Gold Ore Crushing Equipment Sourcing Agent Factory Price
Targeted Solutions for Gold Ore Crushing: Maximize Recovery, Minimize Downtime
Are you facing persistent bottlenecks in your gold processing circuit that erode profitability? The primary crushing stage sets the tone for your entire recovery operation. وتشمل التحديات المشتركة:
تكاليف التآكل العالية: Quartz and other hard gangue minerals rapidly wear crusher components, leading to frequent liner changes, excessive maintenance labor, and soaring spare parts inventories.
التوقف غير المقرر: Equipment failure at the primary stage halts the entire milling circuit. Every hour of lost production can represent tens of thousands in unrealized gold yield.
Inefficient Liberation: Inconsistent feed size from poor crushing creates a bottleneck for grinding mills, reducing throughput and increasing specific energy consumption per ton.
كثافة الطاقة العالية: Older crushing technology often operates at fixed, inefficient rates, drawing maximum power regardless of feed conditions or required product size.
كيف تختار أ معدات سحق خام الذهب solution that directly addresses these operational costs while safeguarding your plant’s availability and recovery metrics?
نظرة عامة على المنتج: HeavyDuty Primary Jaw Crusher for Gold Ore Processing
لدينا هندسيا معدات سحق خام الذهب is built around a robust, singletoggle jaw crusher design optimized for highabrasion gold ore applications. The operational workflow is streamlined for reliability:
1. يٌطعم & الفحص المسبق: RunofMine (ذاكرة للقراءة فقط) ore is directed to a grizzly feeder, removing fines to bypass the crusher and reduce wear.
2. التخفيض الأولي: The core jaw crusher utilizes a highstrength manganese steel jaw plate to apply compressive force, breaking large ore pieces (ما يصل إلى 1200 ملم) into a consistent, حجم يمكن التحكم فيه.
3. تسريح & نقل: Crushed product is discharged onto a conveyor system at a controlled rate for transport to secondary crushing or stockpiling.
نطاق التطبيق: Ideal for stationary or semimobile primary crushing stations processing hard rock gold ores with high silica content (على سبيل المثال, quartz veins). القيود: Not designed as a standalone solution for complete comminution; requires integration with secondary/tertiary crushing and grinding circuits for full liberation.
الميزات الأساسية: Engineered for Durability and Control
ملكنا معدات سحق خام الذهب incorporates features designed with plant managers' key priorities in mind.
Asymmetric Jaw Design | الأساس الفني: الحركية الأمثل & higher stroke at the feed opening | المنفعة التشغيلية: Increases capacity by up to 15% versus traditional designs and actively draws material into the crushing chamber, reducing bridging. | تأثير عائد الاستثمار: Higher throughput per capital dollar invested and less operator intervention required.
Hydraulic Toggle System | الأساس الفني: Replaces traditional mechanical toggle plates with a hydraulic cylinder | المنفعة التشغيلية: Provides automatic tramp iron release and clearing of stalled chambers in under two minutes without manual disassembly. Allows quick adjustment of the closedside setting (CSS) for product size control. | تأثير عائد الاستثمار: Prevents catastrophic damage from uncrushables, drastically reducing risk of major repair costs and associated production losses.
Modular Liner Assembly | الأساس الفني: Segmented, reversible jaw plates secured with wedgelock systems | المنفعة التشغيلية: يقلل وقت تغيير الخطوط الملاحية المنتظمة بنسبة تصل إلى 50%. Reversible design doubles liner life by allowing rotation of highwear sections. | تأثير عائد الاستثمار: Lowers maintenance labor costs and increases crusher availability by minimizing downtime for wear part replacement.
PLCAutomated Drive & يتحكم | الأساس الفني: محرك التردد المتغير (VFD) coupled with programmable logic controllers | المنفعة التشغيلية: Enables soft starts to reduce mechanical stress and allows operators to finetune crusher speed and performance based on realtime feed conditions. | تأثير عائد الاستثمار: Reduces peak power demand (lowering utility costs) and optimizes energy use per ton crushed.
Reinforced Frame & Pitman Assembly | الأساس الفني: تحليل العناصر المحدودة (الهيئة الاتحادية للبيئة)designed cast steel or fabricated frame with oversized bearings | المنفعة التشغيلية: Provides exceptional structural integrity to withstand continuous highcycle loading from hard rock ores. Minimizes stress fractures and bearing failures. | تأثير عائد الاستثمار: Extends major component service life, protecting your longterm capital asset.
