250 300tph Stone Crushing Plant Company Moq
1. PYNPUNT GEDREWE OPENING
Are you managing a midtolarge scale aggregate production operation and facing persistent bottlenecks that cap profitability? Vir aanlegbestuurders en ingenieurskontrakteurs, 'n 250300tph-klipbreekaanleg verteenwoordig 'n kritieke produksievlak waar ondoeltreffendheid tot beduidende finansiële impak lei. Algemene uitdagings sluit in:
Inkonsekwente deurset: Unplanned downtime from feeder to crusher mismatches or conveyor bottlenecks, losing hundreds of tons per shift.
Hoë bedryfskoste: Spiking wear part consumption in secondary/tertiary stages and excessive energy use per ton of finished aggregate.
Produk Kwaliteit Afwyking: Inability to consistently meet multiple spec products (bv., 3/4" totaal, 1/2" skyfies, vervaardigde sand) from variable feed material.
Excessive Footprint & Opsteltyd: Modular plants that require extensive civil works and complex interconnection, delaying commissioning and ROI.
Die sentrale vraag is: how do you achieve reliable 250300tph output with lower costperton, vereenvoudigde instandhouding, and the flexibility to adapt to changing project demands?
2. PRODUK OORSIG
Hierdie 250300tph stilstaande klipbreekaanleg is 'n volledige, engineered solution designed for continuous, hoëvolume produksie van aggregate vir padbasis, beton, en asfalttoepassings. It is configured for primary, sekondêr, and tertiary crushing stages to produce precisely graded end products.
Operasionele werkvloei:
1. Primêre vermindering: Groot steengroefrots (tot 750 mm) is fed into a primary jaw crusher for initial size reduction.
2. Sekondêre verplettering & Sifting: The output is conveyed to a secondary cone crusher. A primary screen separates sized material, routing oversize back for further crushing.
3. Tersiêre Vorming & Finale grootte: Material requiring additional shaping is processed through a tertiary cone or impact crusher. Final screening decks separate the output into 35 specified product stockpiles.
Toepassingsomvang: Ideaal vir toegewyde aggregaatgroewe, large infrastructure project support bases, and highdemand commercial concrete operations.
Beperkings: This plant configuration requires stable, hard rock feed (graniet, basalt, kalksteen). For very abrasive or highsilica content materials, specific liner metallurgy is recommended. It is not a portable solution and requires planned foundation work.
3. KERNKENMERKE
Modulêre voorsamestelling | Tegniese basis: Skidmounted major component assemblies | Bedryfsvoordeel: Verminder ter plaatse installasie tyd met tot 40% versus komponent-vir-komponent bou | ROI impak: Faster commissioning allows revenue generation to begin weeks earlier.

Intelligente Crushing Chamber Design | Tegniese basis: Optimized cavity geometry and kinematics | Bedryfsvoordeel: Increases yield of inspec product on first pass by an estimated 1520%, die hersirkulasielading te verminder | ROI impak: Directly lowers energy consumption and wear on crushers per ton of final product.
Gesentraliseerde PLC-outomatiseringstelsel | Tegniese basis: Programmeerbare logiese beheerder met raakskerm-HMI | Bedryfsvoordeel: Aktiveer enkeloperateur beheer van die hele vloei, monitors motor loads, en verskaf foutdiagnostiek | ROI impak: Reduces labor requirements for routine operation and minimizes downtime through predictive alerts.
HeavyDuty Vibrerende Grizzly Voeder | Tegniese basis: Robust sectionalized grizzly bars & high Gforce vibration | Bedryfsvoordeel: Effectively scalps fines ahead of the primary crusher and ensures consistent, gereguleerde voer | ROI impak: Protects primary crusher from unnecessary wear caused by fines packing and prevents chokefeeding.
Unified Walkway & Onderhoudstoegang | Tegniese basis: Integrated platform design around all major service points | Bedryfsvoordeel: Bied veilige, maklike toegang vir daaglikse inspeksies, voering veranderinge, and belt maintenance | ROI impak: Cuts scheduled maintenance time significantly improves technician safety compliance.
4. MEDEDINGENDE VOORDELE
| Prestasie-metriek | Bedryfstandaard vir 250300tph-plante | Hierdie plantoplossing | Voordeel (% verbetering) |
| : | : | : | : |
| Tonnage Konsekwentheid (Monthly Availability) | 9294% operasionele beskikbaarheid | >96% operasionele beskikbaarheid (ontwerp teiken) | +24% beskikbaarheid |
| Energieverbruik (kWh/ton) Varieer volgens rotstipe. Baseline set at industry average. Industry Average Baseline = X kWh/ton Estimated X 0.88 kWh/ton Estimated reduction of ~12% |
| Dra Koste ($/ton) Secondary Stage Secondary Crusher Wear Cost Secondary Crusher Wear Cost Focus on chamber design & material flow reduces abrasive wear Estimated reduction of ~1015% |
| On-Site Ingebruikneming Tyd (Weke) Componentbycomponent build Modular skid assembly Field data shows reduction of ~3040% |
5. TEGNIESE SPESIFIKASIES
Ontwerp kapasiteitsreeks: 250 300 metrieke ton per uur (275 330 Amerikaanse tph), afhanklik van voermateriaal hardheid en grootte verspreiding.
