Ystererts-breekaanleg-kontrakvervaardigersertifikaat
1. PYNPUNT GEDREWE OPENING
Bestuur jy onvoorspelbare deurset, buitensporige voeringslytasiekoste, en onbeplande stilstand in jou primêre vergruiskring? In iron ore processing, suboptimal primary crushing creates bottlenecks that ripple through your entire operation, directly impacting pellet and sinter feed consistency. Sleuteluitdagings sluit in:
Hoë skuurkoste: Constant exposure to hard, abrasive hematite or magnetite leads to premature crusher liner failure. Dit lei tot gereelde, costly shutdowns for replacement and significant consumable expenditure.
Deurvloei-inkonsekwentheid: An illsuited or aging primary crusher cannot maintain a steady feed to downstream grinding circuits, causing process instability and limiting overall plant capacity.
Ongeskeduleerde stilstand: Mechanical failures in critical components under high stress lead to catastrophic stoppages, jeopardizing production targets and maintenance budgets.
Size Distribution Issues: Inconsistent product sizing from the primary stage increases the load and energy consumption on secondary and tertiary crushers, raising your cost per ton.
Is your current solution equipped to handle the specific impact and abrasion of iron ore? Can you quantify your true cost of ownership from liner changes and energy use? The foundation of an efficient mineral processing plant begins with reliable, heavyduty primary comminution.
2. PRODUK OORSIG
Our engineered solution is a turnkey Iron Ore Crushing Plant Contract, centered on robust, highcapacity primary gyratory or jaw crushers specifically configured for dense, abrasive ironbearing rock. We deliver a complete system from runofmine (ROM) receiving to a defined crushed product for secondary processing.
Operasionele werkvloei:
1. ROM-ontvangs & Voorafskerm: Dump pocket or apron feeder receives direct haul truck feed. Grizzly screening removes subfines to bypass the crusher, doeltreffendheid te verbeter.
2. Primêre verplettering: The core heavyduty crusher reduces large lump ore (tot 1,5 m) to a manageable product size (tipies 250mm).
3. Materiaalhantering: Robust belt conveyors with impactresistant idlers transport crushed material.
4. Stockpiling or Direct Feed: Crushed ore is either stockpiled for blending or conveyed directly to the next stage of the beneficiation circuit.
Toepassingsomvang & Beperkings:
Omvang: Ideal for greenfield installations or brownfield upgrades requiring highcapacity (2,000 10,000+ tph), continuousduty primary crushing of hard iron ores.
Beperkings: Nie ontwerp vir finale produkgrootte nie; requires secondary/tertiary stages for fine crushing. Sitespecific geotechnical conditions must be evaluated for foundational support.
3. KERNKENMERKE
HeavyDuty Manganese Liners | Tegniese basis: Workhardening austenitic manganese steel | Bedryfsvoordeel: Liners develop a hardened surface layer during operation that resists cutting and gouging from abrasive ore | ROI impak: Velddata toon a 2035% increase in liner life compared to standard alloys, reducing part cost and changeout frequency.
Hydroset CSS-aanpassing | Tegniese basis: Hydraulic cylinder controls the crusher's closedside setting (CSS) | Bedryfsvoordeel: Operators can adjust product size or compensate for wear remotely under load in minutes | ROI impak: Maintains optimal throughput and product gradation without stopping production, maximizing crusher utilization.
Geïntegreerde Tramp Yster Beskerming | Tegniese basis: Hydraulic relief cylinders with automatic reset | Bedryfsvoordeel: Maak onbreekbare materiaal outomaties vry (bv., emmer tande, boorpunte) to prevent catastrophic damage to the main shaft and head | ROI impak: Eliminates risk of major mechanical failure and associated weekslong downtime; beskerm kernbate-integriteit.
Advanced Bearing Design | Tegniese basis: Largediameter spherical roller bearings with circulating oil lubrication | Bedryfsvoordeel: Supports extreme radial loads and delivers reliable performance under shock loading from large feed blocks | ROI impak: Bedryfstoetsing toon dat die dienslewe van die laer oorskry 50,000 hours under proper maintenance, ensuring longterm reliability.
PLCB-gebaseerde beheer & Moniteringstelsel | Tegniese basis: Centralized programmable logic controller with vibration sensors and temperature monitors | Bedryfsvoordeel: Verskaf intydse data oor draaggesondheid, smeer status, and power draw for predictive maintenance scheduling | ROI impak: Enables conditionbased maintenance planning over fixed schedules, preventing failures and optimizing component replacement cycles.
Modular Plant Design Philosophy | Tegniese basis: Preengineered structural modules for major assemblies (breker basis, wandelpaaie, vervoerband afdelings) | Bedryfsvoordeel: Reduces field fabrication time by up to 40%, accelerating commissioning schedules in remote locations | ROI impak: Lowers total installed cost through reduced onsite labor hours and gets your revenuegenerating asset operational faster.
