اختبار تعدين الذهب من مطحنة الطوابع
1. فتحة مدفوعة بنقطة الألم
Are you facing persistent bottlenecks in your gold processing circuit due to unreliable or inefficient comminution? The challenges of pilotscale testing and process validation for gold recovery are welldocumented. Inconsistent or inaccurate results from your export stamp mill gold mining testing can lead to costly downstream errors, مشتمل:
سوء تخصيص رأس المال: Scaling up a process based on flawed liberation data risks millions in underperforming plant equipment.
Recovery Uncertainty: Without precise grind size control and reliable discharge simulation, predicting actual gold recovery and grade is guesswork.
التوقف التشغيلي: Testing delays or equipment failure directly postpone project timelines and revenue generation.
تكاليف تشغيل عالية: غير فعال, manuallyintensive test milling consumes excessive labor, قوة, and sample material.
How can you obtain definitive, scalable data to derisk your gold project investment? The answer lies in moving beyond antiquated methods to engineered, precision testing equipment designed for the specific demands of gold ore characterization.
2. نظرة عامة على المنتج
This product line comprises engineered, وحدات export stamp mill gold mining testing وحدات. These are not replicas of historical production stamps but are precisiondesigned batch mills that simulate the mechanical crushing and grinding action of a traditional stamp battery for the explicit purpose of metallurgical testing and process flowsheet development.
سير العمل التشغيلي:
1. تحضير العينة: A calibrated mass of crushed ore feed (عادة 6 ملم) is loaded into the mortar box.
2. الطحن الدقيق: Programmable camshafts lift and drop weighted stamps onto the ore bed with controlled frequency and force, achieving targeted particle size reduction.
3. التفريغ الخاضع للرقابة & مجموعة: The ground pulp is discharged through an interchangeable screen grate, simulating a closedside setting, and collected for washing and concentration.
4. تحليل: The resulting product is analyzed for grind size (ص80), mineral liberation, and subjected to gravity concentration or cyanidation tests to establish recovery parameters.
نطاق التطبيق & القيود:
نِطَاق: مثالية لطحن خامات الذهب مجانا, sulphideassociated gold ores requiring gravityrecoverable gold (GRG) testwork, pilot plant feed preparation, and calibration of comminution models. Essential for feasibility studies where traditional stamp mill performance data is required.
القيود: Not designed for continuous production or hightonnage processing. Less effective for purely refractory ores requiring ultrafine grinding without supplementary equipment.
3. الميزات الأساسية
الإطار المعياري & صندوق الهاون | الأساس الفني: Bolttogether highcarbon steel construction with replaceable wear liners | المنفعة التشغيلية: Enables rapid assembly/disassembly for export shipping and easy liner replacement infield, minimizing logistics cost and maintenance downtime | تأثير عائد الاستثمار: Reduces international freight volume by up to 40% versus welded units; extends service life by allowing localized wear management.
Programmable Camshaft Control | الأساس الفني: محرك التردد المتغير (VFD) with digital stroke counter and timer | المنفعة التشغيلية: Your operators can precisely replicate specific energy input (كيلووات ساعة/طن) and simulate different drop rates/forces critical for test consistency | تأثير عائد الاستثمار: Eliminates test variability; one standardized test protocol can reliably scale to full plant design, preventing over or underengineering.

Interchangeable Discharge Grates | الأساس الفني: Hardened steel grates manufactured to precise slot dimensions | المنفعة التشغيلية: Allows simulation of different closedside settings to generate product size curves essential for gravity circuit optimization | تأثير عائد الاستثمار: Provides definitive data for screen/classifier selection in the final plant, optimizing initial recovery stages.
نظام متكامل لمنع الغبار | الأساس الفني: Sealed mortar box with water injection ports and slurry containment skirts | المنفعة التشغيلية: Contains silica dust during dry milling phases and controls slurry splash, protecting operator health and ensuring sample integrity | تأثير عائد الاستثمار: Mitigates regulatory compliance risk in test facilities; prevents valuable sample loss.
Calibrated Stamp Weights | الأساس الفني: Machined cast iron weights with certified mass tolerances (±0.5%) | المنفعة التشغيلية: Delivers consistent kinetic energy per blow, ensuring repeatable breakage forces across all tests | تأثير عائد الاستثمار: Builds confidence in test data from internal teams and external financiers during due diligence.