Primêre Breker: Kaakbreker model [bv., JC5460], Feed Opening suitable for up to 750mm rock.
Sekondêre Breker: Cone Crusher Model [bv., MC350], with hydraulic adjustment and clearing.
Tersiêre Breker: Cone or Vertical Shaft Impact (ALMAL) Breker Model [bv., TC260 or VSI2800] for shaping/fine production.
Siftingseenhede: Multideck vibrating screens (tipies 23 eenhede), sizes tailored to final product specifications.
Kragvereistes: Totale geïnstalleerde krag ongeveer 800 1000 kW. Requires dedicated highvoltage connection as per local grid.
Sleutel materiaal spesifikasies: Hoofraamstruktuur; Heavyduty steel plate. Conveyor idlers; CEMA C/D rated bearings. Screen meshes; Hightensile wire or polyurethane panels.
Geskatte voetspoor (L x W): ~85m x 45m (280' x 150'), onderhewig aan finale uitlegkonfigurasie.
Omgewingsbedryfsreeks: Designed for 20°C to +45°C ambient temperature with appropriate lubrication systems.
6. TOEPASSINGSSCENARIO'S
[Regional Granite Quarry] Uitdaging: An established quarry needed to upgrade from a 200tph system to meet new highway contract demands without expanding its operational footprint or significantly increasing crew size.
[Large Infrastructure Project Dam Construction] Uitdaging: A remote dam construction site required consistent production of multiple aggregate specifications (from riprap to fine aggregates) with limited technical personnel available onsite.
[Commercial Asphalt Producer] Uitdaging: A producer aimed to increase yield of highvalue manufactured sand from their limestone feed while maintaining strict gradation control for asphalt mixes.
[Oplossing]: Implementation of this modulardesigned plant allowed the existing footprint to be utilized efficiently. The centralized PLC system enabled management of the higher throughput with the same operator team.
[Oplossing]: A ruggedized version was supplied with preassembled modules. The design prioritized reliability over ultimate flexibility.
[Oplossing]: Integration included a tertiary stage VSI crusher. The automation system was programmed with specific recipes for different sand products.
[Resultate]: Volgehoue uitset van 280tph bereik. Plant availability increased from under 95%, meeting supply obligations on schedule without added labor costs.
[Resultate]: Plant commissioned in months typical timeline). Achieved reliable >260tph output in harsh conditions with minimal specialist intervention required.
[Resultate]: Increased saleable sand yield by >22%. Produkkonsekwentheid het dramaties verbeter. Allowed entry into new markets requiring precise filler material.
7. KOMMERSIËLE OORWEGINGS
Our solutions are offered in clear pricing tiers based on core configuration:
Tier A – Base Plant Configuration includes primary jaw crusher secondary cone crushers primary screen core conveyors central control cabin
Tier B – Enhanced Configuration adds tertiary crushing stage additional final screening decks dust suppression system
Tier C – Turnkey Premium Configuration includes all above plus full electrical switchgear package advanced automation with production reporting preassembly services
Optional features include automated lubrication systems metal detection tramp iron relief systems sound enclosures
Service packages are available separately ranging from basic commissioning supervision through comprehensive multiyear maintenance agreements including parts kits
Financing options can be discussed including equipment leasing structures tailored for capital expenditure cycles typical in the aggregates industry
8.Gereelde vrae
Q1 Is this plant compatible with our existing primary feeding system or stacker conveyor?
A1 Yes provided your existing feeder or stacker can handle the required steadystate tonnage up to Our engineering team can review interface points like hopper dimensions discharge heights transfer chute designs
Q2 What is the expected operational impact during liner changes on the secondary cone crushers?
A2 With standard tooling field data indicates a trained twoperson crew can complete mantle concave replacement in Downtime can be further reduced with optional hydraulic assist kits
Q3 How does this plant manage variations in feed material hardness which we commonly experience?
A3 The PLC system monitors motor loads adjusting feeder rates accordingly Secondary tertiary crushers feature hydraulic adjustment allowing closedside setting changes under load within limits adapting quickly without stopping production
Q4 Are spare parts packages included in the initial purchase price?
A4 No spare parts are quoted separately We recommend an initial wear parts kit based on projected This ensures critical components are on hand minimizing potential downtime due to logistics delays
V5 Watter vlak van operateuropleiding word verskaf?
A5 Comprehensive training is included covering normal operation startup shutdown sequences basic troubleshooting safety procedures Training occurs during commissioning both classroom style handson at controls Typically spans
Q6 Can this plant be reconfigured later if our product focus shifts e.g more emphasis on manufactured sand?
A6 The modular design allows reconfiguration Adding a VSI crusher as an additional tertiary stage or modifying screen decks are common future modifications Civil foundation planning initially considers such potential expansions
Q7 What are standard payment terms delivery lead times?
A7 Standard commercial terms involve progress payments tied milestones like order confirmation completion factory testing shipment Lead times typically range order confirmation depending current manufacturing schedule complexity chosen options


