Harga Hammer Mill Handelaars Versending
1. PYNPUNT GEDREWE OPENING
Bestuur jy die herhalende koste en operasionele knelpunte van jou grootteverminderingsproses? Inconsistent particle size, oormatige slytasie deel vervanging, and unplanned downtime directly impact your bottom line. Common challenges with hammer mill operations include:
Hoë instandhoudingskoste: Gereelde vervanging van hamers, skerms, and liners due to premature wear from abrasive materials or improper impact dynamics.
Production Inconsistency: Fluctuating output fineness and capacity caused by screen clogging, rotor imbalance, or inadequate air handling, leading to product quality issues.
Oormatige energieverbruik: Inefficient grinding chambers and drive systems that draw more power than necessary for the required throughput, operasionele uitgawes opblaas.
Onbeplande stilstand: Failures of critical components like bearings or the rotor shaft, often resulting from overheating or vibration outside of design parameters, jou hele verwerkingslyn stop.
How do you control these variables to achieve predictable throughput, consistent product specs, en laer koste perton? The answer lies in selecting a hammer mill engineered to address these specific failure points.
2. PRODUK OORSIG: INDUSTRIAL HEAVYDUTY HAMMER MILL
This equipment is a directdrive or beltdriven secondary/tertiary crusher and grinder designed for highvolume reduction of mediumhard to soft materials. Its core function is to transform feed stock into a predetermined particle size through controlled impact fragmentation.
Operasionele werkvloei:
1. Voer Inleiding: Material is fed via vibratory feeder or conveyor into the grinding chamber.
2. Impak & Grootte verkleining: A highspeed rotor assembly with freely swinging or fixed hammers repeatedly strikes the incoming material, shattering it upon impact with the hammers and against the integrated breaker plate.
3. Deeltjie Klassifikasie: Groot deeltjies gaan deur 'n geperforeerde skerm wat die rotorkamer omring; particles larger than the screen apertures are retained for further impact.
4. Ontslag & Air Handling: Reduced material exits via gravity or is conveyed pneumatically; optional integrated fan systems assist material flow and control dust.
Toepassingsomvang: Ideaal vir die verwerking van aggregate, kalksteen, herwonne konstruksiemateriaal, houtafval, biomassa, en sekere industriële minerale. Not suited for highly abrasive materials (bv., silica sand without specialized linings) or very hard materials (above Mohs 7) waar slytasiekoste buitensporig word.
3. KERNKENMERKE
Omkeerbare rotorstelsel | Tegniese basis: Symmetrical rotor design allows endforend reversal of hammer sets | Bedryfsvoordeel: Operators can utilize both leading edges of each hammer, doubling service life before changeout | ROI impak: Verminder hamervoorraadkoste met tot 50% and extends maintenance intervals by an estimated 100%
Gesegmenteerde dravoerings | Tegniese basis: Bolton liner plates manufactured from AR400 or chromium carbide steel | Bedryfsvoordeel: Enables targeted replacement of worn sections in highimpact zones without removing entire mill housing | ROI impak: Lowers liner replacement cost by approximately 30% and reduces liner change downtime by an estimated 40%
Dinamiese lugvloeiontwerp | Tegniese basis: Berekeningsvloeistofdinamika (CFD)optimized chamber geometry and optional induceddraft fan | Bedryfsvoordeel: Prevents screen blinding by efficiently removing fines, maintains steady throughput, and reduces heat buildup | ROI impak: Improves sustained capacity by 1520% and contributes to more stable power consumption
Vibrasie-moniteringsblokkies | Tegniese basis: Integrated machined mounting pads for permanent vibration sensors | Bedryfsvoordeel: Facilitates predictive maintenance by allowing direct monitoring of rotor balance and bearing condition | ROI impak: Helps prevent catastrophic bearing/rotor failures, potentially saving over 90% of associated repair costs and production losses
QuickChange Screen Cartridge | Tegniese basis: Slideout screen frame assembly with hydraulic or manual unlocking mechanism | Bedryfsvoordeel: Laat volskermverandering in onder toe 30 minutes versus several hours with traditional boltin designs | ROI impak: Minimizes downtime for product size changes or screen maintenance, verhoging van plant beskikbaarheid
4. MEDEDINGENDE VOORDELE
| Prestasie-metriek | Bedryfstandaard Norm | Ons Hammer Mill Oplossing | Gedokumenteerde voordeel |
| : | : | : | : |
| Tonnage per Hammer Set Life (Skuur kalksteen) | 80,000 100,000 Tonne | 180,000 220,000 Tonne | +110% Verbetering |
| Skermwisseltyd (Volledige prosedure) | 2.5 4 Ure | <45 Minute (with cartridge system)| Tot 81% Tydbesparing |
| Spesifieke energieverbruik (kWh/ton) Wissel volgens materiaal| Basislyn = X kWh/ton| X 12% kWh/ton| Tot 12% Verbetering |
| Gemiddelde tyd tussen mislukking (MTBF) Kritieke laers| ~8 000 Bedryfsure| >12,000 Bedryfsure| +50% Verbetering |
5. TEGNIESE SPESIFIKASIES
Kapasiteitsreeks: Modelafhanklik van 15 TPH tot verby 300 TPH for aggregate applications.
