Harga Hammer Mill Company Sample
HPA4000 HeavyDuty Hammer Mill | Engineered for Uninterrupted Mineral Reduction
1. PYNPUNT GEDREWE OPENING
Are escalating operational costs and unplanned downtime eroding your mineral processing margins? Plant managers and engineering contractors consistently face three critical challenges in size reduction operations:
Oormatige stilstand vir instandhouding: Frequent wear part replacement halts your entire crushing circuit. Industry data indicates that standard hammer mills can require liner and hammer changes every 400600 hours in abrasive applications, meer as kos 50 hours of annual production time per unit.
Inkonsekwente uitsetgradasie: Fluctuations in feed material hardness or moisture content lead to an offspec product, causing bottlenecks in downstream processes and potential rejections.
Unscheduled Bearing Failures: Contamination ingress and imbalanced rotor assemblies cause catastrophic bearing failures, resulting in repair costs exceeding $15,000 and multiday production stoppages.
Hoe bereik jy konsekwente deurset, totale koste van eienaarskap te verminder, and protect your operation from costly interruptions? The solution requires a hammer mill engineered not just to process material, but to withstand the demands of continuous industrial service.
2. PRODUK OORSIG
The HPA4000 is a heavyduty, industrial hammer mill designed for primary, sekondêr, or tertiary reduction of mediumhard to hard minerals such as limestone, gips, steenkool, and phosphate rock. Its design prioritizes durability and controlled fragmentation for aggregate production, mynvoorverwerking, en industriële minerale voorbereiding.
Operasionele werkvloei:
1. Beheerde voer: Material is introduced via a regulated feed conveyor into the mill’s reinforced feed chute.
2. Impakvermindering: A highinertia rotor assembly with dynamically balanced hammers accelerates material into the manganese steel breaker plates.
3. Grootte Klassifikasie: Processed material passes through a heavyduty grate screen; particles meeting spec exit, terwyl oormaat materiaal behou word vir verdere vermindering.
4. Ontslag & Transport: Sized material is discharged for conveyance to the next stage in your processing circuit.
Toepassingsomvang & Beperkings:
Ideaal vir: Mediumhard materials (tot 8 Mohs), dry or slightly moist feeds requiring top sizes from 50mm down to 3mm.
Nie aanbeveel vir: Ultraabrasive materials like silica sand without specific liner configurations, highly sticky or claybound feeds without prescreening, or applications requiring submillimeter pulverization.
3. KERNKENMERKE
Omkeerbare rotorstelsel | Tegniese basis: Symmetrical rotor design with hardfaced hammer mounting points | Bedryfsvoordeel: When the leading edges of hammers wear, operators can reverse the rotor direction or flip hammers to utilize a second cutting edge without disassembly downtime | ROI impak: Doubles service intervals for hammer sets, reducing parts consumption by up to 40% jaarliks.
Segmented Breaker Plates & Grates | Tegniese basis: Individual highchrome cast alloy sections secured with captive bolts | Bedryfsvoordeel: Worn sections can be replaced individually in under two hours instead of replacing an entire liner assembly | ROI impak: Verminder stilstandtyd vir die vervanging van voerings deur 70% and reduces consumable inventory costs.
Labirint seël & AirPurge Bearing System | Tegniese basis: Multistage dust exclusion seals supported by a regulated air purge | Bedryfsvoordeel: Creates positive pressure to prevent abrasive dust ingress into main rotor bearings | ROI impak: Extends bearing service life by a documented minimum of 300%, eliminating unscheduled bearing failures.
Dinamiese balansering & Vibrasie-moniteringsblokkies | Tegniese basis: Factorybalanced rotor with integrated sensor mounting points on the housing | Bedryfsvoordeel: Allows for routine vibration trend monitoring; enables predictive maintenance scheduling before imbalance causes damage | ROI impak: Prevents cascading component failures, protecting against an average of $25k in unexpected repair costs.
QuickAccess Onderhoudsdeure | Tegniese basis: Hydraulicallyassisted side and top doors with integrated safety interlocks | Bedryfsvoordeel: Bied volle toegang tot slypkamer vir inspeksie, skerm veranderinge, or cleanup in minutes without overhead crane dependency | ROI impak: Reduces standard maintenance window duration by over 60%, returning the mill to production faster.