4. MEDEDINGENDE VOORDELE
| Prestasie-metriek | Bedryfstandaard basislyn | Ons oplossing vir ystererts brekingsaanleg | Voordeel (% Verbetering) |
| : | : | : | : |
| Liner Life (Abrasive Hematite) | ~1.2 Million MT per set (Basislyn) ~1.6 Million MT per set (Basislyn) ~92% Uptime (Basislyn) ~0.12 kWh/tonne (Basislyn) ~8 Weeks OnSite Erection Time (Basislyn)| >1.6 Million MT per set >95% Optyd <0.10 kWh/ton <5 Weeks OnSite Erection Time| +33% +15% +17% 37%|
| Beskikbaarheid (Geskeduleerde looptyd) |
| Spesifieke energieverbruik |
| Installasie & Duur van ingebruikneming |
5. TEGNIESE SPESIFIKASIES
Kapasiteitsreeks: Konfigureerbaar vanaf 2,500 oor 9,000 ton per uur (tph), based on ore density (~2.8 t/m³), voer grootte verspreiding, en vereiste reduksieverhouding.
Primêre Crusher Opsies: Giratory Brekers (54"75" voer opening) or HeavyDuty Jaw Crushers.
Kragvereistes: Hoof breker dryfmotors van 300 kW tot 750 kW; totale aanleggekoppelde las wissel volgens konfigurasie.
Materiaalspesifikasies: Breker voerings in premiumgraad mangaanstaal; structural steelwork compliant with international standards; conveyor belts rated for highimpact MSHA applications.
Fisiese afmetings: Plant footprint is sitespecific but typically requires an area of approximately 40m x 60m including feed hopper discharge conveyor runoff.
Omgewingsbedryfsreeks: Designed for ambient temperatures from 30°C to +50°C with appropriate lube oil heaters/coolers; dust suppression systems are standard.
6. TOEPASSINGSSCENARIO'S
Greenfield Magnetite Concentrator Project
Uitdaging: A new mine required a primary crushing circuit capable of processing highly abrasive magnetite at 6,500 tph met >94% availability to meet stringent downstream grinding mill feed schedules.
Oplossing: Implementation of a turnkey iron ore crushing plant contract featuring a large gyratory crusher with automated setting adjustment and modular construction.
Resultate: Die aanleg het naambordkapasiteit binne twee weke ná ingebruikneming bereik. Availability averaged 96.2% in the first year of operation against a contractual target of 94%. Modular build reduced onsite construction labor costs by an estimated USD $350k.
Brownfield Hematite Processing Upgrade
Uitdaging: An existing operation faced escalating costs due to bimonthly liner changes in their old jaw crusher and inconsistent feed size causing bottlenecks in SAG mill throughput.
Oplossing: Replacement with our modern gyratorybased iron ore crushing plant solution designed for higher throughput with superior wear life.
Resultate: Liner life extended from approximately 60 dae tot 'n gemiddeld van 85 days—a direct reduction in consumable costs by nearly onethird per annum—while providing a more consistent 200mm product that improved SAG mill stability by approximately eight percent as measured by power draw consistency.
HighCapacity Direct Shipping Ore Operation
Uitdaging: A DSO producer needed extremely highvolume primary crushing (>8k tph) but had limited space available at their rail loadout facility due to existing infrastructure constraints
Oplossing: A compact yet highcapacity gyratory configuration paired with steepangle conveying systems was engineered specifically within tight spatial parameters
Resultate: The tailored design met all throughput requirements while fitting into only eighty percent of the space originally thought necessary saving significant capital that would have been required for site earthworks modifications
HighCapacity Direct Shipping Ore Operation
Uitdaging A DSO producer needed extremely highvolume primary crushing (>8k tph) but had limited space available at their rail loadout facility due existing infrastructure constraints Oplossing A compact yet highcapacity gyratory configuration paired steepangle conveying systems was engineered specifically within tight spatial parameters Resultate The tailored design met all throughput requirements while fitting into only eighty percent space originally thought necessary saving significant capital would have been required site earthworks modifications
HighCapacity Direct Shipping Ore Operation
Uitdaging A DSO producer needed extremely highvolume primary crushing (>8k tph) but had limited space available at their rail loadout facility due existing infrastructure constraints Oplossing A compact yet highcapacity gyratory configuration paired steepangle conveying systems was engineered specifically within tight spatial parameters Resultate The tailored design met all throughput requirements while fitting into only eighty percent space originally thought necessary saving significant capital would have been required site earthworks modifications
HighCapacity Direct Shipping Ore Operation
Uitdaging A DSO producer needed extremely highvolume primary crushing (>8k tph) but had limited space available at their rail loadout facility due existing infrastructure constraints Oplossing A compact yet highcapacity gyratory configuration paired steepangle conveying systems was engineered specifically within tight spatial parameters Resultate The tailored design met all throughput requirements while fitting into only eighty percent space originally thought necessary saving significant capital would have been required site earthworks modifications
HighCapacity Direct Shipping Ore Operation
Uitdaging A DSO producer needed extremely highvolume primary crushing (>8k tph) but had limited space available at their rail loadout facility due existing infrastructure constraints Oplossing A compact yet highcapacity gyratory configuration paired steepangle conveying systems was engineered specifically within tight spatial parameters Resultate The tailored design met all throughput requirements while fitting into only eighty percent space originally thought necessary saving significant capital would have been required site earthworks modifications
HighCapacity Direct Shipping Ore Operation
Uitdaging A DSO producer needed extremely highvolume primary crushing (>8k tph) but had limited space available at their rail loadout facility due existing infrastructure constraints Oplossing A compact yet highcapacity gyratory configuration paired steepangle conveying systems was engineered specifically within tight spatial parameters Resultate The tailored design met all throughput requirements while fitting into only eighty percent space originally thought necessary saving significant capital would have been required site earthworks modifications
HighCapacity Direct Shipping Ore Operation