المزايا التنافسية: Quantifiable Performance Gains
Field data from comparable installations demonstrates clear improvements over standard industry offerings.
| مقياس الأداء | خط الأساس القياسي للصناعة | Our Gold Ore Crushing Solution | ميزة موثقة |
| : | : | : | : |
| حياة الخطوط الملاحية المنتظمة (خام جلخ) | 450,000 550,000 MT | 600,000 750,000 MT | +25% ل +30% تحسين |
| متوسط الوقت بين الفشل (MTBF) | ~1,200 hours | ~1,800 hours | +50% تحسين |
| Tramp Iron Clearance Time | 48 ساعات (يدوي) | 95% time reduction |
| استهلاك الطاقة للطن الواحد| 100% baseline kWh/t| ~9092% baseline kWh/t| 810% تخفيض |
| القدرة الإنتاجية| 100% baseline tph| 110115% baseline tph| 1015% increase |
_With optimized VFD control strategy._ _For equivalent feed size and closedside setting._
المواصفات الفنية
نطاق السعة: تعتمد على النموذج, من 350 لأكثر من 2,000 طن في الساعة (tph).
فتح الأعلاف: Up to 1200mm x 1500mm to accept large ROM gold ore.
متطلبات الطاقة: Electric motor drive from 150 كيلوواط ل 400 كيلوواط; configured for minegrade voltage (على سبيل المثال, 1000V/3300V/6000V).
مواصفات المواد: Main frame – Highstrength welded steel or cast alloy. Jaw plates – Premium Manganese Steel (14%18%). Eccentric shaft – Forged alloy steel with precision machining.
الأبعاد المادية: يختلف حسب الموديل; designs account for transport constraints and facilitate installation within existing plant footprints.
نطاق التشغيل البيئي: مصمم لدرجات الحرارة المحيطة من 20 درجة مئوية إلى +45 درجة مئوية. Dust sealing kits available for arid environments; corrosionresistant coatings specified for humid/saline conditions.
سيناريوهات التطبيق
Hard Rock Underground Mine Expansion
تحدي: An existing underground operation expanding its mill throughput was constrained by an aging primary crusher causing weekly unplanned stoppages and inconsistent feed to the SAG mill.
حل: Installation of our heavyduty jaw crusher as the new primary station, integrated with an automated rock breaker system at the dump pocket.
نتائج: Primary circuit availability increased from 82% ل 96%. Consistent crusher product size contributed to a measured 5% increase in SAG mill throughput due to improved grindability.
Alluvial/Heap Leach Operation Upgrading
تحدي: A heap leach operation processing transitional oxide/sulfide ore experienced excessive wear costs from using a standard impactor not suited for increasingly abrasive deeperlevel ore.
حل: Replacement with our purposebuilt gold ore jaw crusher featuring modular liners and hydraulic toggle adjustment.
نتائج: Liner replacement frequency decreased from every 8 أسابيع لكل 14 أسابيع. The ability to quickly adjust CSS allowed optimization of crush size for optimal agglomeration and leach kinetics.
الاعتبارات التجارية
We structure commercial terms focused on total cost of ownership.
طبقات التسعير: Offered across three valueengineered tiers:
واجب قياسي: For consistent oxide ores with moderate abrasion.
واجب ثقيل: Recommended standard for mixed/hard rock sulfide ores; includes core features like hydraulic toggle.
Extreme Duty: For operations with highly abrasive feed or severe service cycles; includes upgraded materials throughout.
الميزات الاختيارية & الحزم:
Automated Lubrication Systems
Advanced Condition Monitoring Sensors (اهتزاز, درجة حرارة)
360° Maintenance Platform Package
Dust Suppression Integration Kits
حزم الخدمة: Choose from annual inspection plans through comprehensive performance contracts covering parts supply onsite technical support.
الأسئلة المتداولة
1. Is this equipment compatible with my existing secondary cone crushers or SAG mill feed conveyor?
نعم. Our engineering team will review your current plant layout and specifications. Crushers are designed with discharge heights belt widths that can be adapted interface with most downstream equipment ensuring minimal integration complexity.
2. What is the expected impact on my overall plant maintenance schedule?
Implementation typically reduces unplanned maintenance events in the primary stage by over half Planned liner changes become faster more predictable allowing you schedule them during planned plant shutdowns without extending downtime
3. How does financing work?
We work established industrial financing partners offer flexible options including straight capital purchase leasetoown agreements operating leases based on tonnes crushed This allows alignment equipment cost production revenue
4 What are lead times delivery?
Lead times vary model specification Standard configurations typically available within months Customized solutions may require longer We provide detailed project timelines upon specification finalization


