500 Tph Gold Mining Washing Plant ODM Manufacturer Cost
1. فتحة مدفوعة بنقطة الألم
Are you scaling up your alluvial or eluvial gold operation and facing the critical bottlenecks of highvolume material processing? A standard 500 TPH gold mining washing plant is a significant capital investment, yet many operations struggle with hidden costs that erode profitability. وتشمل التحديات المشتركة:
فترة توقف عالية للصيانة: Frequent clogging in scrubbers or screens halts the entire processing line, تكلف الآلاف في الساعة من الإنتاج المفقود.
معدلات الاسترداد غير متناسقة: Variable feed material can overwhelm traditional trommels and sluices, leading to fine gold loss that directly impacts revenue.
Excessive Water & استهلاك الطاقة: Inefficient pump systems and plant design lead to unsustainable operational expenses, especially in remote sites.
Rapid Component Wear: Abrasive clays and gravel degrade standard liners and screens quickly, increasing part replacement frequency and labor costs.
Difficulty in Achieving SteadyState Operation: Balancing feed rate, scrubbing efficiency, and gold concentration across a 500 TPH system is complex, often resulting in suboptimal throughput.
How do you ensure your major equipment investment delivers not just capacity, but reliable, costeffective ounces? The solution lies in an engineered approach focused on durability, recovery optimization, والتكلفة الإجمالية للملكية.
2. نظرة عامة على المنتج
هذا 500 TPH mobile or modular gold mining washing plant is a complete gravity separation system designed for highvolume placer, الغرينية, and eluvial deposits. It integrates robust scrubbing, precise classification, and efficient concentration into a continuous process flow.
سير العمل التشغيلي:
1. التغذية الأولية & الفرك: Runofmine material is fed via hopper or conveyor into a heavyduty rotating scrubber, thoroughly breaking down clay agglomerates and liberating gold.
2. Material Classification: The discharged slurry is processed by a vibrating screen deck to separate oversize waste rock (+10mm to +75mm depending on deposit) from the valuable fines.
3. Fine Material Concentration: The undersize slurry containing gold reports to a series of enhanced gravity concentrators (such as centrifugal concentrators or pulsating sluices) for primary recovery.
4. إدارة المخلفات & Water Handling: Waste streams are directed to a settling system or dewatering unit for water reclamation, critical for environmental compliance and reducing fresh water intake.
نطاق التطبيق & القيود:
مثالية ل: Largescale alluvial operations, riverine deposits, weathered eluvial zones with high clay content, and gravel pit reconcentration projects.
القيود: غير مناسب للصخور الصلبة (عرق) mining without prior crushing. Optimal performance requires adequate water supply (though recirculation systems minimize this). Feed material size typically limited to less than 250mm.
3. الميزات الأساسية
وحدة الغسيل الثقيلة | الأساس الفني: Hightorque drum drive with internal lifters | المنفعة التشغيلية: Ensures complete disaggregation of tough claybound feeds without clogging, maintaining consistent 500 TPH throughput | تأثير عائد الاستثمار: Reduces feedrelated downtime by up to 70%, تعظيم الاستفادة من النبات.
Modular Vibrating Screen Deck | الأساس الفني: Multistage polyurethane screen panels with highGforce vibration | المنفعة التشغيلية: Provides accurate sizing separation even with high moisture content, protecting downstream concentrators from overload | تأثير عائد الاستثمار: Extends screen panel life by 40% compared to rubber panels and improves overall recovery stability.
Optimized Pumping System | الأساس الفني: Hydraulically sized slurry pumps with wearresistant liners | المنفعة التشغيلية: Maintains designed flow rates with lower required horsepower through reduced system head loss | تأثير عائد الاستثمار: Cuts power consumption for material movement by an estimated 1525% سنويا.
Primary Gravity Concentration Array | الأساس الفني: Parallel configured centrifugal concentrators with automated concentrate bowl discharge | المنفعة التشغيلية: Delivers high recovery rates on both fine and coarse gold across fluctuating feed grades with minimal operator intervention | تأثير عائد الاستثمار: Increases overall gold recovery by 38% compared to traditional sluicebased plants for typical alluvial feeds.
Integrated Water Recirculation System | الأساس الفني: Clarification tank or thickener module with return pumps | المنفعة التشغيلية: إعادة التدوير حتى 85% من المياه العملية, drastically reducing fresh water requirements and simplifying discharge compliance | تأثير عائد الاستثمار: Lowers water sourcing costs and mitigates environmental permitting risks.
Centralized Control & Monitoring Cabin | الأساس الفني: PLCbased control panel with key parameter sensors (ضغط, amp draw, معدل التغذية) | المنفعة التشغيلية: Allows a single operator to monitor and adjust the entire washing plant process from one location | تأثير عائد الاستثمار: Reduces operational labor requirements and enables rapid response to process upsets.