4. المزايا التنافسية
| مقياس الأداء | معيار الصناعة (Basic Test Mills) | Our Export Stamp Mill Gold Mining Testing Solution | ميزة (% تحسين) |
| : | : | : | : |
| تكرار نتيجة الاختبار (التباين P80) | ±15% due to manual operation & يرتدي | ±5% via programmable control & calibrated weights | 66% أكثر اتساقا |
| Sample Throughput per 8hr Shift | 34 batches (manual feeding/cleaning) | 68 batches (optimized feed/discharge) | 100% يزيد |
| Wear Liner Replacement Time | 46 ساعات (weldedinplace) | <1 ساعة (بولتين وحدات) | 80% تخفيض |
| Specific Energy Consumption Accuracy| Estimated calculation from averages| Direct measurement via integrated kWh meter & خلايا الحمل| Data Accuracy within ±3% |
5. المواصفات الفنية
القدرة/التقييم: Batch size from 5kg to 50kg per charge; configurable for standard Davis tube or Knelson concentrator feed requirements.
متطلبات الطاقة: 7.5 كيلوواط / 10 محرك كهربائي HP; compatible with 415V/50Hz or 460V/60Hz threephase power. يتضمن VFD.
مواصفات المواد: Frame ASTM A36 steel; Mortar Box liners AR400 or optional chromium carbide overlay; Stamps forged highcarbon steel with tungsten carbide tips (خياري).
الأبعاد المادية (Assembled): ~2.5m L x 1.8m W x 2.2m H. Exportcrated dimensions optimized for 20ft container.
نطاق التشغيل البيئي: Designed for laboratory or sheltered outdoor installation. نطاق درجة حرارة التشغيل: 5درجة مئوية إلى 45 درجة مئوية.
6. سيناريوهات التطبيق
Alluvial/Eluvial Gold Project Feasibility Study
تحدي: A West African project needed reliable GRG data from clayrich saprolite ore but standard bond mill work provided poor simulation of potential coarse gold recovery in a planned gravity circuit.
حل: Implementation of a twostamp testing unit with interchangeable grates set at 1mm and 2mm.
نتائج: Testing identified +95% GRG recovery at a coarse P80 of 1.2mm, enabling client to specify a simpler, lowercapital crushinggravity circuit instead of full leaching plant.
Historic Mine Tailings Retreatment Scoping
تحدي: An engineering contractor required representative milling of composite tailings samples to validate cyanide leach extraction rates without overgrinding already fine material.
حل: Use of a lowfrequency, singlestamp test mill configuration for gentle attritioning and liberation refreshment.
نتائج: Achieved target liberation with minimal slimes generation; leach tests confirmed economically viable extraction rates, derisking the project for investors.
7. الاعتبارات التجارية
طبقات التسعير: Base unit configurations start at the entrylevel for standard batch sizes. Premium tiers include advanced instrumentation packages (automated sampling, realtime power monitoring).
الميزات الاختيارية: Tungsten carbide stamp shoes; secondary containment trays; مجموعات قطع الغيار; OEMcertified installation & commissioning supervision.
حزم الخدمة: Annual inspection contracts remote technical support access extended warranty plans covering frame integrity
Financing Options Available through partner institutions including equipment leasing structures tailored for project development companies
8.التعليمات
Q1 How does this testing unit correlate results to a fullscale operational stamp mill?
A1 By controlling key variables—stamp mass drop height frequency discharge grate aperture—the unit applies fundamental comminution mechanics that scale using established energysize reduction relationships Field calibration data from multiple projects supports this correlation
Q2 What training is required for our laboratory technicians?
A2 Comprehensive operational manuals video guides are provided We recommend a halfday familiarization session typically conducted during commissioning
Q3 Can the unit process hard rock quartz vein samples as effectively as softer oxidized ores?
A3 Yes The programmable drive allows adjustment of impact force number of blows per sample to accommodate a wide range ore competencies from soft saprolite to competent quartz
Q4 What is the typical lead time from order placement commissioning?
A4 For standard configurations lead time is XY weeks excluding international shipping Expedited manufacturing options are available
Q5 How does your company support maintenance parts supply globally?
A5 We maintain strategic parts inventories on three continents Critical wear components like liner plates grate screens are stocked for express shipment
Q6 Are test results from your equipment accepted by major financial institutions for feasibility study reporting?
A6 Yes Our export stamp mill gold mining testing units are recognized by leading independent metallurgical laboratories their data is routinely included in bankable documents compliant with JORC NI 101 reporting standards
Q7 Can the unit be adapted later if our testing needs change?
A7 The modular design allows future upgrades such as adding more stamps integrating automated feed systems retrofitting newer control panels protecting your initial investment


