Gold Ore Crushing Equipment Datasheet
Here is the SEOoptimized landing page content for the keyword Gold Ore Crushing Equipment Datasheet, structured for B2B buyers.
The Cost of Inefficient Gold Ore Comminution: Are You Losing 1520% of Your Recovery Potential?
Every plant manager knows the bottleneck: if your primary crushing circuit fails to deliver a consistent, properly liberated feed, downstream grinding and leaching efficiency collapses. Industry data indicates that poorly matched crushing equipment can increase operating costs by $0.50 ل $1.20 للطن الواحد due to excessive recirculation loads, premature liner wear, and downstream mill overgrinding. Are you facing excessive downtime from jaw crusher jams on highclay ores? Is your cone crusher producing too many fines, blinding your screens and increasing cyanide consumption? The solution lies in selecting equipment designed specifically for the abrasive, highcompressivestrength nature of goldbearing rock.
نظرة عامة على المنتج: The Gold Ore Primary & Secondary Crushing System
This datasheet covers a وحدات, heavyduty jaw and cone crushing circuit engineered for gold ore feed sizes up to 600mm, targeting a final product of 80% passing 1219mm for optimal SAG or ball mill feed. The workflow is designed for high availability in remote, highaltitude operations.
سير العمل التشغيلي:
1. قادوس التغذية & أشيب: Scalps 150mm fines to bypass the primary crusher, reducing wear.
2. سحق الفك الابتدائي: Highstroke, deepchamber jaw reduces ore from 600mm to 150mm.
3. Surge Bin & المغذية الاهتزازية: Regulates feed rate to the secondary cone crusher.
4. سحق المخروط الثانوي: Hydrosetcontrolled, medium chamber cone reduces material to 1219mm.
5. فحص الدائرة المغلقة: يتم إعادة تدوير المواد كبيرة الحجم إلى الكسارة المخروطية.
نطاق التطبيق: Ideal for hard rock gold (عروق الكوارتز, greenstone belts) with compressive strengths up to 350 MPa. القيود: Not recommended for highclay (>15%) saprolite ores without a dedicated scrubber circuit; throughput drops significantly with excessive moisture.
الميزات الأساسية
HeavyDuty Deep Chamber Jaw | الأساس الفني: Increased nip angle & toggle plate geometry | المنفعة التشغيلية: Handles slabby, hard gold ore without stalling; reduces bridging incidents by 40% | تأثير عائد الاستثمار: Lower unscheduled downtime; estimated savings of $8,000 per hour of lost production.
Hydroset Cone Adjustment System | الأساس الفني: Hydraulic overload protection & automated closedside setting (CSS) تعديل | المنفعة التشغيلية: Instant clearing of tramp iron; CSS can be adjusted remotely in under 2 دقائق | تأثير عائد الاستثمار: Eliminates manual liner changes for different ore types; reduces recirculation load by 15%.
HighStrength Manganese Liners (18% من, 2% كر) | الأساس الفني: تصلب الصلب المنغنيز الأوستنيتي | المنفعة التشغيلية: Resists gouging abrasion from quartz; liner life averages 8,00012,000 hours in gold ore | تأثير عائد الاستثمار: Reduces annual wear parts cost by 22% compared to standard 14% Mn liners.
Modular SkidMounted Frame | الأساس الفني: Structural steel Ibeam base with vibration dampeners | المنفعة التشغيلية: Reduces concrete foundation costs by 60%; allows rapid relocation within the pit | تأثير عائد الاستثمار: Shortens project payback period by 46 months for mobile operations.
محرك التردد المتغير (VFD) on Feed Conveyor | الأساس الفني: Torque control & loadsensing logic | المنفعة التشغيلية: Automatically reduces feed rate when crusher amp draw spikes; prevents choke feeding | تأثير عائد الاستثمار: Protects motor windings; reduces energy consumption per ton by 812%.
نظام رش قمع الغبار | الأساس الفني: Water misting at transfer points & تفريغ كسارة | المنفعة التشغيلية: Controls respirable silica dust to <0.05 ملجم/م3 | تأثير عائد الاستثمار: Avoids OSHA/MSHA fines; reduces water consumption by 30% مقابل. standard sprays.
المزايا التنافسية
| مقياس الأداء | معيار الصناعة (200 HP Cone) | Gold Ore Crushing Solution (200 HP Cone) | ميزة (% تحسين) |
| : | : | : | : |
| الإنتاجية (tph) | 180220 tph | 240280 tph | +27% |
| نسبة التخفيض (ثانوي) | 4:1 | 5.5:1 | +37% |
| Liner Wear Rate (lbs/ton) | 0.045 lbs/ton | 0.032 lbs/ton | 29% |
| استهلاك الطاقة (كيلووات ساعة/طن) | 1.8 كيلووات ساعة/طن | 1.4 كيلووات ساعة/طن | 22% |
| متوسط الوقت بين الفشل (MTBF) | 1,200 ساعات | 1,800 ساعات | +50% |
المواصفات الفنية

| المعلمة | مواصفة |
| : | : |
| نموذج | GOC1200 (الفك الابتدائي) / GOC400 (المخروط الثانوي) |
| فتح الأعلاف (فك) | 1200مم × 900 مم |
| الحد الأقصى لحجم التغذية (مخروط) | 200مم |
| نطاق السعة | 200 350 طن متري في الساعة (اعتمادا على CSS) |
| متطلبات الطاقة | 160 كيلوواط (فك) / 200 كيلوواط (مخروط) @ 660V, 3مرحلة, 50/60 هرتز |
| مواصفات المواد | الإطار الرئيسي: أستم A36; رمح: 4340 سبائك الصلب مزورة; بطانات: ASTM A128 الصف C |
| الأبعاد المادية (كسارة فقط) | فك: 3.2m L x 2.1m W x 2.8m H; مخروط: 2.5m L x 2.0m W x 2.5m H |
| الوزن الإجمالي (كسارة فقط) | فك: 42,000 كجم; مخروط: 28,000 كجم |
| نطاق التشغيل البيئي | 20درجة مئوية إلى +50 درجة مئوية; Altitude up to 4,500m (with derating) |
سيناريوهات التطبيق

HighAltitude Underground Gold Mine (Andes Region)
تحدي: A mine at 4,200m needed to reduce haulage costs by precrushing ore underground. Space was limited, and ambient oxygen levels were low.