4. MEDEDINGENDE VOORDELE
| Prestasie-metriek | Bedryfstandaard (Mededinger Gem.) | HPA4000 Hammer Mill Solution | Voordeel (% Verbetering) |
| : | : | : | : |
| Wear Part Service Life (Skuurerts) | 550 Bedryfsure | 850 Bedryfsure | +55% Langer Lewe |
| Skermverandering Arbeidstyd (2persoon bemanning) | 4.5 Ure | 1.75 Ure | 61% Less Downtime |
| Spesifieke energieverbruik (kWh/ton) Gedokumenteer| ~1.8 kWh/ton @ 10mm output| ~1.65 kWh/ton @ 10mm output| 8.3% Laer energieverbruik |
| Annual Bearing Replacement Rate (24/7 Op.)| >1.0 per year per mill| <0.33 per year per mill| 67% Fewer Replacements |
5. TEGNIESE SPESIFIKASIES
Kapasiteitgradering: 120 180 TPH (dependent on feed material and target output size)
Kragvereistes: Hoofaandrywing motor: 400 kW (500 HP), WEG Premium Efficiency IE3
Rotorsamestelling: Deursnee: 1500mm; Breedte: 2000mm; Spoed: ~750 RPM
Materiaalspesifikasies: Housing – Fabricated AR400 Steel; Hammers – Forged Alloy Steel with Tungsten Carbide Tips (Standaard); Breker Plate / Grates – HiChrome Alloy Castings
Fisiese afmetings (L x B x H): Ongeveer. 3m x 2m x 2m
Omgewingsbedryfsreeks: Omgewingstemperatuurreeks (20°C tot +45°C); Dusttight construction rated up to IP65
6. TOEPASSINGSSCENARIO'S
Aggregate Produksie-aanleg – Kalksteenverwerking
Challenge A quarry operation experienced premature failure of standard hammers every three weeks when processing abrasive silicacontaminated limestone belts.
Solution Implementation of two HPA4000 hammer mills configured with tungsten carbidetipped reversible hammers.
Results Wear part life extended to seven weeks per set; annual consumable costs reduced by $42k per mill; plant achieved scheduled maintenance alignment with other circuit components.
Industrial Mineral Processing – Gypsum Preparation
Challenge Inconsistent moisture content in feedstock caused frequent clogging of discharge grates in an existing mill system.
Solution The HPA4000 was installed with an optional internal breaker plate heating system and larger openarea grate design.
Results Clogging incidents reduced from weekly occurrences to fewer than four per year; plant throughput stabilized at design capacity of 150 TPH regardless of seasonal feedstock variations.
7. KOMMERSIËLE OORWEGINGS
The HPA4000 hammer mill is offered as a complete package including motor drives,V-bande,and starter equipment on a common base frame.
Prysvlakke & Opsies
Basiskonfigurasie (HPA4000STD): Includes standard alloy hammers and manganese liners.
HighAbrasion Pakket (HPA4000HA): Upgraded tungsten carbidetipped hammers and chrome alloy liners (~+18% investment).
Automation Ready Package (HPA4000AR): Includes vibration sensors,temperatuur sondes,and integration wiring for plant SCADA systems (~+12% investment).
Dienspakkette:
1jaar / 2000hour comprehensive parts & labor warranty included.Factorysupported annual inspection contracts available.Extended wearpart supply agreements offer guaranteed pricing.
Financing options include capital lease agreements tailored for municipal contractors,mine development projects,and private aggregate producers seeking predictable monthly expenditure models over 36, 60, or 84month terms.Equipment tradein programs are evaluated casebycase
8. Gereelde vrae
Q What are the primary factors that determine throughput capacity?
A Capacity is dictated by feed material bulk density,Bond Work Index hardness,and target output size.A detailed lab analysis of your sample determines precise tonnage ratings
Q Is this hammer mill compatible with our existing PLC control system?
A Yes.The HPA4000 control panel includes standard Modbus TCP/IP protocol outputs.All critical operational data can be integrated into most modern plant control rooms
Q What is the expected lead time from order placement?
A Standard configuration units ship within 14 weeks.Custom configurations may require additional engineering time which will be specified during project quotation
Q How does this design address operator safety?
A The unit exceeds CE standards featuring zeromotion electrical interlocks on all access doors ensuring the rotor cannot be energized during inspection Hydraulic door assists eliminate manual handling risks
V Word prestasiewaarborge verskaf?
A Yes.Based on certified lab analysis of your provided feedstock we guarantee final product gradation curves within +/5%and specific energy consumption figures as quoted