SkidMounted / تصميم وحدات | الأساس الفني: Bolttogether structural modules with integrated walkways and lifting points | Operational Benefit Enables faster onsite assembly (30% less time than fully fieldwelded builds) and future plant reconfiguration or relocation| ROI Impact Lowers installation costs and protects longterm asset flexibility
4. المزايا التنافسية
| مقياس الأداء | معيار الصناعة ل 500 نباتات الهيدروكربونات النفطية | هذا 500 TPH Gold Mining Washing Plant Solution | ميزة (% تحسين) |
| : | : | : | : |
| التوفر / الجهوزية| 8588% (downtime for unclogging/liner change)| >92% (engineered material flow & quickaccess liners)| +5% ل +8% more productive hours |
| Gold Recovery Rate| Varies significantly; ~8892% for fine gold (<100 شبكة)| Consistent recovery range of 9296% for 6mm material| +4% average increase in yield |
| Water Consumption| High fresh water demand; limited recirculation| Integrated closedloop system with >85% إعادة التدوير| حتى 80% reduction in fresh water use |
| استهلاك الطاقة (kWh/T)| Estimated 1.8 2.2 kWh/Ton processed| Optimized design targets 1.5 1.7 kWh/Ton processed| ~15% improvement in energy efficiency |
| وقت التجميع في الموقع| Extensive field welding; 812 weeks typical| Preassembled modular skids; target of 68 أسابيع| ~2530% faster commissioning |
5. المواصفات الفنية
القدرة التصميمية: Nominal 500 metric tonnes per hour (550 طن أمريكي في الساعة), variable based on specific gravity and clay content of feed material.
متطلبات الطاقة: إجمالي الحمل المتصل تقريبًا 800 950 كيلوواط. Configured for HV supply (6كيلو فولت/11 كيلو فولت) or stepdown transformers for LV distribution.
مواصفات المواد الرئيسية:
Scrubber Drum & Chute Liners: Abrasionresistant steel (AR400) or replaceable rubber composite.
الطوابق الشاشة: Modular polyurethane panels.
Concentrator Bowls/Beds:Ceramic or polyurethane wear surfaces.
الصلب الهيكلي:ASTM A36 painted or primed for severe service.
الأبعاد المادية (وحدات): Approximate footprint of 60m L x18m W x12m H . Configurations vary based on optional modules.
نطاق التشغيل البيئي: Designed for ambient temperatures from 20°Cto +50°C . Dust suppression spraysand enclosed conveyors are standard.
6. سيناريوهات التطبيق
LargeScale Alluvial Operation in West Africa
Challenge A concession holder neededto upgrade from multiple smaller plants (~200 TPH total)to a single highcapacity unitto reduce operating complexityand meet production targets.The existing setup sufferedfrom inconsistent fine gold recoveryand high fuel costsfor multiple power gensets
Solution Implementationofa singleline500 TPHgold mining washing plantwitha centralpower gensetand enhanced centrifugalconcentration array.The modular designallowedfor phasedcommissioningwithout haltingall existingproduction
Results The consolidatedoperation achieveda22 increasein tons processedper literof fuel Plant availabilityreached93 due toreduced transferpointsand simplifiedmaterial flow Overall recoveryfor the depositimprovedfroman estimated89to94
Eluvial / Saprolite Gold Project in South America
Challenge Processing highly weatheredclayrichmaterial thatconsistently blindedtrommel screensin previousplants causingfrequentstoppages Water sourcingwas expensiveand tailings dam managementwas acritical costfactor
Solution A500 TPHplant featuringan extralongscrubber sectionfor completeclay breakdownfollowedby linearvibratingscreens The systemincludedahighcapacitywater clarifiertomaximize recirculation
Results Screen blindingwas virtuallyeliminated maintainingdesign throughput Tailings densityincreased allowingfor asmallerfootprintimpoundment Freshwater consumptionwascutby75 deliveringpaybackonthe clarifiermodulein under14 months
7 الاعتبارات التجارية
Equipment pricing fora500 TPHgold mining washingplant is projectspecificbasedon configuration optionsand site conditions
PricingTiers
BasePlant Includescore scrubber screening primaryconcentrationand basiccontrolsystem
EnhancedPackage AddsadvancedPLC automation waterscirculationclarifier additionalconcentratorfor scavenger duty
TurnkeyPremium Includesall modules sparespackage onsite commissioning supervision training extendedwarranty
الميزات الاختيارية
Onboardpower generation package( diesel)
Oversizematerial secondaryscrubbingcircuit
Tailings dewateringpresses( filteror beltpress)
Comprehensiveinstrumentation package( densityflow meters)
Containerizedworkshop sparesstorage
ServicePackages Availableasannualcontracts includeperiodicinspections wearpart supply prioritytechnical support predictive maintenanceplanning
FinancingOptions Canbe structuredthroughpartner financial institutionsincludingleaseto own arrangementsor equipmentloans typicallyover36to60month terms Projectfinancingmaybe availablefor qualifieddevelopers
8 التعليمات
Whatis themaximumfeed sizeyour500 TPHwashingplant canaccept?
Thestandardfeed hopperand scrubberinletare designedfor materialupto250mm Optimalperformanceis achievedwithfeed lessthan150mm Largerprimarygrizzliescanbe addedas anoption
Howmanyoperatorsarerequiredtoruntheplant?
Thecentralizedcontrolsystemis designedformonitoringby asingleoperator Additionalgroundpersonnelare typicallyneededfor feedmanagement mechanicalchecksand concentratehandling Totalcrewof34personsper shiftis common
Cantheplant be relocatedafterinitialinstallation?
Yes themodular skiddeddesignfacilitatesdisassembly relocation andrecommissioning Relocationtimelinesdependonsite accesbutare significantlyshorterthanfordismantlingafield weldedstructure
Whatisthetypicalleadtimefromorderto commissioning?
Forastandardconfiguration leadtimeis approximately2632weeks Exworks Criticalpathitems includemajorfabricationsandlong leadtimecomponentslike largegearboxes Customizationsmayextendthistimeline
Doyouprovideperformanceguaranteesfortheplant?
Yes weofferperformanceguaranteeson throughput capacityunderdefinedfeed conditions mechanicalavailability andrecoveryefficiencybasedonrepresentative samplesofclientfeedmaterial Theseare detailedincommercialcontracts