Kragvereistes: Van 75 kW (100 HP) aan 750 kW (1000 HP), configured for VFD or direct online starting.
Rotorsamestelling: Soliede staal smee of vervaardigde staalplaat; deursnee van 800mm tot 1800mm; width commensurate with capacity.
Materiaalspesifikasies: Housing – Mild steel plate with AR400/AR500 liners; Hammers – Forged alloy steel with tungsten carbide hardfacing options; Screens – Hardened manganese or stainless steel perforated plate.
Fisiese afmetings (Voorbeeld Model): Ongeveer. Lengte: 3.5m; Width 2.8m; Height 2.2m (voerbak uitgesluit).
Omgewingsbedryfsreeks: Ontwerp vir omgewingstemperature van 20°C tot +45°C; dusttight housing rated for typical indoor/outdoor industrial installation.
6. TOEPASSINGSSCENARIO'S
Aggregaat & Limestone Quarrying Plant
Challenge A midsized quarry faced excessive downtime every six weeks for hammer rotation and liner replacement on their primary secondary crusher hammer mill costing over $25k annually in parts alone plus production losses.
Solution Implementation of our heavyduty hammer mill featuring the reversible rotor system and segmented wear liners was completed during a planned shutdown.
Results Field data shows a reduction to four maintenance events annually with parts consumption down by approximately $14k per year combined with an estimated $18k savings in recovered production time—delivering full payback on the equipment in under two years.
Municipal Solid Waste Recycling Facility
Challenge Processing construction & demolition debris led to frequent screen clogging from fibrous materials variable feed density causing hourly throughput swings between extremes requiring constant operator intervention.
Solution Installation included our model optimized with dynamic airflow design ensuring consistent negative pressure within the grinding chamber paired with a quickchange screen system
Results Operators report stable operation achieving nameplate capacity consistently Screen blinding incidents reduced by over % allowing one operator to manage multiple lines Quantifiable results show a % increase in monthly processed tonnage using similar energy input
7 KOMMERSIËLE OORWEGINGS
Equipment pricing is structured across three primary tiers based on capacity robustness:
1 Standard Duty Models Engineered for consistent nonabrasive materials like wood biomass Base pricing includes standard manganese hammers screens
2 Heavy Duty Models The most common selection for aggregate mineral processing Includes reversible rotors segmented liners highergrade bearings
3 Severe Duty Models Configured for challenging applications featuring maximum hardfacing premium bearing packages advanced monitoring interfaces
Optional Features Upgrades include automated lubrication systems explosion suppression packages various inlet chute designs special alloy screens
Service Packages Available plans range from basic preventative maintenance kits through comprehensive annual inspection programs up to full performanceguaranteed service contracts covering parts labor
Financing Options Flexible commercial structures are available including capital lease operating lease longterm rental purchase agreements tailored support project financing models
8 Gereelde vrae
Q What are my options if my feed material abrasiveness changes after purchase?
A The modular wear protection system allows adaptation You can upgrade liner hammer materials during scheduled service intervals without replacing the core mill structure
Q How does this hammer mill handle wet or sticky feed material?
A While all mills have limitations operational protocols combined with optional breaker plate designs internal air evacuation can mitigate issues We recommend providing sample material for controlled testing at our facility
Q What is required for foundation installation?
A Detailed foundation drawings anchor bolt templates are provided All models require a reinforced concrete foundation sized appropriately based on dynamic loads Vibration isolation pads are an available option
Q Can this equipment integrate with my existing PLC control system?
A Yes standard models provide hardwired signals start/stop fault Modern units offer optional Profibus Ethernet/IP communication modules for full integration into plant SCADA systems
Q What is the typical lead time from order commissioning?
A Lead times vary based on model specification complexity Current standard lead times range between weeks Custom configurations may require additional engineering time