حل: Installed a compact, VFDdriven GOC400 cone crusher on a lowprofile skid. The Hydroset system allowed remote CSS adjustment from the surface control room.
نتائج: Reduced skip hoisting cycle time by 18%. Eliminated manual liner adjustments in lowoxygen environment. تم تحقيقه 98% توافر أكثر 12 شهور.
OpenPit Oxide/Gold Transition Ore (غرب أفريقيا)
تحدي: The ore body contained variable clay content (512%) causing severe blinding of the primary jaw crusher and feeder.
حل: Implemented the GOC1200 jaw with a heavyduty grizzly feeder (spacing 150mm) and a bypass conveyor. The deep chamber design handled the sticky material without packing.
نتائج: مستبعد 3 weekly blockages. زادت الإنتاجية من 180 tph إلى 260 tph. Screen deck life on the secondary circuit increased by 40% due to reduced fines generation.
Greenfield Gold Project (كندا)
تحدي: Required a mobile, relocatable crushing circuit to follow the pit development. Capital budget was constrained.
حل: Deployed the full modular skid system (فك, مخروط, شاشة) on concrete pads. No permanent foundations were required.
نتائج: First ore crushed 6 weeks ahead of schedule. Relocation cost was $45,000 مقابل. $250,000 for a fixed plant. Achieved target P80 of 14mm consistently.
الاعتبارات التجارية
مستويات تسعير المعدات (ميناء فوب):
- الحزمة القياسية (GOC1200 Jaw + GOC400 Cone): $480,000 $620,000 (includes standard manganese liners, لوحة التحكم الأساسية).
- الحزمة المميزة: $680,000 $850,000 (includes premium 18% Mn liners, VFDs, remote monitoring package, قمع الغبار).
- مصنع وحدات تسليم المفتاح: $1.2M $1.8M (includes all conveyors, شاشات, electrical room, ودعم التكليف).
- Automated Lube System: $18,000 (extends bearing life in dusty environments).
- HighAltitude Motor Package: $12,000 (derated for >3,500م).
- ارتداء أجهزة الاستشعار الرصد: $8,500 (تنبيهات الصيانة التنبؤية).
- أساسي (1 سنة): 2 site inspections, دعم الهاتف, 10% discount on wear parts.
- شامل (3 سنين): 4 site inspections, التشخيص عن بعد, guaranteed 48hour parts delivery, liner changeout training.
- LeasetoOwn: 3660 month terms with 10% buyout.
- Deferred Payment: 90day payment holiday for firsttime buyers.
- PerformanceBased: Payment tied to throughput guarantees (على سبيل المثال, $/طن معالجتها).
الميزات الاختيارية:
حزم الخدمة:
خيارات التمويل:
التعليمات
1. Can this equipment handle highsilica gold ore (كوارتز) دون ارتداء المفرط?
نعم. The standard liners are 18% manganese with 2% الكروم, specifically formulated for highsilica content. تظهر البيانات الميدانية أ 30% improvement in wear life over standard 14% Mn liners in quartzrich ore.
2. What is the minimum power requirement for the GOC400 cone crusher?
The crusher requires a minimum of 200 كيلوواط. لكن, for optimal performance and to prevent motor stalling under full load, we recommend a 250 kW motor with a VFD. Operating below 200 kW will reduce throughput by approximately 15%.
3. How does the Hydroset system handle tramp iron?
The system monitors hydraulic pressure. If a noncrushable object (على سبيل المثال, drill bit) يدخل الغرفة, pressure spikes. The Hydroset valve opens instantly, dropping the main shaft to clear the object. The system resets automatically within 10 ثواني.
4. What is the typical lead time for a standard package?
Current lead time is 1418 أسابيع من تأكيد الطلب. وهذا يشمل التصنيع, اختبار المصنع, and crating for ocean freight. Premium packages may add 24 weeks for the remote monitoring system.
5. Can this circuit be integrated with an existing SAG mill?
نعم. The target product size (P80 of 1219mm) is standard feed for most SAG mills. We provide a data sheet for the conveyor discharge chute to match your existing mill feed bin. A surge bin with a capacity of 50100 tons is recommended.
6. What is the warranty on the main frame and shaft?
The main frame and eccentric shaft carry a 5year warranty against manufacturing defects. ارتداء أجزاء (بطانات, لوحات الخد) are excluded. The hydraulic system components carry a 2year warranty.
7. هل توفر تدريب المشغلين?
نعم. We offer a 3day onsite training program covering startup procedures, تعديل CSS, liner changeout safety, and troubleshooting common issues like choke feeding and belt slippage. This is included in the Comprehensive Service Package.


