce specific energy consumption. | حتى 812% تحسين |
| تكلفة جزء التآكل لكل طن تمت معالجته | Based on standard manganese steel compositions & profiles. | Proprietary alloy formulations & engineered laminating crushing zones extend service life. | 1525% reduction demonstrated |
| متوسط الوقت بين الفشل (MTBF) – Drives/Screens | Average intervals from industry maintenance reports. | Heavyduty bearing assemblies & balanced mass design reduce stress on components. | 30%+ increase documented |
| دقة الفحص / Fines Yield Control| Standard singlefrequency screen box performance.| Multifrequency capable drives optimize particle travel speed & trajectory per deck.| Fines yield control improved by up to 10% |
5.المواصفات الفنية
نطاق السعة: قابلة للتكوين من 200 الهيدروكربونات النفطية لأكثر من 1,500 TPH primary crushing circuits.
متطلبات الطاقة: Plantwide requirements range from 400 كيلوواط ل 1.5 ميغاواط; supplied for global voltages (380V480V/5060Hz). Crusher motors typically 200450 kW each.
مواصفات المواد: Fabricated from hightensile steel plate; Crusher liners available in multiple grades of manganese steel (14%22%) or optional chromewhite iron alloys; Screen decks in hardened steel wire mesh or polyurethane panels.
الأبعاد المادية (Sample Primary Unit): Feed hopper: ~12m³; Crusher itself: L~5m x W~3m x H~4m; Total station footprint including feeders: ~25m x 15m.
نطاق التشغيل البيئي: مصمم لدرجات الحرارة المحيطة من 25 درجة مئوية إلى +45 درجة مئوية; dustsealed bearings and drives; sounddampened enclosures available to meet <85 ديسيبل(أ) في محطات المشغل.
6\. سيناريوهات التطبيق
[Aggregate Producer – Granite Quarry]
تحدي: A quarry faced inconsistent cubicity in final aggregate products due to fluctuating rock strata hardness, leading to poor compaction rates reported by road construction clients.
حل: Implementation of a cone crusher with automated Hydroset system and an advanced multideck screen within their closed circuit.
نتائج: Realtime CSS adjustment stabilized product shape (% تكعيبية). Field data shows a consistent improvement of over 22% in flakiness index, eliminating product rejection and allowing a premium product price point.
[مصنع معالجة خام الحديد]
تحدي: Extreme abrasiveness of ore resulted in unsustainably high wear part costs in secondary crushing stages (850 hours—a ~40% increase—and monitoring enabled justintime changes during shift breaks.This reduced annual planned downtime related to liner changes by approximately 120 ساعات.
7\. الاعتبارات التجارية
Industrial crushing and screening equipment pricing is tiered based on capacity throughput:
الطبقة الأولى (1000 الهيدروكربونات النفطية في الساعة): Fully customengineered systems with process simulation integration.
Optional features include advanced dust suppression systems fully integrated with water recycling plants,tiremounted mobile crawler systems,and centralized automated lubrication systems.Service packages are structured as Bronze (parts only), Silver (أجزاء + scheduled maintenance),and Gold (fullsite service agreement including condition monitoring data analysis).Financing options include capital lease agreements tailoredto align payments with projected production revenue increases,and operating leases that include full service coverage.
8\. التعليمات
س1: Is your equipment compatible with our existing conveyor infrastructure?
أ1: Our engineering team conducts presale audits.Crushers,شاشات,and feeders can be interfaced with existing conveyors provided load capacities match.We supply necessary transition chutes,support structures,and control system interfaces as part of the scope.
Q2:ما هو مستوى الاضطراب التشغيلي الذي يجب أن نتوقعه أثناء التثبيت؟?
A2:A detailed Site Implementation Plan minimizes disruption.For greenfield sites,there is no impact.For brownfield retrofits,a phased approach typically allows partial plant operation.Field data indicates full integration can be completed within a preagreed shutdown window of1421 daysfor most mediumcomplexity circuits
س3:ما هي الشروط التجارية المتعلقة بالضمان?
A3:The standard warranty covers defects in materials/workmanshipfor12 monthsfrom commissioning.Extended structural warranties(upto60 monthson main frames)and performance guarantees(on throughputand power draw)are available subjectto agreed feed specifications
س 4:What operator trainingis provided?
A4:A comprehensive program includes classroom instructionon principlesof operation,إجراءات السلامة,واستكشاف الأخطاء وإصلاحها الأساسية,followedby handson trainingat your site during commissioning.This typically spans5 daysfor lead operatorsand maintenance supervisors
س5:What ongoing technical supportis available postpurchase?
A5:Dedicated technical supportis accessible24/7via phoneor our customer portal.Regional service engineers provide onsite support.Access todetailed parts manuals,schematic diagrams,and recommended spare parts listsis provided digitally at commissioning


